Advises That Diesel Generator Starting Times Up to 25 or Less Acceptable Per 820924 Tech Spec Change Request
ML17139B834
Person / Time
Site: Susquehanna 
Issue date: 09/28/1983
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8310110462
Download: ML17139B834 (6)


Text

~P. REoy~

+~

po Op 00

%0'>>*+"

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SEP 2 8 1983 Docket No. 50-387 Mr. Norman M. Curtis Vice President Engineering and Construction -'uclear Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Curtis:

Subject:

Diesel Generator Surveillance Requirement Technical Specification 4.8.1.1.2.d.12 In a letter dated September 24,

1982, PP8L requested a change to Technical Spec'ification 4.8.1. 1.2.d. 12 to read as follows:

"Verifying that with all diesel geIIerator air start receivers pressurized to less than or equal to 240 psig and the compressors

secured, the diesel generator starts at least 5 times from ambient conditions and accelerates to at least 600 RPM in less than or equal to 10 seconds for the initial start and less than or equal to 25 seconds for each subsequent start."

Supplemental information concerning the above Technical Specification was provided to the NRC staff in letters from PP8L dated July 9, 1982; July 14, 1982; September 2,

1982; and January 7,

1983.

ECCS 'analysis for diesel generator starting times up to 25 seconds was provided by PP8L.

The NRC staff has evaluated PPSL's submittals and concluded that the peak clad temperatures will not be exceeded with diesel generator starting times up to 25 seconds or less for the limiting case of the large break loss of coolant accident.

Based on this evaluation diesel generator starting times up to 25 seconds or less are acceptable for Susquehanna.

eslo<loaEz sioqa8 l

,'... PDR ADOCK 0

r J 4

SEP 2 8 1983 Since the conditions stated above are unique to Susquehanna, the NRC staff has determined that based on the licensee's design criteria, test results, and the FSAR, Technical Specification 4.8. 1. 1.2.d. 12 should read:

"Verifying that with all diesel generator air start receivers pressurized to less than or equal to 240 psig and the compressors

secured, the diesel generator starts at least 5 times from ambient conditions and accelerates to at least 600 rpm in less than or equal to 10 seconds for the first 2 starts and accelerates to at least 600 rpm in less than or equal to 25 seconds for each of the remaining 3

starts."

PPSL concurrence to the staff position is requested within 15 days of receipt of this letter.

If you have any questions regarding this matter, please

contact, R. Perch, Project Manager.

Sincerely, cc:

See next page 0&gioa1 Gfgaeh '.~7:

A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing DL:LB¹2/PM RLPerch:pt 9/t</83 DL.LB¹2/BC ASchwencer 9/P/

/83 DISTRIBUTION:

Document Control NRC PDR Local PDR NSIC PRC LB¹2 File EHyl ton RLPerch

ELJordan, DEQA:IE JMTaylor, DRP:IE
Wagner, OELD Region I ACRS

(,16)

I 1

Susquehanna.

Mr. Norman W. Curtis Vice President Engineering and Construction Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 ccs:

Jay Silberg, Esquire Shaw, Pittman; Potts 5 Trowbridge 1800 M Street, N.

W.

Washinqton, D. C. 20036 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. William E. Barberich Nuclear Licensing Group Supervisor Pennsylvania Power 8 Light Company

~ 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. G.

Rhodes Resident Inspector P. 0.

Box 52 Shickshi,nny, Pennsylvania 18655 Gerald R. Schultz, Esquire Susquehanna Environmental Advocates P. 0.

Box 1560 Wilkes-Barre, Pennsylvania 18703 Ms. Colleen'arsh P. 0. Box 538A, RD 84 Mountain Top, Pennsylvania 18707 Mr. Thomas J. Halligan Correspondent The Citizens Against Nuclear Dangers P. 0.

Box 5

Scranton, Pennsylvania 18501 Mr. J.

W. Millard Project Manager Mail Code 395 General Electric Company 175 Curtner Avenue San Jose, California 95125 Robert W. Idler, Esquire Office of Attorney General 505 Executive House P. 0.

Box 2357 Harrisburg, Pennsylvania 17120 Mr. E. B. Poser Project Engineer Bechtel Power Corporation P. 0. Box 3965 San Francisco, California 94119 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Mr. Thomas M. Gerusky, Director Bureau.of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsylvania 17120