ML17139B628
| ML17139B628 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/08/1983 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17139B629 | List: |
| References | |
| NUDOCS 8307190440 | |
| Download: ML17139B628 (2) | |
Text
Docket No. 50-387 JUL 8 1983 Pennsylvania Power 8 Light Company ATTN:
Nr. Norman W. Curtis Vice President - Engineering Two North Ninth Street Allentown. Pennsylvania 18101 Gentlemen:
On July 17, 1982, the Comoission issued Operating License NPF-14 (five percent power) for the Susquehanna Unit l.
On November 12. 1982, the license was amend-ed to authorize full power (100Ã) operation.
As required by 10 CFR 170.21, an operating license fee of $1,024,500 was paid for the issuance of the operating license.
In accordance with Footnote 3 of Section 170.21, the costs incurred in the processing and issuance of the Susquehanna operating license have been reviewed and they substantially exceed the maximum fee of $1,024,500 prescribed by the Comission's regulations.
Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for Susquehanna Unit 1.
Sincerely, P13ginal Sign0Q h'g>
iWm,.G. 3filler William 0. Hiller. Chief License Fee Management Branch Office of Administration DISTRIBUTION:
Docket File (w/cy of PDR LPDR Manpower File CJHolloway, LFMB
- RMDiggs, LFMB
LFMB:
DM CJ oway
/
/83 LFMB:
JDWei f
2/ +g /83 ORRICC~
SURMAMS~
NRC FORM 318 (10.80) NRCM 0240 LFMB'ADM WOMiller
/
/83 OFFICIAL RECORD COPY
I h
ga h
C t
~is