ML17139B628

From kanterella
Jump to navigation Jump to search
Informs That Processing & Issuance Costs for OL Exceeded Max Fee.No Addl Fee Required
ML17139B628
Person / Time
Site: Susquehanna 
Issue date: 07/08/1983
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139B629 List:
References
NUDOCS 8307190440
Download: ML17139B628 (2)


Text

Docket No. 50-387 JUL 8 1983 Pennsylvania Power 8 Light Company ATTN:

Nr. Norman W. Curtis Vice President - Engineering Two North Ninth Street Allentown. Pennsylvania 18101 Gentlemen:

On July 17, 1982, the Comoission issued Operating License NPF-14 (five percent power) for the Susquehanna Unit l.

On November 12. 1982, the license was amend-ed to authorize full power (100Ã) operation.

As required by 10 CFR 170.21, an operating license fee of $1,024,500 was paid for the issuance of the operating license.

In accordance with Footnote 3 of Section 170.21, the costs incurred in the processing and issuance of the Susquehanna operating license have been reviewed and they substantially exceed the maximum fee of $1,024,500 prescribed by the Comission's regulations.

Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for Susquehanna Unit 1.

Sincerely, P13ginal Sign0Q h'g>

iWm,.G. 3filler William 0. Hiller. Chief License Fee Management Branch Office of Administration DISTRIBUTION:

Docket File (w/cy of PDR LPDR Manpower File CJHolloway, LFMB

RMDiggs, LFMB
JDWeiss, LFMB LFMB R/F 8307190440 830708 PDR ADOCK 05000387 PDR memo to files with backup info.)~

LFMB:

DM CJ oway

/

/83 LFMB:

JDWei f

2/ +g /83 ORRICC~

SURMAMS~

NRC FORM 318 (10.80) NRCM 0240 LFMB'ADM WOMiller

/

/83 OFFICIAL RECORD COPY

I h

ga h

C t

~is