1 JUN 2 9 1983 Docket Nos. 50-387/388 Mr. Norman H. Curtis Vice President Engineering 5 Construction - Nuclear Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Curtis:

Subject:

Susquehanna Unit 2 Design Reviews DISTRIBUTION:

'Document. Control

(.50-387)

NRC PDR L

PDR NSIC PRC LB82 Rdg.

EHylton RLPerch

MCutchin, OELD ACRS (16)
ELJordan, DE(A: IE
JMTaylor, DRP:IE Region I, RA RH Vol lmer DGEisenhut RStarostecki, R-I In,a '-1'etter dated March 16, 1983, PPSL provided the NRC staff with a summary of recent audits and reviews conducted on Susquehanna Unit 2 activities as a

means to confirm Unit 2 design adequacy.

In addition, PPSL:provided in a letter dated April 7, 1983 a copy of the self-initiated evaluation of the Susquehanna Unit 2 construction project utilizing the INPO Performance Objectives and Criteria for Project Evaluations dated September 1982.

The NRC staff has reviewed these documents and determined that a separate independent design verification program (IDVP) is not required on-Unit 2 since the design process of Unit 2 is essentially the same as that applied to Unit 1 and incorporates improvements made as a result of lessons learned on the Unit 1

IDVP.

cc:

See next page Sincerely,

'5~+~~ 'sou<

SggagOW b~

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation 8307i80008 83062191 PDR ADOCK 05000387 P

PDR DL:LB82 PM OFFICEI SURNAME$

DATE0 RLPerch:kw 6/2> /83

~ ~ ~

~ ~

~ ~

~

~ ~ 0 ~ ~ 0 ~

DL.

/BC ASch encer aug(as TM vak

~ ~ 01 ~

~

~ 0 ~

~ ~ ~ ~ 0 ~

~

~

RH

~ ~ ~ J ~ I I

~

~ll

~ ~ ~ ~ ~ 0 ~

~

~

~

83 DL.

Dt'nhut

/83

~ ~ ~ ~

~

~

~

I

-" '/or-

/at/83 I ~ ~ ~ ~

I

~ ~ ~

~

0 ~ ~ ~i~

~ ~ ~ ~ 0 ~

NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 199 I~5-960

al 1

,f r

I S

i,.

Su sou ~ha nrem'a' l~r. Norman M. Curtis Vice President Engineering and Construction P ennsy1 vani a Power 5 Light Company Allentown, Pennsyl vani a 18101 ccs:

Jay Silberg, Esquire

Shaw, P ittman, P otts E Trowbri dge 1800 M Street, N. M.

V,ashington, D. C. 20036 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power 5 Light Company 2 North Hinth Street Allentown, Pennsylvania 18101 Mr. Rilliam E. Barberich Huclear Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentowq,Pennsyl vani a 18101 Ms. Colleen Marsh P. 0. Box 538A, RD >4 Mountain Top, Pennsylvania 18707 Mr. Thomas J. Halligan Correspondent The Citizens Against Huclear Dangers P. 0. Box 5

Scranton, Pennsylvania 18501 Mr. J. M. Mi1 1 ard Project Manager Mail Code 395 General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. G.

Rhodes Resident !nspector P. 0. Box 52

-'"Shickshinny, Pennsylvania 18655 Gerald R. Schultz, Esquire Susquehanna Environmental Advocates P. 0. Box 1560 Rilkes-Barre, Pennsylvania 18703 Robert V. Adler, Esquire Office of Attorney General 505 Executive House P. 0. Box 2357 Harri sburg, Pennsyl vani a 17120 Mr. E. B. Poser Project Engineer Bechtel Power Corporation P. 0.'Box 3965 San Francisco, California 94119 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Huclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisburg, Pennsylvania 17120