ML17139B270

From kanterella
Jump to navigation Jump to search
Forwards Dynamic Qualification Summary Package & GE Final Test Rept, NEDC-22177.GE Rept Withheld (Ref 10CFR2.790)
ML17139B270
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/28/1982
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17139B271 List:
References
PLA-1459, NUDOCS 8301110479
Download: ML17139B270 (4)


Text

REGULATORY 'RMATION DISTRIBUTION SYS 'j (RIDS)

ACCESS+4+PBR ~ 8301110479 DOC ~ DATE: 82/12/28 NOTARIZED: NO DOCKET

.,FACIL:5'-387 Susquehanna BYNAME Steam Electric 'Stationq Unit 1< Pennsylva 05000387 AUTH AUTHOR AFFILIATION CURTIS' ~ W>> ,Pennsylvania Power 8 Light Co,

">REC IP>> NAME RECIPIENI'FFILIATION SCHKENCERi">> Licensing Branch '2

SUBJECT:

Forwards dynamic qualificat.ion summa y,package 8i"GE Final Test Rept~," NEDC"25177 AGE rept withheld(ref 10CFR2 ~ 790) ~

DISTRIBUTI N CODE: PB01S COPIES RECEIVED:LTR .g, ENCL.> SIZE>>.

TITLE: Proprietary Review Distribution - Pre OL NOTES:

RECIPIENT . COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRA LB2 BC PERCHER>> ~~ 1 1

0 1

NRR LB2 LA 1 0 INTERNAL; ELD M 1 "0 NRR DIR 1 0 EG F ILE RGN1 1 1 K/

. EXTERNAL; ACRS 06 10 LPDR '2 0 NRC PDR 1 0 NTIS 1 0

.TOTAL NUMBER OF 'COPIES REQUIRED ~ LTTR 22 ENCL 13

4 4

O'5 WV f g r~ I if r k I >I W W>F, (,

I (>

>j 1

~

I> ' f'I >( e %tl 4 Ij II

~ g t >I l I tf 1

~

(1 ~r Wc ~

>>e e oem t >>ew>> ~ 1 f gt Pgl <<) jj Ilj )7 'j

>JP) >~>f I I I j>

I II t Ij $ I>it jj jj,I'

~ Jt> gati Ij f ',jf jj'l Xh I

> Vtt

Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101 ~ 215 i 7705151 Norman W. Curtis Vice President-Engineering & Construction-Nuclear 21 5 / 770-5381 DEC 88 198K

,Mr. A. Schwencez, Chief~

Licensing Branch No. 2 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ll IP SUSQUEHANNA STEAM ELECTRIC STATION SEISMIC QUALIFICATION OF MSIV ACTUATOR LICENSE CONDITION 2.C.(23)(C)

ER 100450 FILE 841-2 PLA-1459 Docket No. 50-387

Dear Mr. Schwencer:

License Condition 2.C.(23)(C) requires submittal of a completed final qualification report for main steam isolation valve actuators (HV-1F022A through D and HV-1F028A through D). The attached Dynamic Qualification Summary Package (including SQRT forms) and GE Final Test Report NEDC-22177 provide the required documentation. Pursuant to 10CFR2.790, GE Final Test Report NEDC-22177 contains proprietary information and should be withheld from public disclosure.

This completes our actions in response to License Condition 2.C.(23)(c).

N. W. Curtis p8ol Vice President-Engineering & Construction-Nuclear Attachments 8

cc: R. Perch NRC w/a A. Lee - NRC w/o 82i228 830lii0479 05000387 PDR ADOCK PDR P

0 0 t

~'