ML17139B049

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 1 to License NPF-14
ML17139B049
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 09/03/1982
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17139B050 List:
References
NUDOCS 8209280113
Download: ML17139B049 (4)


Text

UNITED STATES NUCLEAR REGULATORY CO"IMMISSION DOCKET HO. 50-387 PENNSYLVANIA POHER 5 LIGHT COl'IPANY ALLEGHENY ELECTRIC COOPERATIVE, INC.

NOTICE OF ISSUANCE OF AMENDMENT OF FACILITY OPERATING LICEHSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment Ho.

1 to Facility Operating License No. NPF-14, issued to Pennsylvania Povier 5 Light Company and Allegheny Electric Cooperative, Inc., for Susquehanna Steam Electric Station, Unit 1 (the facility) located in Luzerne County, Pennsylvania.

This amendment grants changes to Technical Specifications to delete observation v>e11 Number 2 from ultimate heat sink surveillance requirements, to correct a typographical error in the lo~ pressure alarm setpoint for the condensate transfer

pump, and to correct values on standby gas treatment flow rates provided for surveillance purposes and to clarify the volumes associated ivith the same surveillance test.

This amendment is effective as of the date of issuance.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations.

The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment Was not required since the amendment does not involve a significant hazards consideration.

(

8209280ii3 820903 PDR ADQCK 05000387 P

PDR OFFICE/

SURNAMEIj'ATE NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-338-960

4 a

l

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For futher details with respect, to this action, see (1) the application for the amendment dated August 18, 1982; August 23, 1982; September 1, 1982; and September 2, 1982; (2) Amendment No.

1 to License NPF-14 dated September 3,

1982; and (3) the Commission's evaluation dated September 3, 1982.

All of these items are available for public inspection at the Coaeission's Public Document

Room, 1717 H Street, N. 1)., washington, D. C. 20555, and at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Hilkes-Barre, Pennsylvania 18701.

A copy of items (1), (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, t1aryland, this 3rd day of September 1982.

fOR THE NUCLEAR REGULATORY COHHISSION

'Original Signod Byt

%057 Or h. Kintnor.

L. L. Kintner, Acting Branch Chief Licensing Branch No.

1 Division of Licensing OFFICEI SURNAME/

DATE$

DL:LB&'2

~ ~ ~ ~ ~ ~ ~ 0 ~I~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

RPerc h/1 q

~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~ I ~ ~

9/3/82 NRC FORM 318 (10-80) NRCM 0240 D

~

HRu rook

~ ~ ~ ~ ~ 0Y

~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~

9/

/82

~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

i'ELD HCutchs

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

9/Q /82 4K DL:LB81 I ~ I ~ ~ ~ ~ 0

~ ~ ~ ~ ~ ~ ~ ~ ~

~

BJYoun gb oo 9

8 OFFIClAL RECORD COPY

~

~

~

~ ~ ~ ~ 0

~ 4

~,

USGPO: 1981~960

C 4

b H

0