ML17139A375
| ML17139A375 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/16/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17139A376 | List: |
| References | |
| NUDOCS 8108030126 | |
| Download: ML17139A375 (4) | |
See also: IR 05000387/1981010
Text
p
r""'~>speoo
4
A
I
nO
0>
r+
O~
Cy
+a*++
Docket No. 50-387
t
UNITED STATES
t
NUCLEAR REGULATORY COMMISS1ON
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA19406
NIL 16
198t
Power 5 Light Company
ATTN:
Mr. Norman
W. Curtis
Vice President
Engineering
and Construction
Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
IE FlLC COPV
Gentlemen:
Subject:
Inspection
No. 50-387/81-10
This refers to the routine inspection
conducted
by Mr. G.
Rhoads of this
office on May 4-June
5,
1981 of activities authorized
by
NRC License
No.
CPPR-101 at Susquehanna
Steam Electric Station,
Unit 1,
Salem Township,
and to the discussions
of our findings held by Mr. Rhoads with
Mr. H.W. Keiser at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement
Inspection
Report which is enclosed with this letter.
Within these
areas,
the inspection
consisted
of selective
examinations of
procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted
in full compliance with NRC requirements,
as set forth in
the Notice of Violation, enclosed
herewith as Appendix A.
This item of
noncompliance
has
been categorized
into the levels described
in the Federal
Register Notice (45 FR 66754) dated
October
7,
1980.
You are required to
respond to this letter and in preparing your response,
you should rollow
the instructions
in Appendix A.
In addition,
one activity appears
to be
a deviation from FSAR commitmen
s
as set forth in Appendix B.
Your response
to this deviation
should include
the elements
required for your response
to Appendix A.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosed
inspection
report, will be placed in the NRC's
Public Document
Room.
If this report contains
any information that you (or
your contractors)
believe to be exempt
from disclosure
under
it is necessary
that you (a) notify this office by telephone within ten
(10) days
from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days
from the date of this letter
ili
E=
8108030126
5000/@7
S 107 16
pDR
ADDER 0
pDR
8
f)
II
Power
and Light Company
2
a written application to this office to withhold sue) information.
Consistent
with section 2.790(b)(1),
any 'such application
must be accompanied
by an
affidavit executed
by the owner of the information which identifies the
document or part sought to be withheld,
and which contains
a full statement
of the reasons
on the basis
which it is claimed that the information should
be withheld from public disclosure.
This section further requires
the
statement
to address
with specificity the considerations
listed in
The information sought to be withheld shall
be incorporated
's
far as possible
into a separate
part of the affidavit. If we do not
hear
from you in this regard within the specified periods
noted above,
the
report will be placed in the Public Document
Room.
The telephone notification
of your intent to request withholding, or any request for an extension of
the
10 day period which you believe necessary,
should
be
made to the Supervisor,
Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
R.
R.
Kei 'g,
Chi
Projects
Branch 82, Division of
Resident
and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Office of Inspection
and Enforcement Inspection
Report
Number 50-387/81-10
cc w/encls:
A.
R. Sabol,
Manager,
Nuclear guality Assurance
W.
E. Barberich,
Licensing Engineer
H.
W. Keiser, Superintendent
of Plant
I
0