Forwards IE Insp Rept 50-387/81-10 on 810504-0605 & Notices of Violation & Deviation
ML17139A375
Person / Time
Site: Susquehanna 
Issue date: 07/16/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139A376 List:
References
NUDOCS 8108030126
Download: ML17139A375 (4)


See also: IR 05000387/1981010

Text

p

r""'~>speoo

4

A

I

nO

0>

r+

O~

Cy

+a*++

Docket No. 50-387

t

UNITED STATES

t

NUCLEAR REGULATORY COMMISS1ON

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA19406

NIL 16

198t

Pennsylvania

Power 5 Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

IE FlLC COPV

Gentlemen:

Subject:

Inspection

No. 50-387/81-10

This refers to the routine inspection

conducted

by Mr. G.

Rhoads of this

office on May 4-June

5,

1981 of activities authorized

by

NRC License

No.

CPPR-101 at Susquehanna

Steam Electric Station,

Unit 1,

Salem Township,

Pennsylvania

and to the discussions

of our findings held by Mr. Rhoads with

Mr. H.W. Keiser at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement

Inspection

Report which is enclosed with this letter.

Within these

areas,

the inspection

consisted

of selective

examinations of

procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your activities

was not conducted

in full compliance with NRC requirements,

as set forth in

the Notice of Violation, enclosed

herewith as Appendix A.

This item of

noncompliance

has

been categorized

into the levels described

in the Federal

Register Notice (45 FR 66754) dated

October

7,

1980.

You are required to

respond to this letter and in preparing your response,

you should rollow

the instructions

in Appendix A.

In addition,

one activity appears

to be

a deviation from FSAR commitmen

s

as set forth in Appendix B.

Your response

to this deviation

should include

the elements

required for your response

to Appendix A.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection

report, will be placed in the NRC's

Public Document

Room.

If this report contains

any information that you (or

your contractors)

believe to be exempt

from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within ten

(10) days

from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days

from the date of this letter

ili

E=

8108030126

5000/@7

S 107 16

pDR

ADDER 0

pDR

8

f)

II

Pennsylvania

Power

and Light Company

2

a written application to this office to withhold sue) information.

Consistent

with section 2.790(b)(1),

any 'such application

must be accompanied

by an

affidavit executed

by the owner of the information which identifies the

document or part sought to be withheld,

and which contains

a full statement

of the reasons

on the basis

which it is claimed that the information should

be withheld from public disclosure.

This section further requires

the

statement

to address

with specificity the considerations

listed in

10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorporated

's

far as possible

into a separate

part of the affidavit. If we do not

hear

from you in this regard within the specified periods

noted above,

the

report will be placed in the Public Document

Room.

The telephone notification

of your intent to request withholding, or any request for an extension of

the

10 day period which you believe necessary,

should

be

made to the Supervisor,

Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

R.

R.

Kei 'g,

Chi

Projects

Branch 82, Division of

Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Office of Inspection

and Enforcement Inspection

Report

Number 50-387/81-10

cc w/encls:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W.

E. Barberich,

Licensing Engineer

H.

W. Keiser, Superintendent

of Plant

I