Forwards Results of Independent Teardown Analysis/Insp of Nine Samples of Cable.W/O Encl
ML17138B717
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/11/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8101140824
Download: ML17138B717 (3)


Text

~S ASCII~

Vp

+

0 A.

ClO ttl el o~

++*++

Docket Nos. 50-387 50-388 NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE

'ING OF PRUSSIA, PENNSYLVANIA19406 iIEC > -'8o0

~~~g+AA'5 c yrt

.J Se 1

~

~ ~

Pennsylvania Power 8 Light Company ATTN:

Mr. Norman M. Curtis Vice President Engineering and Construction Nuclear 2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

Subject:

Independent Teardown Analysis/Inspection of Cable The Nuclear Regulatory Commission (NRC) has initiated a program of independent verification tests and inspection to increase the confidence in our established inspection program.

As part of this program, nine samples of cable obtained from the Susquehanna Steam Electric Station (SSES) were subjected to a teardown analysis/inspection by an independent laboratory under contract to the NRC.

The results of the independent teardown analysis/inspection are documented in report F-C5260-3-1, a copy of which is enclosed.

The report identified four (4) areas of concern which must be resolved between members of your staff and the Region I staff:

1.

Configuration of the cable as compared against IPCEA-S-19-81.

2.

Insulation thickness of one sample.

3.

Pinhole in the 'jacket of one cable.

4.

Spectroscopic analysis of insulation.

These at eas of concern will be discussed with your staff during future inspections of SSES.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

a copy of this letter will be placed in the NRC's Public Document Room.

If you have any questions regarding the referenced report we will be pleased to discuss them with you.

Your cooperation with us is appreciated.

S 1ncere1y, Robert T. Garison, Chief Reactor Construction and Engineering Support Branch

Pennsylvania Power II Light Company cc w/o encl A. R. Sabol,

Manager, Nuclear guality Assurance H.

E. Barberich, Licensing Engineer H.

M. Keiser, Superintendent of Plant

t '%

~