ML17138B611
| ML17138B611 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/12/1980 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML17138B608 | List: |
| References | |
| 50-387-80-21, 50-388-80-14, NUDOCS 8012080370 | |
| Download: ML17138B611 (1) | |
Text
'APPENDIX A'
'OTICE 'OF 'IOL'ATION Docket No. 50-388 10 CFR 50, Appendix B, Criterion V, states in part, "Activities affecting quality...shall be accomplished'in'-accordance.
with (these) instructions.,
procedures, or drawings."
The Susquehanna PSAR, Appendix D, Paragraph 3.3.3; states. in part, "General procedures for carrying out.'..construction are contained -in...Bechtel general and technical engineering.
standard ds..."
Bechtel Melding Standard, HFNC-1, Paragraph 6.9 states in par-t, "Individual welders shall'eep their work areas clear of unauthorized or. discarded fi,lier material."
Contrary to the above, on August 19 and 20,
- 1980, unauthorized welding filler materials, specifically. 12 unused rods of ER-308L, and 6 rods of E-70S-2, were found at elevation 645'nd 779..'n the Unit No.
2 reactor building.
I
-This item is a deficiency.
Pennsylvania Power and Light Company This refers to the inspection conducted by a.representative of the Region I (Philadelphia) office, at the Susquehanna Steam. Electric Station, Unit 1, Berwick, Pennsylvania, of activities author ized by NRC License No.
CPPR-102.
During this inspection, conducted on August. 19-22, 1980, the following apparent item of noncompliance was identified: