ML17138B597

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions
ML17138B597
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/14/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8012040031
Download: ML17138B597 (2)


Text

~ i

~a AtOIJ (4

4 0

4p P

Cl IVl O

Cy 0

~

UNITEO STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 NOV 1 4 jg@)

Docket Nos.

50-387 50-388 Pennsylvania Power and Light Company ATTN:

Hr; Norman W. Curtis Vice President Engineering and Construction " Nuclear

~

2 North Ninth Street Allentown, Pennsyl vania

18101, Gentlemen:

t~ C i~1 CD Cn fT)

Cll en~9 Pi Mrs>

MC2 rn-4A~

CA

~%I CV C7 The enclosed IE,Bulletin 80-23, '"Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation" is forwarded to you for action.

No written response is required.

In order to assist the NRC'n evaluating the'alue/impact of each Bulletin on licensees, it would be helpful if you wou'Id provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin.

Please estimate separately the manpower associated with corrective actions following identification of problems through the Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, Boy e H. Grier Director

Enclosures:

1.

IE Bulletin No. 80-23 2.

List of Recently Issued IE Bulletins CQNTACT:

D.

L. Caphton (215-337-5266) cc w/encls:

A.

R. Sabol,

Manager, Nuclear guality Assurance W.

E. Barberich, Licensing Engineer M.

W. Keiser, Superintendent of Plant

1 P

s e e

~-

J, 4 ~

C 0

'C C-a CP 4-1