'Docket Nos.
50-387 50-388 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 ll06 23 1933 Pennsylvania Power and Light Company ATTN:
Mr. Norman W. Curtis Vice President Engineering and Construction - Nuclear 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Gentlemen:
This refer s to the meeting held at the NRC Region I office on July 30, l980, at the request of the Pennsylvania Power and Light Company.
This meeting which related to activities authorized by NRC License Nos.
CPPR-l01 and CPPR-l02, was attended by Mr.
N.
W. Curtis of PP8L and Mr.'. T. Carlson of Region I.
The subjects discussed at this meeting are included in the Office of Inspection and Enforcement Meeting Summary which is enclosed with this letter.
It is our opinion that this meeting was beneficial and improved our understand-ing of your operations and your understanding of, our inspection program and objectives.
In accordance with Section 2.790.of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed meeting summary will be placed in the NRC's Public Document Room.
No reply to this letter is required;
- however, should you hive any questions concerning this meeting, we shall be pleased "to discuss them with you.
Sincerely,
Enclosure:
As Stated Robert T. Garison, Chief Reactor Construction and Engineering Support Branch cc w/encl:
A.
R. Sabol,
- Manager, Nuclear guality Assurance W.
E. Barberich, Licensing Engineer S.
H. Cantone, Superintendent of Plant ao>oooo Cps
ENCLOSURE License Nos.
CPPR-101 and 102 Docket Nos.
50-387 and 388 Licensee:
Pennsylvania Power and Light Company Facility:
Susquehanna Steam:Electric Station,. Units 1 and 2
A:
Persons Attendin N.
W. Curtis, Vice President Engineering and Construction - Nuclear, PPSL R.
T. Garison, Chief, Reactor Construction and Engineering Support Branch, NRC-Region I B.
Sub ects Discussed 1.'larification of the basis for NRC s concern regarding the effective-ness of PP&L's quality assurance program (see letter, Garison to Curtis, dated July 21, 1980 forwarding Report of.. Combined Inspection 50-387/80-06;.50-. 388/80-04).
2.
The accelerating pace of construction and preparation test work, and the need for added emphasis and continued vigilance in areas of equality Assurance/equality Control.
3.
Procedure matter pertaining to review and approval'of correspondence between PPSL and the NRC.