ML17138B455

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-387/80-15 & 50-388/80-10 on 800623-27.No Noncompliance Noted
ML17138B455
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/21/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B456 List:
References
NUDOCS 8009100889
Download: ML17138B455 (2)


See also: IR 05000387/1980015

Text

gP,~ RECIJ,

Mp,0

Cy

c

nO

0

++**+

Docket Nos.,50-387

50"388

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA19406

.Jill 2i RII

Pennsylvania

Power

8 Light Company

ATT'N:

Mr. Norman

W. Curtis

Vice President

'ngineering

and Construction

Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Combined Inspection

Nos.

50-387/80-15

and 50-388/80-10

This refers to the routine inspection

conducted

by Mr. J.

P. Durr of this office

on June 23-27,

1980, at the Susquehanna

Steam Electric Station, Unit Nos.

1 and

2, Berwick, Pennsylvania

and Allentown, Pennsylvania of activities authorized

by

NRC License

Nos.

CPPR-101

and

CPPR-102

and to the discussions'of

our findings

held by Mr. J.

P.

Durr with Mr. T.

R.

Clymer at the conclusion of the inspection.-

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement Inspection

Report which is enclosed with this letter.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

measurements

made

by the

inspector,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal, Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC s Public Document

Room.

If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from publ'ic disclosure.

Any such

application must be accompanied

by an affidavit executed

by the owner of the

information, which identifies the document

or part sought to be withheld,

and

which contains

a statement of reasons

which addresses

with specificity the items

which will be considered

by the Commission

as listed in subparagraph

(b) (4) of

Section 2.790.

The information sought to be withheld shall

be incorporated

as

far as possible into a separate

part of the affidavit. If we do not hear from

you in this regard within the specified period,

the report will be placed in the

Public Document

Room.

,00NlP'

Pennsylvania

Power

8 Light Company

~

~

~

~

~

~

~

~

No reply to this letter is required;

however,

should you have any questions

concerning this inspection,

we will be pleased to discuss

them with you.

Sincerely,

Enclosure:

Office of Inspection

and Enforcement

Inspection Report Nos. 50-387/80-15

and 50-388/80-10

o er

.

arlson,

hief

Reactor

Construction

and Engineering

, Support Branch

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

M.

E. Barberich,

Licensing Engineer

S.

H. Cantone,

Superintendent

of Plant