Ack Receipt of 800711 Interim Deficiency Rept Re Agastat & GE Timing Relays
ML17138B436
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/28/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8008180200
Download: ML17138B436 (4)


Text

~g Racy 0

C

++*++

Docket Nos.

50-387 50-388 t

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 l

ram@

Pennsylvania Power 8 Light Company ATTN:

Mr. Norman W. Curtis Vice President Engineering and Construction - Nuclear 2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

Subject:

Interim Report of a Deficiency on Agastat and General Electric Timing Relays CDR 80-00-08 (Your letter of July ll, 1980 PLA-508)

Thank you for your letter, referenced

above, which forwarded an interim report pursuant to 10 CFR 50.55(e) regarding the subject matter.

Your report will be reviewed and evaluated, and should we require additional information concerning this matter, we,will contact you.

Your cooperation with us is appreciated.

Sincerely, R.

T. Car son, Chief Reactor Construction and Engineering Support Branch CC:

A.

R. Sabol,

Manager, Nuclear guality Assurance W.

E. Barberich, Licensing Engineer S.

H. Cantone, Superintendent of Plant

TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONEr (215) 821 5151 NORMAN W. CURTIS Vice Presirtent-Engineering 8 Construction-Nuclear 821-538 I July ll, 1980 Mr. Boyce H. Grier Director, Region I U.

S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY ON AGASTAT AND GENERAL ELECTRIC TIMING RELAYS ERs 100450/100508 FILE 840-4/900-10 PLA-508

Dear Mr. Grier:

This letter serves to confirm information provided by telephone to NRC Inspector Mr. R. Gallo by Mr. A. R.

Sabol of PP&L on April 28, 1980.

During that conversation, Mr. Gallo was advised that the subject condition was under evaluation for x'eportability under the provisions of 10CFR50.55(e),

The deficiency involves premature time out and drifting set points for penumatic time delay relays.

PP&L and Bechtel are studying the deficiencies associated with both Agastat 7000 series and General Electric CR 2820 relays.

These relays ax'e used in safety related systems and hence their improper operation could affect the safe operation of the nuclear power plant.

Therefore, the deficiency has been determined to be rep'ortable under the provisions of 10CFR50.55(e).

Bechtel and PP&L are in the process of analyzing the safety impact of the deficiency and are formulating a corrective action plan.

Bechtel has issued MCAR 1-54 to document the deficiency and effect correction.

Since the details of this report provide information relevant to the reporting requirements of 10CFR21, this correspondence is considered to also discharge any foxmal responsibility PP&L may have for reporting in compliance thereto.

We will advise the Commission of a date by which a final report will be made available.

PENNSYLVANIA POWER 6, LIGHT COMPANY

Mr. Boyce H. Crier

\\

July 11, 1980 Very truly yours, N. W. Curtis Vice President En-gineering

& Ccnstructicn-Nuclear FLW/ARS:mcb cc:

Mr. Victor Stello (15)

Director-Office of Tnspection

& Enforcement U.. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. G. McDonald, Director Office of Management Xnformation

& Program Control U.

S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.. 0. Box 52 Shickshinny, Pennsylvania 18655

~ '

1