ML17138B433

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Requests Info Re Estimate of Manpower Associated W/Corrective Actions Needed After Identifying Problem
ML17138B433
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/31/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 8008140500
Download: ML17138B433 (1)


Text

Docket Nos.

50-387 50"388 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 July 31, 1980 Pennsylvania Power and Light Company ATTN:

Mr. Norman W. Curtis Vice President Engineering"and Construction - Nuclear 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Gentlemen:

Enclosed is IE Bulletin No. 80-20 which requires action by you with respect to your nuclear power facility(ies).

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review. and preparation of the report(s) required by the Bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.

Should you have any questions regarding the Bulletin or actions required by you, please contact this office.

Sincer ely, B y e H. Grier Director

Enclosures:

l.

IE Bulletin No. 80-20 with Enclosure 2.

List of Recently Issued IE Bulletins CONTACT:

E.

G.

Greenman (215-337-5267) cc w/encls:

A.

R. Sabol,

Manager, Nuclear guality Assurance W.

E. Barberich, Licensing Engineer S.

H. Cantone, Superintendent of Plant