ML17138B315

From kanterella
Jump to navigation Jump to search
Ack Receipt of Forwarding Interim Deficiency Rept Re Pacific Valve,Inc Check Valves.Rept Is Being Evaluated Pending Final Rept
ML17138B315
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/28/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B316 List:
References
NUDOCS 8005220189
Download: ML17138B315 (1)


Text

Caq5 i e%"Vo'p8 REqy~

+4 po Cy 0O Op Vp gO

+a**+

Docket Nos.

50-387 50-388 UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 pe 23 LN Pennsylvania Power 5, Light Company ATTN:

Mr. Norman W. Curtis Vice President Engineering and Construction (N-4) 2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

Subject:

Interim Report of a Deficiency on Pacific Valve Inc. Check Valves (Your letter of March 31, 1980)

Thank you for your letter, referenced

above, which forwarded an interim report pursuant to 10 CFR 50.55(e) regarding the subject matter.

Your interim report is being reviewed and evaluated.

This matter will remain open pending your final report.

Your cooperation with us is appreciated.

Sincerely, Robert T. Garison, Chief Reactor Construction and Engineering Support Branch CC:

A. R. Sabol,

Manager, Nuclear guality Assurance W. E. Barberich, Licensing Engineer S.

H. Cantone, Superintendent of Plant 8005 god yogi