Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-387/79-30
ML17138B032
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/19/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B033 List:
References
NUDOCS 8001240075
Download: ML17138B032 (2)


See also: IR 05000387/1979030

Text

~~~(~p8 Argy

"o

Cy

A,

~+~ '0

+>>*<<~

cket No. 50-387

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA19406

DEt,'8 1979

Pennsylvania

Power

8 Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

(N-4)

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

50-387/79-30

This refers to your letter dated

November 27, 1979, in response

to our letter

dated

October- 12,

1979.

This also refers to the October 24,

1979 meeting

between

NRC and

PPSL,

and Inspection Report No. 50-387/79-37

which documents

the results of that meeting.

The subject of a satisfactory ultrasonic examination for inservice inspection

of the double-weld joint with overlapping welds attaching the recirculation

riser pipes to the ring header

sweepolets

was discussed

at the October 24,

1979

meeting referenced

in your letter.

NRC positions with respect to this issue

were presented

at that meeting

and are listed in Section

4 of Inspection

Report

No. 50-387/79-37

issued

on November 19, 1979.

The inspection finding in -this

area will remain

open until the actions

contained in these positions

are

satisfactorily accomplished.

Your cooperation with us is appreciated.

Sincerely,

Robert T. Carlson,

Chief

Reactor Construction

and

Engineering

Support

Branch

CC:

A. R. Sabol,

Manager,

Nuclear guality Assurance

W. E. Barberich,

Licensing Engineer

R.

W. Dunn, Superintendent

of Plant

a'