Docket No. 50-387
50-388
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA19406
OCl'i 2
1979
Power
8 Light Company
ATTN:
Hr. Norman
W. Curtis
Vice President
Engineering
and Construction
(N-4)
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Inspection
Nos. 50-387/79-25;
50-388/79-13
This refers to the inspection
conducted
by Dr.
M. Shanbaky of this office on
August 6-8,
1979, at the Susquehanna
Steam Electric Station,
Units
1 and 2,
Berwick, Pennsylvania,
of activities authorized
by
NRC License
Nos.
CPPR-101
and
CPPR-102
and to the discussions
of our findings held by Dr. Shanbaky with
t1essrs.
Featenby,
Mood and Basta of your staff at the conclusion of the inspec-
tion, and to a subsequent
telephone
discussion
between
Dr. R. Bores of this
office and Hr.
R.
Wood on September
17.
1979.
Areas
examined during this inspection are described
in the Office of Inspection
and Enforcement
Inspection
Report which is enclosed with this letter.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the
inspector.
Our inspector also verified the steps
you have taken to correct the item of
noncompliance
and deviation brought to your attention in a letter dated
Nay 2,
1978.
We have
no further questions
regarding the steps
you took to correct
the specific item of noncompliance
and deviation identified in that letter,
however, it appears
that
a related
item of noncompliance
and deviation recurred
during this inspection.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted
in full compliance with
NRC requirements,
as set forth in
the Notice of Violation, enclosed
herewith
as Appendix A.
This item of noncom-
pliance
has
been categorized
into the levels
as described in our correspondence
to you dated
December
31,
1974.
This notice is sent to you pursuant to the
provisions of Section
2.201 of the
NRC's "Rules of Practice,"
Part 2, Title
10,
Code of Federal
Regulations .
Section
2.201
requires
you to submit to this
office, within twenty (20) days of your receipt of this notice,
a written
statement
or explanation in reply including:
(1) corrective steps
which have
been
taken
by you and the results
achieved;
(2) corrective steps
which will be
taken to avoid further items of noncompliance;
and (3) the date
when full com-
pliance will be achieved.
V4
0
0,
Power. 5 Light Company
2
Another activity appears
to be
a deviation from commitments
made in Section
4.1 of the Environmental
Report and from acceptable
industry practice.
Specifi-
cally, the uncontrolled release of effluents from the concrete. batch plant,
as
observed
on August 6,
7 and 8,
1979 resulted. in erosion/sedimentation
at wooded
areas
.
With respect
to this Deviation, which is discussed
in more detail in
the attached
Inspection Report,
please
provide your comments
to- this office in
writing within 20 days,
regarding
the control of effluents
from the concrete
batch plant.
We note that this event is similar to the Deviation described
in Inspection
Report 50-387/78-04
and 50-388/78-04.
The Item shown in the Notice of Violation enclosed with this letter, is a recur-
rent or uncorrected
item.
In your response
please
give this matter your parti-
cular attention.
In accordance
with Section
2.790 of the
NRC's "Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and the enclo-
sures will be placed in the
NRC's Public Document
Room. If this report con-
tains
any information that you (or your contractor)
believe to be proprietary,
it is necessary
that you make
a
wr itten application within 20 days to this
office to withhold such information from public disclosure.
Any such applica-
tion must
be accompanied
by an affidavit executed
by the owner of the informa-
tion, which identifies the document or part sought to be withheld, and which
contains
a statement of reasons
which addresses
with specificity the items
which will be considered
by the Commission
as listed in subparagraph
(b) (4)
of Section 2.790.
The information sought to be withheld shall
be incorporated
as far as possible into a separate
par t of the affidavit. If we do not hear
from you in this regard within the specified period,
the report-will be placed
in the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Geo
'ge
. Smith, Chief
Fu
Facility and Naterials Safety
B anch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Office of Inspection
and Enforcement Inspection
Report Nos.
50-387/79-,25
and 50-388/79-13.'
Power
8 Light Company
3
cc w/encl:
~
~
~
~
A. R. Sabol,
Manager,
Nuclear guality Assurance
H.
E. Barberich,
Licensing Engineer
R. ll. Dunn, Superintendent
of Plant