~Cr pe RECCO'o
0
O
~O
+**++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
691 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
JAN 08 gyp
Docket No. 50-387
Power
& Light Company
ATTN:
Mr. Norman
W. Curtis
Vice President
Engineering
and Construction
(N-4)
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Inspection
50-387/78-22
This refers to the inspection. conducted
by Mr.
G. Walton of this office
on December
12-14,
1978, at Susquehanna
Steam Electric Station, Unit 1,
Berwick, Pennsylvania,
of activities authorized
by
NRC License
No.
CPPR-
101,
and to the discussions
of our findings held by Mr. Walton with Mr.
Green of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of
Inspection
and Enforcement Inspection
Report which is enclosed with this
letter.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews'with
personnel,
and observations
by the inspector..
Within the scope of this inspection,
no items of noncompliance
were
observed.
In accordance
with Section
2.790 of the
NRC's "Rules of Practice,"
Part
2, Title 10,
Code of Federal
Regulations,
a copy of this letter'and
the
enclosed
inspection report will be placed in the
NRC's
Public'Document'oom.
If this report contains
any information that you (or your con-
tractor) believe'to
be proprietary, it is necessary
that you make
a
written application within 20 days to this office to withhold such
information from public disclosure.
Any such application must
be ac-
companied
by an affidavit executed
by the owner of the information,
which identifies the document or'part sought to be withheld,
and which
Power and
Light Company
contains
a statement of reasons
which addresses
with specificity the
items which will be considered
by the Coomission
as listed in subpara-
graph (b) (4) of Section 2.790.
The information sought to be withheld
shall
be incorporated
as far as possible into a separate
part of the
affidavit. If we do not hear from you in this regard within the speci-
fied period-, the report will be placed in the Public Document
Room.
No reply to this letter is required;
however,
should you have"any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Robert T. Garison, Chief
Reactor Construction
and Engineering
Support
Branch
~
~
Enclosure:
Office of Inspection
and Enforcement Inspection
Report
Number 50-387/78-22
cc w/encl:
A. R. Sabol,
Nanager,
Nuclear guality Assurance
M. E. Barberich, Licensing Engineer