ML17132A087
| ML17132A087 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 05/11/2017 |
| From: | Technical Specifications Task Force |
| To: | Office of Nuclear Reactor Regulation |
| Honcharik M, NRR/DSS/STSB 415-1774 | |
| Shared Package | |
| ML17132A096 | List: |
| References | |
| Download: ML17132A087 (1) | |
Text
Traveler Status Purpose Priority TSTF-566, "Revise Actions for Inoperable RHR-SDC Subsystems" (3Q2017)
OG review complete.
Revising to address comments.
Address two URIs and delta between TS and BWR design.
M Westinghouse Hot Channel Factor Traveler based on Topical Report WCAP-17661 (3Q2017)
Final SE received.
Discuss need for traveler with NRC.
Addresses nonconservative TS.
M Revise NUREG-1431 &
NUREG-1432 Definition of Response Time Testing (3Q2017)
Scoping meeting with NRC held in January 2016.
Supports PWROG project on obsolete components H
TSTF-564, "Safety Limit Minimum Critical Power Ratio (SL MCPR)" (3Q2017)
Presubmittal meeting held November 2016.
NRC questions being addressed.
Eliminate need for cycle-specific, short-turnaround LARs.
H NEI TR on spent fuel pool neutron adsorber and conforming changes (4Q2017)
The final SE on the NEI topical report has been received.
Provide a model program for plants revising their spent fuel pool requirements.
L TSTF-568, "Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2" (4Q2017)
Preparing traveler draft for BWROG review.
NRC request to clarify the Applicability.
L TSTF-505 Companion Traveler to Address Loss-of-Function (4Q2017)
On hold until after near-term issues resolved NRC will not allow loss-of-function RICTs without changes.
H