ML17125A049

From kanterella
Jump to navigation Jump to search
March 8, 2017, Generic Fundamentals Examination Results for J.A. Fitzpatrick Nuclear Power Plant (Cover Letter)
ML17125A049
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/03/2017
From: Diane Jackson
Operations Branch I
To: Reno M
Exelon Generation Co
Bixler C
Shared Package
ML17095A458 List:
References
Download: ML17125A049 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 3, 2017 Mr. Michael Reno Manager, Training Exelon Generation Company, LLC James A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093

SUBJECT:

MARCH 8, 2017, GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)

Dear Mr. Reno:

On March 8, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to two employees at your facility and one passed. A passing grade is 80 percent or better. Enclosed with this letter is a copy of the BWR examination, including answer key, the grading results for your facility, and copies of the individual answer sheets for of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.

The NRC will also update its GFE website, https://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations/past-exams.html after administration of the second subsequent GFE. This current GFE exam should be posted shortly after March 2018. If you have any questions concerning the examination, please contact me at 610-337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 Enclosures (Non-Public):

1. March 8, 2017, NRC GFE Grade Report for J. A. FitzPatrick
2. Individual NRC Examination Answer Sheets
3. NRC Response to Facility Comments
4. BWR Examination Form A and B with answers cc w/o enclosures: Distribution via ListServ

Document date: May 3, 2017

SUBJECT:

MARCH 8, 2017, GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC) cc w/o enclosures: Distribution via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2017\FP03-08-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML17095A458 ADAMS NO.: ML17125A049 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler DEJackson DATE 05/01/17 05/03/17 OFFICIAL RECORD COPY