ML17125A033

From kanterella
Jump to navigation Jump to search
March 8, 2017, Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter)
ML17125A033
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/04/2017
From: Diane Jackson
Operations Branch I
To: Stafford J
Dominion Nuclear Connecticut
Bixler C
Shared Package
ML17095A458 List:
References
Download: ML17125A033 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 4, 2017 Mr. Jeffrey T. Stafford Manager, Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Power Station, Units 2 & 3 P. O. Box 128 Waterford, CT 06385

SUBJECT:

MARCH 8, 2017, GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR MILLSTONE POWER STATION, UNIT NO. 2 (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)

Dear Mr. Stafford:

On March 8, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to twelve employees at your facility and they passed. A passing grade is 80 percent or better. Enclosed with this letter is a copy of the PWR examination, including answer key, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.

The NRC will also update its GFE Web Page, https://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations/past-exams.html after administration of the second subsequent GFE. This current GFE exam should be posted shortly after March 2018. If you have any questions concerning the examination, please contact me at 610-337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-336 Enclosures (Non-Public):

1. March 8, 2017, NRC GFE Grade Report for Millstone Power Station Unit 2
2. Individual NRC Examination Answer Sheets
3. NRC Response to Facility Comments
4. PWR Examination Form A and B with answers cc w/o enclosures: Distribution via ListServ

Document date: May 4, 2017

SUBJECT:

MARCH 8, 2017, GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR MILLSTONE POWER STATION, UNIT NO. 2 (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC) cc w/o enclosures: Distribution via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2017\MS2-03-08GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML17095A458 ADAMS NO.: ML17125A033 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler DEJackson DATE 04/12/17 05/04/17 OFFICIAL RECORD COPY