D01-S08 - Austgen, NEI, Regulatory Review Process Options-Industry Progress, Initiatives, and Concerns, NRC-DOE Arw, 170425
ML17100A424
Person / Time
Site: Nuclear Energy Institute
Issue date: 04/25/2017
From: Austgen K
Nuclear Energy Institute
To:
Office of New Reactors
Devaser N, NRO/DSRA/ARPB, 301-415-5196
Shared Package
ML17093A569 List:
References
Download: ML17100A424 (10)


Text

Regulatory Review Process Options:

Industry Progress, Initiatives & Concerns Kati Austgen Sr. Project Manager, New Plant Licensing NRC-DOE Workshop on Advanced Reactors April 25, 2017

  • North Bethesda, MD 1

2 Long-Term Vision for New Plant Commercialization Americas nuclear power plants are operating at world-class levels of safety and reliability and by the 2030s are supplying an increasing amount of carbon-free energy for electricity and industrial uses. American industry maintains a leadership role in the development, demonstration and operation of both light-water and non-light water nuclear technologies for energy production and U.S. reactor designs are recognized as the most innovative available.

Source: NEI Strategic Plan for Advanced Non-Light Water Reactors 3

NEI Strategic Plan for Advanced Non-Light Water Reactors: Strategic Goals

1. Two or more advanced non-light water reactor designs are commercially available (ready to build) in the U.S. in the 2030-2035 timeframe.
2. Demonstrations of one or more advanced non-light water reactors occur in the U.S. by 2025.
3. A licensing framework exists to facilitate the efficient and predictable deployment of advanced technologies, provides continued international credibility to U.S. designs, and encourages continued private-sector investment.

4

5 Staged Approvals Modernized Performance-Based Regulatory Framework Risk-Informed Technology Inclusive

NEI Advanced Reactor Activities

  • Non-LWR guidance and design criteria
  • Standard Design Approval - major portions guidance
  • Licensing Technical Requirements Modernization Project
  • Regulatory Engagement Planning guidance
  • Codes & Standards coordination
  • Standard Review Plan for Research & Test Reactors (NUREG-1537)
  • Update NRC criteria for research reactor (examine 1MW liquid fuel limit)
  • Issues specific to uranium enrichments between 5% and 20%

6

Licensing Technical Requirements Modernization Project

  • Technology-inclusive, Risk-informed, Performance-based
  • Propose systematic process for Licensing Basis Event Selection
  • Propose an approach to ensuring PRA technical adequacy (Fit for Purpose) at each stage of design and licensing

- Provide roadmap for integrating and maturing the PRA and using as additional input to design as the design matures 7

Regulatory Engagement Planning Guidance

  • Pre-application thru chosen regulatory Plan outcome(s)
  • Users guide reference to current guidance Adjust Implement
  • Examples of successful approaches/techniques Check
  • Menu-style 8

NEI Coordination with GAIN TWGs

  • High Temperature Gas Reactor TWG

- Functional containment performance requirements and criteria

- TRISO fuel qualification

  • Molten Salt Reactor TWG

- Standard Review Plan for Research & Test Reactors (NUREG-1537)

- Update NRC criteria for research reactor (examine 1MW liquid fuel limit)

  • Fast Reactor TWG

- Issues specific to uranium enrichments between 5% and 20%

- Modeling & simulation tool use 9