ML17083B706

From kanterella
Jump to navigation Jump to search
Comments on Facility License Condition Requiring Seismic Reevaluation.Nrc Will Propose That Licensee Undertake Program of Deterministic Seismological & Geological Studies to Follow Probabilistic & Deterministic Assessments
ML17083B706
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/17/1984
From: Zerbe J
NRC OFFICE OF POLICY EVALUATIONS (OPE)
To: Asselstine, Palladino, Roberts
NRC COMMISSION (OCM)
Shared Package
ML16341D628 List:
References
NUDOCS 8603050506
Download: ML17083B706 (10)


Text

yah htgy, a

(i Vp

+*eei UNITEDSTATES NUCLEAR REGULATORY COMMlSSlON NIASHINGTON,O. C. 20555 cOB July 17.

1984 Enclosure 2

MEMORANDUM FOR:

Chairman Pal 1 adino CoIInIissioner Roberts CoIIIIissioner Asselstine Co 'i er Bernthal FROM:

SUBJECT:

n E.

e, erector Office o olicy Evaluation COMMENTS ON DIABLO CANYON LICENSE CONDITION REQUIRING SEISMIC REEVALUATION On March 27 the Comission approved a low-power license for Diablo Canyon that included the following license condition:

"PGEE shall develop and implement a state-of-the-art program to revalidate the seismic design bases used for Diablo Canyon.

PGEE shall submit-for NRC staff review and approval the proposed program plan and proposed schedule for implementation by January 30, 1985.

The program shall be compIeted and final report submitted to the NRC by July 1, 1988."

The Comission indicated that at the time of full-power licensing it would consider supplementing this condition with regard to the details of the program envisaged by the staff, and by separate request asked for ACRS views.,

on the staff's plan.

By the Secretary's memorandum of April 13, 1984, Comissioner Bernthal requested that OPE comment on the Diablo Canyon "seismic revie~ license condition... and the appropriateness of the utility taking the lead in this

- project."

In the light of developments since the low-power license (with the seismic condition) was approved, we offer for your consideration the following comments.

Contact:

Cookie Ong, OPE Al Kenneke, OPE X<<43302 8603050506 860225 PDR ADOCN, 05000275 P

'DRl"!

1

~

V 0

~

+e

~

P

~

The Coamission

'2 License Condition We would expect that, during the course of the normal, interactive staff review of PGKE's proposed program, the staff will assure that the independent program of geologic and seismic studies by NRC and its consultants (including USGS) will be complementary with PGKE's.

We note that provision is being made for periodic exchanges of information between the programs, and we expect the staff 'will keep the Comaission informed on progress.

We note that the scope of the reevaluation effort will take into account soil-structure interactions in the Diablo Canyon plants as actually constructed.

However, the seismic license condition should not suggest ruling out in advance the continued use of information and techniques unique to Diablo Canyon (e.g., "tau effect"); all available information should be taken into account, not just the latest information. The NRC staff should judge what is acceptable, including use of advanced methods and new information available and appropriate for Diablo Canyon.

We understand that the staff will propose that the licensee undertake a

- program of deterministic seismological and geological studies, to be followed by both probabilistic and deterministic assessments of the geoseismic findings on the plants as designed and built.

The planned approach seems to us to be generally consistent with Comnission policy on the proper role of probabilistic analyses.

However, any use of PRA should be consistent with.

the uncertainties and other limitations associated with the PRA state of the art, and there should be an appropriate mix of PRA and deterministic approaches.

PGEE should be assured a definite and sufficient amount of time (e.g., thee years) to carry out a.staff-approved program.

Account should be taken of the time interval between licensee submittal and staff approval; 1988 should be

'nly the nominal target.

Utilit and Staff Roles

.On June 14, 1984, the staff briefed the ACRS on the detailed license conditions that staff will recommend the Commission approve in making a

full-power licensing decision.

In its June 20, 1984 letter to the Coamission, the ACRS stated:

The NRC staff has proposed to undertake an independent evaluation in parallel with the PGKE efforts.

In this program, technical assistance work and limited independent analysis would be utilized's needed for the NRC staff's review of the PGKE work....

We believe that it is appropriate for PGKE to take the lead in the seismic reevaluation and that the NRC staff's independent evaluation can provide adequate review of the PGKE work.

We recommend that the NRC effort include a signifi-cant support role for the VSGS in this regard.

~ a I

The Comnission t

Ckith respect to the question of the "utilitytaking the lead,"

we believe

.consideration of such an approach should take into account fairness to the utility and public credibility of the program results particularly the scope and'quality of the reev'aluation.

The licensee has carried the burden at great expense oyer a long period, getting a

CP on one set of geoseismic "facts" and an'OL on a new set (the Hosgri).

In the face of the errors of construction, the licensee was able for the third time to demonstrate to the staff, the ACRS, several Boards and the Comnission itself that the plants are seismically adequate.

Even though siting and operating a nuclear power plant in coastal California require continuous attention to new knowledge about tectonics and earthquakes, it would, nevertheless, seem appropriate that NRC share in this burden, in light of the fact that NRC is imposing a

reevaluation program.

v Furthermore, in view of the uncertainties in the seismic data and techniques used for Diablo Canyon, and the considerable engineering judgment involved, we believe it w'ould. be inappropriate for the licensee to "take the lead" in revalidating key aspects of the seismic design, basis, e.g., the character of the Hosgri, the SSE magnitude and the maximum vibratory ground motion, if the words "take the lead" were read as implying a passive, if not weak, staff role.

In the Diablo Canyon seismic proceeding the positions of the staff and, particularly, its advisors and consultant were the primary determinants of these key seismic design parameters.

Thus, we believe that the staff should continue to play an active and strong role with respect to these

'aspects of the reevaluation effort. If the results indicate a significant increase in the Diablo Canyon seismic loads, then it would be appropriate for the licensee to take on the major burden in providing further proof that the as-built plants are seismically adequate.

In the earth science

area, data gathering, particularly on the site itself, has been primarily the function of the utility.

Mith respect to analysis and interp'retation of the data, the staff takes a more active, if not lead, role.

Having the staff continue to play a strong role may encourage the utility to

. go beyond what it might otherwise be sa'tisfied with.

Correspondingly, the staff's own program will benefit from the results that evolve from the utility's program.

Thus, it would seem to us that having two strong, independent, but coordinated.

programs would more likely lead to a sound, documented and publicly credible result than the practice of utility submittal and staff evaluation of that submittal alone.

Even though acquisition of proprietary data (such as the oil exploration data analyzed by Crouch) necessary to resolve the seismic question might alone cost hundreds of thousands of dollars, thus far the utility has. indicated its willingness to undertake the seismic reevaluation program.

Indeed, it seems evident that the utility'wishes to maintain some kind of key, if not lead, role in the program.

Shifting the burden to the staff does not seem warranted; for example, completely independent staff efforts to the extent of

The Comaission including standard engineering tests, such as extensive trenching and boring, could. result in unnecessary government costs and not utilize the knowledge and skills the utility could bring to bear on the problem.

Yhus, forcing a lead role on the staff in 'this area may not be the best solution.

The objective ought to be the best decision'hat can be reached under the circumstances, one that permits the utility and staff programs to be both independent

.and interactive.

Tn determining the staff's role in the reevaluation effort, staff resources are a major factor.

NRC's ongoing geology and seismology research programs are necessary. to provide a long-term data base for NRR operating reactor licensing decisions, but adequate technical assistance resources are necessary for real-time NRR decisionmaking.

A strong role should not be seen as "make-work" for the staff; the resources would be only those necessary to maintain the staff's competence to make independent and authoritative decisions on key matters affecting its safety judgments.

Noreover, as in =

other NRR area's of responsibility we are clearly moving from an era of operating license decisions to one primarily concerned with safety oversight of operating reactors.

Also, as'he need for a mechanism to deal more systematically with new information is not unique to Diablo Canyon, the approach used in Diablo Canyon can help find a better way to deal with the generic problem.

Me understand that the'staff will reallocate resources to carry out what it now sees as its own seismic reevaluation program for Diablo Canyon seismic revalidation.

On the face of it, the figure of about

$150,000 which we understand the staff is considering in FY-85 for this program (including funds for USGS) appears to us to be on the low side of what might be needed to. support a staff role sufficient to assure the staff's reevaluation effort is adequately independent.

The Comnission should assure that staff resources are sufficient to meet 'the needs of a strong staff role in reevaluating

'iablo Canyon seismic adequacy.

The Comnission may wish to ask the staff what more the staff might consider desirable to do, were higher resource levels available.

.cc:

S. Chilk H. Plaine M. Dircks H. Denton

l

)<r Me Cev ~ex N~<tcer Power Pleat -UL,ifL Enclosure 3

8Pecc.I

~5 L cetic 5 P P - g0 NOvc~ker 2, l'tlat 2.C. (7)

Seismic Desi n Bases Reevaluation Pro ran (SSER 27 Section IY.5)

PG&E shall develop and implement a program to reevaluate the seismic design bases used for the Diablo Canyon Nuclear Power Plant.

The. program shall include the following Elements:

(1)

PG&E shall identify, examine, and evaluate all relevant geologic and seismic data, informat'ion, and interpretations that have become available since the 1979 ASLB hearing in order to update the geology, seismology and tectonics in the region of the Diablo Canyon Nuclear Power. Plant.

If needed to define the earthquake potential of the region as it affects the Diablo Canyon Plant, PG&E will also reevaluate the earlier information and acquire additional new data.

~e (2)

PG&E shall reevaluate the magnitude of the earthquake used to determine the seismic basis of the Diablo Canyon Nuclear Plant using the information from Element l.

(3)

PG&E shall reevaluate the ground motion at the site based on the results obtained from Element 2 with full consideration of site and other relevant effects.

(4)

PG&E shall assess the significance of conclusions drawn from the seismic reevaluation studies in Elements 1,

2 and 3, utilizing a probabi listic risk analysis and deterministic studies, as necessary, to assure adequacy of seismic margins.

PG&E shall submit for NRC staff review and approval a proposed program plan and proposed schedule for implementation by January 30, 1985.

The program shall be completed and a final report submitted to the NRC three years following the approval of the program by the NRC sthff.

PG&E shall keep the staff informed on the progress of the reevaluation program as necessary, bA as a minimum will submit quarterly progress reports and arrange for semi-annual meetings with the staff.

P$ &E wi 11 also keep the ACRS informed on the progress of the reevafuation program as'necessary, but not less frequently than once a year.