ML17083B188

From kanterella
Jump to navigation Jump to search
Forwards Diablo Canyon Nuclear Power Plant Independent Design Verification Program, Semimonthly Rept for Jul 1983
ML17083B188
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/22/1983
From: Cooper W
TELEDYNE ENGINEERING SERVICES
To: Harold Denton, Maneatis G, Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340D616 List:
References
5511-444, NUDOCS 8307260539
Download: ML17083B188 (4)


Text

REGULATORIPORMAT ION DISTRIBUTION S'EM (RIBS)

ACROSS DSN 5Blf',5307260539 DOC ~ DATE: 83/07/22 NOTARIZED; NO DOCKET ¹ FACIL:50 275 Diablo Canyon Nuclear Power Planti Uni,t lE Pacific Ga OS000275 AUTH~ AAtlE AUTHOR AFFILIATION COOPERiN E ~

Teledyne Engineering Services EU>PCE RECIP ~ NAME RECIPIENT AFFILIATION

. DENTONrH>>RE Office of Nuclear Reactor Regulationi Director MARTINrJ ~ B ~

Regiori Sr Office of 'Director MANEATISiGBA>>

Pacific Gas 8'lectric Co.

SUBJECT:

Forwands "Diablo >Canyon Nuclear Power Plant Independent Design Verificatio~.Program,,"

semimonthly rept for Jul 1983 ~

DISTRIBUTION CODE:

DGISS iCOPIES RECEIVED:LTR. L ENCL i

SIZE:.L TITLE: Diablo Canyon (50>>275)

Independent Design Verificatiori Progiam

NOTES:J Hanchett icy,PDR Documents, 05000275 RECIPIENT Io CODE/NAME NRA f.B3 BC'UCKL'EfrB ~

06 INTERNALS ELD/HDS2 EPOEPER/EeB 11 WRH SCBIERLING HRA/OE/KGB 13 NAB/DE/ME&

15 NAR/OE/SCAB NRA D

ICSB FI 00 M/'DDAlG/MIB COPIES t.TTR ENCL 0'

1 0

i 1

1 2

i 1

1 1

0 RECIPIENT ID CODE/NAME NRR L,B3 LA IE/DEPER DIR IE/DQASIP DER NAR/DE/DEB 12 NRR/DE/GB i4 NRR/DE/GAB i6 BIRR/DSI/ASB 18 NRR/DS I/PS 8 SIGNS 08 COPIES LTTR ENCL 1

1 1

1 ii i

1 1

i i

1 1

2 EXTERNAL: ACRS ABC PDR NTIS NOT~ES:

19 03 io 16 1

1 1

1 1

1 L,PDR NSIC 03 OS 2

?

1

'TOTAL NUMBER OF COPIES REQUIRED>>

L'TTR 04 ENCL 41

I

~r f Pi r v II, P

II II I

~

I ~

) 'l t

'I f

'li

. ~

~

~

o h

i f

,i ilP H

I r

II fr VP>>

II ll II IP g y ly f

~ $

il

Mr. G. A. Maneatis, Executive Vice-President

,Pacific Gas and Electric Co.

77 Beale Street San Francisco, California 94106 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 Mr. J.

B. Martin, Regional Administrator Region V

U. S. Nuclear Regulatory Conmission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Re:

Docket No. 50-275 Diablo Canyon Unit 1 License No.

DPR-76 A 'ILEDYNE ENGINEERING'ERVICES 130 SECOND AVENUE WA(.THAM,MASSACHUSETTS 02254 (6171 8904350 TWX (710) 324.7580 July 22, 1983 5511-444

Subject:

DCNPP Independent Design Verification

Program, Semimonthly Status Report for July 1983 Gent 1 em en:

Enclosed is our semimonthly status report as Program Manager for the DCNPP Independent Design Verification Program.

Very truly yours, TELEDYNE ENGINEERING SERVICES William E. Cooper Project Manager WEC:cjr Enclosure cc:

H. E. Schierling (NRC)(3)

R.

R. Fray (PGandE)

E. Denison (RLCA)

R. F.

Reedy (RFR)

F. Sestak (SWEC)

M. J.

Strumwasser, Esq.

D. F. Fleischaker, Esq.

J. Reynolds, Esq./J.

R. Phillips, Esq.

B. Norton, Esq.

A. C. Gehr, Esq.

R. B. Hubbard J. Roesset ENGINEERS AND METALLURGISTS PDR. AD~~~ oooo 0

)

~f II