Responds to to President Cater Re Potential Radiological Risks at Facility.Nrc Has re-examined Plant for Conformance to Fuel Loading & Low Power Testing Requirements
ML17083A579
Person / Time
Site: Diablo Canyon  
Issue date: 09/09/1980
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Schaffer M
AFFILIATION NOT ASSIGNED
References
NUDOCS 8009180248
Download: ML17083A579 (12)


Text

0 1980 Ns. Nary Jane Schaffer 766 Broad San Luis Obispo, California 93401

Dear Ns. Schaffer:

Your April 22, 1980 letter to President Carter regarding the Diablo Canyon nuclear plant has been referred to me for reply.

Your letter expresses a concern over the potential radiological risks of the Diablo Canyon facility.

Except for matters arising from lessons learned from the Three Nile Island Unit 2 accident, the NRC had previously evaluated plant design with respect to radiological risks associated with potential accidents at the Diablo Canyon facility.

This evaluation is contained in our October 1974 Safety Evaluation and nine supplements, No. 9 having been published 'in tune 1979.

Let me assure you that, the NRC has reacted positively to improve the safety of all nuclear power plants in operation and under construction based on the lessons learned from the Three Nile Island accident.

Based on the findings of the President's Cooeission on the accident (the Kemeny Commission), the recommendations of the Special Inquiry Group directed by Mitchell Rogovin, recommendations developed by internal NRC special task forces, and recommendations from other sources including the Advisory Committee on Reactor Safeguards, a comprehensive NRC Action Plan Developed as a result of the TNI-2 accident, NUREG-0660, was prepared and published in Nay 1980.

Consistent with Commission guidance.

the NRC staff is requiring all applicants for new operating licenses to modify the designand operation of their nuclear plants to conform to TNI-related requirements.

NUREG-0694, published June 1980, identifies these requirements and provides a

schedule by which they must be implemented.

Me have re-examined the Diablo Canyon facility for conformance to the NUREG-0694 requirements as they apply to fuel loading and low power testing and on August 6, 1980, issued our Safety Evaluation on these matters.

Before the NRC staff can issue a license to load fuel 'and conduct low power (below GA) tests, all of these requirements must be met, the Atomic Safety and Licensing Board for Diablo Canyon must rule favorably, and the NRC Commission itself will review the record.

80 0918 0 848 OFFICE $

SURNAME DATE)

NRC FORM 318 {9.76) NRCM 0240 OU.S. GOVERNMENT PRINTING OFFICE: 1979 289 369

E V

( 4l 4

fyu$i)',) ).

vis. Nary Jane Schaffer 2

SEI' 1980 A copy of all of the above cited documents can be found in the Local Public Document Room (LPDR) maintained for Diablo Canyon.

This LGDR is located at the California Polytechnic State University Library, Documents and

>1aps Department, San Luis Obispo, California 93407.

Based on the above, I believe your concerns for radiological safety are being adequately addressed.

Sincerely.

A. Schwencer, Acting Chief Licensing Branch ¹3 Division of Licensing DISTRIBUTION Docket 50-275/323)

NRC PDR Local POR BBuckley ASchwencer J.Lee (w/incoming)

DGEisenhut RAPurple HRDenton EGCase PFine BSnyder BGrimes RVollmer DRoss SHanauer FSchroeder RTedesco HBerkow/WRussell SCavanaugh(NRR-4082)

EHughes NFudge OELD LWB Ee4g 4N ~1'~

Jg 8go v+

./iM//I~

'~/I 8foug~/

bcc:

TERA NSIC OFFICE)

SURNAME QATE)

DL:LB¹2 ASchw nc r 8/g+80 DL:LB¹3&N+

BBuckley siiso""

8/P/80 NRC FORM 318 (9.76) NRCM 0240 4V,S. GOVERNMENT PRINTING OFFICE: 1979 289 369

I

~9 <<-.4" ".n~i 1

lP b

FROMs Nary Jane Schaffer DATE OF DOCUMENT 4/22/80 LTRs MEMO'ATE RECEIVED 6/4/80 REPORT(

NRR-4082 OTHER:

Tos ORIG.:

Ccs OTHER:

President Carter CLASSIF,:

POST OFFICE RED. No.s ACTION NECESSARY

~

CONCURRENCE D

DATE ANSWEREOs NO ACTION NECESSARY Q

COMM(EN'T 0

evs 6/18/80 F ILE COOEs OESCRIPTIONs (Muss eu Unclssu(ssd)

REFERRED TO DATE RECE(VEO 8Y DATE DIABL9 CANYON NUCLEAR POWER PLANT Eisenhut ENCLOSVRESs cc:

Denton Case Snyder Grimes Vollmer" Hanauer PIeasse p1ace NNroff on distribution for any reply.

Also return original yellow, control ticket to LQ'taroff (I(hen action completed,.

U. S. NUCLEAR REGULATORY COMMISSION MAILCONTROL FORM FORM NRC 3363 (4 79 I

J

~

W aoldodka>elk no 'ilozONl sosfq eaaeXS Icni~t:~o mu4e~ oaf'YLqow yes aoX QJ6%

tlO'lQf~v~ 04 JSihI J fQ'1JAG> 'A'Cr TXOQ a&DP9$ gtdOO AG ZDOQ

FROM)

Harp Dane Schaffer OATE OF OOCULIENT LTRI MEMO,"

GATE RECEIV REPORT)

NO.'THERs TO>

ORIOA CC'THER, President Carter CLASSIF:.

POST OFFICE REG.NO ACTIONNECESSARY CONCURRENCE Q

GATE ANSWEREO'O ACTIONHECESSARY Q

COMh'IENT Bv' 18 80 FILE CODE

~

OESCRIPTIONI IMusten Unslsssss>ed)

OIABt.EF" CANYOii BUCLFAR PNJER PLNlT REFERREO TO GATE RECEIVEO BY OATE

~/

ENCLOSURES)

Case Snider

-Vo'fli~cr REMARKS'.

Hanauer s

) ':/"I

/. )

! czssf V<S. NUCLE'AR REGULATORY COMMISSION MAILCONTROL FORM FORM NRO326S I4 TS)

N II 4*'

r

THE WHITE HOUSE WASHINGTON MEMORANDUM:

The attached letter(s) addressed to the President is referred to your office for suitable acknowledgment or other..appropriate handling at the earliest opportunity.

Should you receive mail that has been misdirected, please forward to the appropriate agency.

I would also appreciate knowing when you are forwarding such mail.

My phone number is 456-2717.

Thank you.

ry Martha Seal Director Correspondence Agency Liaison

1

0 I

gg,, l K

$4q'fk.F~

6'~~Mh~ rngArn i+~. F'~ dya&' P~ hays k~

"~c ~ Wen+4~lga 847~,44 @44 ~0M~~

~

a ~ gl.f

I lg I

'i f.

4 If h

I h

h I

I\\

h II h

h

'I I

I I

I f