Responds to 800207 Mailgram to President Carter Re Validity of Rumor Concerning 800531 Issuance of OL to Facility.Nrc Has No Knowledge of Rumor & No Such Decision Has Been Made. NRC Is Preparing Action Plan to Complete Licensing Reviews
ML17083A301
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/17/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Ashworth M
AFFILIATION NOT ASSIGNED
References
NUDOCS 8004020250
Download: ML17083A301 (22)


Text

- i,j.,',j jj/Ijjjj"j'I,'jjjj'jjI,ju sstjjjjRa

/Dcokut Pi'le R.

C. D<<oung pjll(j;,l)ji jjUjljjsjj j3<+ 'IRc PDR'. J. Mattson Local PDR D. Eisenhut NSIC D. F.

Ross TIC D. B. Vassallo TERA.

S.

A. Varga EDO Reading J.

F. Stolz NRR Reading B.

C. Buckley Ms. Myra Ashworth LHR ¹1 File E.

G. Hylton 113 Del Sur tlag H.

R. Denton G. Ertter (08397)

San Luis Obispo, California 93401 E

H.

N. Berkow E.

Hughes

Dear Ms. Ashworth:

H. Russell R.

Lazo IE (3)

I am pleased to respond to your mailgram to the President which was referred to me for reply.

You inquired as to the validity of a rumor you heard that an operating license would be issued for the Diablo Canyon Nuclear Power Plant on May 31, 1980.

~ gqs I trust that the above information adequately addresses your concern.

Sincer ely,

\\

  • See previous yellow for previous concurrences Original Simted bg HA. Oc<>tan g'arold R. Dentori', Director sIp l'l Office of Nuclear Reactor Regulation DCR EGCase 8004030 3-5'e DP1 'D DPM:9 DBVassa lo 03 ~

80 DF o 80 03 80 03 Me have no knowledge of this rumor and assure you that-no such decision has been made.

In order to complete our licensing review of nuclear power plants such as Diablo Canyon, the Nuclear Regulatory Commission staff is preparing an Action Plan that wil'I identify actions considered necessary for individual plants as a result of the accident at Three Mile Island.

The staff plans to submit the Action Plan to the Commission for review and approval in the very near future; when approved the requirements will be forwarded to the affected utilities.

The Action Plan will include, among other requirements, the detailed criteria for implementing the recommendations of the Kemeny Commission and the corresponding implementation deadlines.

The NRC staff believes these actions are in accordance with the President's response (dated December 7, 1979) to the Kemeny Commission Report on the Three Mile Island accident.

The President requested both the nuclear industry and the Nuclear Regulatory Commission to comply with the spirit and intent of the Kemeny Commission recommendations.

In the case of Diablo Canyon, the presiding Atomic Safety and Licensing Board may require further public hearings on contentions related to the Action Plan requirements.

In addition, the pro-ceeding is still before the Atomic Safety and Licensing Appeal Board as to seismic and security issues and as indicated in the Policy Statement on the TMI-2 accident issued by the Commission on October 4, 1979, no new licenses for nuclear power reactors will be authorized by Atomic Safety and Licensing Boards or issued by the NRC staff, except after subsequent order of the Coomission itself.

OFFICE SURNAME DATEP DPM:L

¹1 Ejg: pcm 03/i R /80 DPM:

1 BCBu.

ley 03/ i,j/ /80 DP '¹l JFSt

'3/

/80 DPM:LLJR:AD

  • SAVarga 02/ 22 / 80 OELD DDayis 03/ 10 /80 NRR HR0 on.....

03/ C

/80 NRC FORM 318 (9-76) NRCM 0240

'kU.S. GOVERNMENT PRINTING OFFICE: 1979 289Q69

QA )

] I l

!'c

Distribution:

Docket. File R.

CD oung NRC PDR R. Mattson Local PDR D. Eisenh C

NSIC D.

Ross TIC D.

Va allo TERA S.

V. rga EDO Reading J. Stolz NRR Reading

. Buck1ey Ms.

Maya shworth LHR dl Pile E. Hylton 113 Del Su May H.

R.

Denton G. Ertter (08397)

San Luis Obi po, California 93401 E

G Case M

Groff H.

N. Bergow E.

Hughes Dear Ms. Ashwo h:

H.

Russe 0

R. Lazo IE (3).

I am pleased to re pond to your mailgram t the President which was referred to me for reply.

Yoginquired as to the lidity of a rumor you heard that an operating license 0 uld be issued for he Diablo Canyon Nuclear Power Plant on May 31, 1980.

l<e have no knowledge of thi rumor an assure you that no such decision has been made.

In order to comple e our icensing review of nuclear power plants such as Diablo Canyon, the Nucle gulatory Commission staff is preparing an Action Plan that will identify tions considered necessary for individual plants as a result of the accident a

Three Mile Island.

The staff plans to submit the Action Plan to the Co i'ssi q for review and approval in the very near future; when approved the r quirements will be forwarded to the affected utilities.

The Action Plan wil

include, 8 ong other requirements, the detailed criteria for implementing the r commendation of the Kemeny Ceanission and the corresponding implementation d adlines.

The NRC staff believes these ctions are in accord nce with the President's response

{dated December 7, 979) to the Kemeny Co ission Report on the Three Mile Island accident.

The resident requested both

)e nuclear industry and the Nuclear Regulatory Co ission to comply uith the spirit and intent of the Kemeny Commission recorrme ations.

In the case of Diab(o Canyon, the presiding Atomic Safety and Licensi g Hearing Board may require fulther public hearings on contentions related t the Action Plan requirements.

q addition, the pro-ceeding is still before he Atomic Safety and Licensing Appeal Board.

As indicated in the Polic Statement on the TMI-2 accident issub by the Comission on October 4, 1979, n

new licenses for nuclear power reactor wil'l be authorized by Atomic Safety and icensing Boards or issued by the NRC staf except after further order of the Commission itself.

I trust that the a

ve information adequately addresses your concern.

Sincerely,

  • See previous yellow for previous concurrence Harold R. Denton, Directo Office of Nuclear Reacto OCA DPM:DD DPM: D NRR DBVassallo DFRoss EGCase 03 80

'03 80 0

80 03 Regulation

~ (,gd OFFICE)

SURNAME DATE)

DPPi:L R ¹1 DPM: 'J

.E o~n;.cm..BCBuc ]ay...

03/

Q (80

. 03/ '80 DPM.

I

'¹1 DPM:Lt(R;AD

.JFStol....,

.~MVarga 03/ $ /

02/22/BO ELD NRR

.. HRDenton.....

03/ K>

,/80 03/ '80 NRC FORM 318 {9 76)'NRCM 0240 AU.S. GOVERNMENT PRINTING OFFICEs 1979 289.369

C 1

N n

Il Q,v,

~

~

Distribution:,

Docket File IE (3)

NRC PDR R.

C.De ung Local PDR R.

Map son NSIC D. Eisenhut TIC TERA i Vassallo EDO Reading S.

Varga'-

Ms. Maya Ashworth NRR Reading J. Stolz 113 Del Sur Way LMR ¹1 Fflg B. Buckley San Luis Obispo, Calif nfa 93401 H.

R.

De@ton E. Hylton E.

G. g8se G. Ertter (08397)

Dear Ms. Ashworth:

H. N.+Berkow M. Groff tl. $6sse11 E.

Hughes I

am pleased to respond to y r maflgram t6 the President which was referred to me for reply.

You inquired s to th+validity of a rumor you heard that an operating license would be is ued f 6 the Dfab'lo Canyon Nuclear Power Plant on May 31, 1980.

R.

Lazo The NRC staff belf ves these actions are in accordanc with the President's response (dated December 7, 1979) to the Kemeny Gonads Ion Report on the Three Mile Island acc dent.

The President requested both the uclear industry and the Nuclear Re ulatory Comafssfon to comply with the spf t and intent of the Kemeny C

fssfon recommendations.

In the case of Dia lo Canyon, 44-~

P idigA i*St y dLk igH igB d

y further pu ic hearings on contentions related to the Action Plan requfrements.

In additi n, the proceeding is stf1.l before the Atomic Safety and Licensing Me have no knowledge of this rumor an assure you that no such decision has been made.

In order to completely ur 1

ensfng review of nuclear power plants such as Diablo Canyon, the Nucl ar Regul tory Commission staff is preparing an Action Plan that will iden fy actions onsidered necessary for individual plants as a result of the ac ident at Th+e Mile Island.

The staff plans 'to submit the Action Plan to $ e Commission for eview and approval fn the very near future; when approvegthe requirements~ wf 1

be forwarded to the affected utilities.

The Actfon Pgan will include, among ther requirements, the detailed criteria for implement fig the recommendatfons of e Kemeny Commission and the corresponding fmpl erne tati on deadlines.

Appeal ard~

'0 Su~&ee4skon h~~e I t ust that t e above information adequately addresses your ponce Sincerely,

,l T~P dt~

  • See previous yellow for previous concurrences DPM:DD DPM:D NRR DBVassallo DFRoss EGCase 03/

80 03 80 03 Harold R. Denton, Director Office of Nuclear Reactor ReguIation OCA 80 03 80 OFFICE $

SURNAME DATE$

,,DPM:L P $1.....

PPM;"P!R

. E an:pcm...BCBuk ey..

.O3/....../8O....O3/...A.../aO 0.

JF 03/

Ll(R.Pl

.. /80 DPM:glR'AP

...~SkV.ar.ga....

.02/22/80..

QEj.O..........

~LDDa.v.is.....

02/27/80

.. ERR...........

.. HRD.enon....

, 03/

/80 NRC FORM 318 (9-76) NRCM 0240 AU.S. GOVERNMENl PRINTING OFFICE: 1979 289 369

e 7

1

~

aL-p h il

'4 I

~l

Hrs. Clarinda Vraus FEB 14 >980 In addition to the above requirements, Commission review of the rendu. ts of other investigations, including the Presidential Colrmission and gaffe NRC's Special Inquiry Group, can be expected to lead to additional ryguirements for use in licen reviews of new plants.

We are in the ffrfa1 stages of development of an A

ion Plan for Commission review and appr'oval implementing recommendations of th President's Commission and other studies resulting from the Tf'1-2 acciden This Action Plan will includeinew or improved safety objectives, the tailed criteria for their implementation and the various implementation de dlines.

We intend to submi't a final draft of the Action Plan on February 15, 1980 to the Commission. for review and a

royal.

As indicated in the Policy S

tement on the Tt<I~2 accident issued by the Conmission on October 4, 1979, no new licenses/for nuclear power reactors will be authorized by Atomic Sa ty and Licepsing Boards or iss 8

VR xcept after further o der of the Commission itself.

In addition, until the Comm ss on as comp e

e e rey. ews necessary to ensure that operating reactors are adequately r

pond'ing to the lessons learned from the THI-2 accident, only limited resource p,',ill be available for reviews associated with issuing new operatingg censes.

I thank you for this opportunity t respon to your letter.

Since ly, I

J g

Harold R. 9 ton, Director fice of Hu ear Reactor Regulation OF F ICE Pq.ilA SURNAME/'.

OA~C Pg

.'8 -PAPH D ome> ick/L i 2/y~ /80 Llggg: BC ODParr 2/g /80 2

/80 DD: DPi4l DBVassallo 2/ I~ /80 D:

Pfl F

ss 2/g L/80 EGCase 2/

80 H.

nton 2/ i

/80

r 1

<<t I

~,~a$ P I OP 4

4%1 il V

R.

attson D. Eisenhut D.

Ross D. VAssallo S.

Varga J. Sto1p B. Buykley E. alton G./Ertter (08397)

< Groff, Hughes R.

Lazo Sincerely, t

Distribution:

Docket File NRC PDR Local PDR

,NSIC TIC TERA EDO Reading NRR Reading LWR ¹1 File Ms. Maya Ash> orth H.

R.

Denton 113 Del Sur W

E.

G.

Case San Luis Obisp, Calffornfa 93401 H.

N. Berkow W. Russell Dear Ms. Ash>>or IE (3)

R.

C.

DeYou I

am pleased to spond to your maflgram to th President which was referred to me for reply.

ou inquired as to the vali ty of a rumor you heard that an operating licens would be issued for the fablo Canyon nuclear Power Plant on May 31, 19 We have no knowledge this rumor and aq ure you that no such decision has been made.

In order t complete our li bnsing review of nuclear power plants such as Diablo Canyon, t e Nuclear Reg atory Comofssfon staff is preparing an Action Plan that >>ill dentify act ons considered necessary for individual plants as a result of the ccident a

Three Mile Island.

The staff plans to submit the Action Plan to t Commf sion for review and approval in the very near future; when approved th req irements will be forwarded to the affected utilities.

The Action Plan wi 1

nclude, among other requirements, the detailed criteria for implementing the re omoendatfons of'he Kemeny Commission and the corresponding implementation de d nes.

The NRC Staff believes these ctions re in accordance wftl~ the President's response (dated December 7.,

79) fo fge Kemeny Commission Report on the Three Mile Island accident.

The Pj esident requested both'the nuclear industry and the Nuclear Regulatory Co ission to corn y with the spirit and intent of the Kemeny Commission reco endations.

In the case of Diablo Canyon, it is likely that the presiding Atomic Safety an Licensing Hearing Board may require further public hearings n contentions relat d to the Action Plan requirements.

In addition,.the procee ing is still before thy Atomic Safety and Licensing.

Appeal Board, whose de sion must be issued pit r to any licensing action by the Commission.

Such decision is not expecte until some time in the summer of this year, at the arliest.

I trust that the ab ve information adequately addre es 'your concern.

  • See preyious yellow r previous concurreOWold R. Denton, Dfr ctor Office of Nuclear Reac r Regulation DPM:DD DPM:D NRR

, 'CA DBVassallo DFRoss EGCase 03/

/80 03/

/80 03/

/80 03/

/80 y DPM:LWR ¹1 DPM:LWR ¹1 DPM:LWR ¹1 SURNAME DATES KNlylfw;pcm...BNuckley...... DFStolz.....

03/

/80 03/

/80 '3/,

/80 DPl1:LWR:AD

~SAYaxga....

02/22/80 OEL

..~LDDav.is>...

02/27/80 ik NRR

.. HRDenton....

03/

/80 NRC FORM 318 (9 76) NRCM 0240 U.S. GOVERNMENT'RINTINGOFFICE: 1979 289 369

t.

~t lt

\\

Distribution:

NRC PDR Local PDR NSIC TIC TERA EDO Reading NRR Reading LWR ¹1 Fil H.

R.

De on E.

G.

C se H.

N Berkow W.

ssell IE 3)

R C.

DeYoung o the President which was referred validity of a rumor you heard that R. Matts n

D. Ej nhut D,

ss D

Vassallo

. Varga J. Stolz B, Buckley E, Hylton G.

Emitter (08397) l/I. Groff E.

Hughes R. Lazo Ms. Maya shworth 113 Del Su ay San Luis Obis o

California 93401 Dear Ms. Ashworth I

I am pleased to res to me for reply.

Y to your maflgram quired as to th an operating 'license wou be issued f r the Diablo Canyon Nuclear Power Plant on May 31, 1980.

lie have no know1edge of tikIs r or and assure you that no such decision has n

r/

been made.

In order to complet ur licensing review of nuclear power plants such as Diablo Canyon, the Nucle Regulatory Cooeission staff is prepari an Action Plan that will identi y actions considered necessary s

a result tI~

of the accident at Three PIIIe s'land.

The staff p'lans to submit t e,Action Pl a for review and approval n the ve near future; ~ when approved the req i ements will be forwar d to the a

ected utilities, The Action Plan will include, among other r quirements, t detailed crftqria for implementing the recotrmendatfons of th Kemeny Commissio and the corrjespondfng implementa-tion deadlines 45K dP The 0@smiasvon be levee these actions are in ac rdance wi the President's response (dated Decemb r 7, 1979) to the Kemeny C

rmission on the Three Nile Island accident.

The President requested both the uclear fndustry and the Nuclear Regulatory C mmfssfon to comply with the sp it and intent of the Kemeny Commission r commendations.

In the case of Di lo Canyon, ft is likely e

A omic Safety and Licensing Hearing B

rd may require further

@ps Islpublic hearings o ~Arly. contentions related to the Act on pl'an requirements.

I trust that th above information adequately addresses yo concern.

Sincerely,

~

, CRAM'~

Harold R. Denton, Director Office of Nuclear Reactor Reg ation DPQ:DD DBVassallo 02/

/80 DPM: D DFRoss 02/

/80 NRR EGCase 02/

cZse ~ ~

00A ~

. wfr~~ rvrm~

/80 02/

/8 DPM:

MR, ¹l.

~sareei

. PG QD:. PQ9.

6rdbTg 02/ W /80

'TrIAC FGRggi 3l6 (9.76) NRCM 6246 NRR

AD

.DP,

..PC.B....y....

OPM:

'M

¹1 JF 02/ 98T80 Va'RDenton.,

02/

/80 02vI/PQ/80 0

/80

.02/~7

/80 V.S. QOVKRNIVtKNTPRINTING OFFICFI 19X9'369 369 '

.*~ '

~ '.

"*"v

~ (

If n/,

IJ jj rt 1

4

~ C 0

~,

8 4

1 f N

~

=

s s a

I j

I t

jf 1

Ns. Na Ashworth 113 Del ur Way San Luis ispo, California 93401 Dear Ns. Ashw th:

Distribution:

Docket File NRC PDR Local PDR NSIC TIC TERA EDO Reading LWR ¹1 File H.

R.

Denton E.

G.

Case H.

N. Berko W. Russel i IE (3)

R.

DeYoung R. Mattson D. Eisenhut D.

Ross D.

Vas lo S.

V ga J

tol z

. Buckley, E. Hylton G. Ertter (08397)

N. Groff E.

Hughes R.

Lazo I am pleased to re nd to your mailgram t the President which was referred to me for reply.

You nquired as -to the alidity of a rumor you heard that an operating license wo be issued for the Diablo Canyon Nuclear Power Plant on Nay 31, 1980.

We have no knowledge of this r or a d assure you that. no such decision has been made.

In order to complete u

licensing review of nuclear power plants such as Diablo Canyon, the Nuclear egulatory Commission staff is preparing an Action Plan that will identify 1

actions considered necessary as a result of the accident at Three Nile Is nd.

The staff plans to submit the Action Plan for review and approval in he ver near future; and when approved th' requirements will be forwarded i o the af cted utilities.

The Action Plan will include, among other requirements, th detailed'criteria for implementing the recommendations of the Ke eny Commission and the 'corrresponding implementa-tion deadlines.

trust that the abov information adequately addresses our concern.

Sincerely, The Commission believes th e actions are in ac rdance with the President's response (dated December 7

1979} to the Kemeny mmission on the Three Nile Island accident.

The Pre ident requested both the nuclear industry and the Nuclear Regualtory Commi ion to comply with the sp rit and intent of the Kemeny Commission reco ndations.

In the case of D ablo Canyon, it is likely that the present Atomic Safety and Licensing Hearing oard may require further public hearings on,.pub c contentions related to the A tion Plan requirements.

I Harold R. Denton, Dir tor Office of Nuclear Reac r Regu'lation DPM:DD

'PM:D NRR DBVassallo DFRoss EGCase 02/

/80 02/

/80 02/

/80 02/

/80 OFFICE $

SURNAME DATE$

DPM:

I R ¹1 DPN EG n

BCBu k ey, 02

/80 02/~~ /80 DPN:LWR ¹1 JFStolz 02/

/80 DPN;LWR:AD 0

SAVarga 02/

/80 OP/ I6

/80 NRR HRDenton 02/

/80 NRC FORM 318 (9.76) NRCM 0240 4 U.S. GOVERNMENT PRINTING OFFICE: 1979 289.369

P1

/'

I I

C

'I

~ > 'a L(<~g

1 Distribution:

Docket File R.

C.

DeY ng NRC PDR R. Matt on Local PDR D.,Ei enhut NSIC D.

oss TIC D

Vassallo TERA

. Varga

'DO Reading J. Stolz Ms. Maya hworth NRR Readin B. Buckley 113 Del Sur y

LWR ¹1 F i e E. Hylton San Luis OblsP Callfornla NOI H.

R, 0HInton G. Erttar (08397)

Dear Ms. Ashworth:

I am pleased to respond t our mailgr' to one Presfaent which was referred to.me for reply.

You fnquf as to he validity ot a rumor you heard that

,an operating license would be sue for the Diablo Canyon Nuclear Power Plant on May 31, 1980.

IE (3)

The Commission belfev s these actions are in accordan with the President's response (dated Dece er 7, 1970) to the Kemeny Commis on on the Three Nile Island accident.

T President requested both the nucle industry and the Nuclear Regualtory ommissfon to comply with the spirit a intent of the Kemeny Commission ecommendatfons.

In the case of Diablo C

on, it is likely that the present omic Safety and Licensing Hearing Board m

require further

'public hearings o

public contentions related to the Action Pl requirements.

The Commfssion f proceeding on the Action Plan on the highest p forfty basis We have no knowledge of this ru r a d assure you that no such decision has been made.

In order to comple our c(snsfng review of nuclear power plants such as Diablo Canyon, the Nu ear Regu tory Commission staff is preparing an Action Plan that will fde ify all act ons considered necessary as a result of the accident at Three Mi e Island.

The taff plans to submit the Action Plan for review and approv in the very nea future; and when approved the requirements will be forw ded to the affecte utilities.

The Action Plan will include, among othe requirements, the det fled criteria for implementing the recommendatfons of e Kemeny Commission and he corrresponding implementa-tion deadlines.

as directed by t I trust that th e President fn order to minimize any licensing d lays.

)

above information adequately addresses your concern I)

Sincerely, Harold R. Denton, Dfrector Offfce of Nuclear Reactor Regulation OCA DPM:DD DPM:D NRR DBVassallo DFRoss 'GCase 02/

/80 02/

/80 02/

. /80 08/

/80-OFFICE SURNAME DATE$

DPM:LttlR ¹1

.. EBHyj.ton.:pcs 02/

/80

...DPh1;,LgR g

...BCB.uckley....

, 02/

/80'PH'L'Ij8..4'jI.

JF5tol z..'....

02/

/80 OPH:LHB;AD..'.

SAY.arga.....'..

02/

/80

. GELD...,........NRR....,.,

...-...;..........,.HRoeo ton...;.

02/

/80 02/

/80

'RC FORIV(318 (9.761 NRCM 0240 4 U.S.)GOVERNMENT PRINTING OFFICE: 1979.289.369

l

~ a h

H er J. Stolz B. Buckle E.

Hy],ton G.

r'tter (f08397)

M Groff

~

Hughes B. Moore RE

Lazo, ASLB IE (3)

I trust that the above fn ormatfon adequately a dresses your concern.

Sincerely, Distribution Docket File (50-275)

NRC PDR Local PDR EDO Reading NRR Reading LWR 81 File H. Denton E.

Case H. Berkow W. Russel1 Ms.

MIaya Ashworth R.

DeYoung 113 Del Sur May San Luis Obispo, Californ a 93401

Dear Ms. Ashworth:

S. Var a I am pleased to respond to you mailgram to he President which was referred to me for reply.

You inquired to the vplfdfty of a rumor you heard that an operating license would be fss ed for 4'e Diablo Canyon Nuclear Power Plant on May 31, 1980.

J Me have no knowledge of this rumor a

g assure you that no such decision has been made.

The Nuclear Regulatory oahfssfon (NRC) staff fs presently developing an action plan descrfbjng th entire NRC program regarding post Three Mile Island accident requf ements.

The plan fs proposing to implement the recommendatfons of the Keme y Report, mong other recommendatfons including the schedule for the implement tion of the bove cited recommendations.

Mhen the NRC gives final approval>do this plan, t e requirements will be transmitted to the affected utilities f P their action.

Harold R. Denton, Dire tor Office of Nuclear Reac r Regulatfo'n LWRg:

JStolz 2/

/8 OFFICE

.SURNAME DATEI LWR BBuckfey/bm 2//5,/80 AA R:DPM S

a 2/

0 DPM DPM DBVassallo.

DFRoss 2/

/80

2/

/SO NRR EC~Case 2/

/80 NRR HRDenton 2/

/80 NRC FORMH318 {9.76) NRCM 0240

~ '

U.S. GOVERNMENT PRINTING OFFICEm 1979 289 369

~,

Hf

'He

h T

VF F

4

Maya Ashworth

>>n Luis Obispo, CA TO:

The President COMPL DEADLINE ACKNOWLEDGMENT INTERIM REPLY FINALREPLY FILE LOCATION 08387 DATE OF DOCUMENT 2780 PREPARE FOR'SIGNATURE OF:

Q CHAIRMAN Q

EXECUTIVEDIRECTOR DESCRIPTION Q LETTER Q MEMO Q REPORT Q OTHER SPECIAL INSTRUCTIONS OR REMARKS-Req info re issuance of license for Diablo Canyon DOCUMENT/COPY NO NUMBER OF PAGES POSTAL REGISTRY NO CLASSIFIED DATA CLASSIFICATION CATEGORY Q

NSI QRD Q FRD ASSIGN TO:

DATE

" INFORMATIONROUTING LEGALREVIEW Q

FINAL 0

COPY ASSIGNED TO:

DATE NO LEGALOBJECTIONS NOTIFY:

Q EDO ADMIN6 COR RES BR EXT.

COMMENTS, NOTIFY:

EXT.

JCAE NOTIFICATIONRECOMMENDED:

Q YES C3 NO NR FOR (11-75 EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL DO NOT REIHOVE THIS COPY

'6+.HA9gi ASHWORTH> 0066550'6

.~113 DEL.SUR WAY

'0'Al LUIS OBISPO CA 9500 Ig (9 0

o 0

o ooooooo 01186'5S038 02/07/80 ICS IPMBNGZ CSP WSHB 8055448912 MGM TDBN SAN LUIS OBISPO CA 60 02~07 1000A EST PRESIDENT JAMES CARTER WHITE HOUSE DC 20500 DEAR MR PRESIDENT RUMOUR BEGAN CIRCULATING FRIDAY FEBRUARY 1

THAT YOU INTEND TO USK KMERGENCY POWERS TO lICENSE DIABLO CANYON NUClEAR PLANT OUR AREAS RUMOR BKGAN IN PACIFIC GAS AND ELECTRIC PERSONNEL DEPARTMENT, SAYS LICENSE GRANTED AS OF MAY 31 THIS YEAR MUCH LOCAL CONCERN AN OPPOSITION, SITUATION Ir'OLITILE PLEASE CONFIRM OR DENY ~

SINCERELY MAYA ASHWORTHg 80665589126 11!32 EST MGMCOMP MGM TO REPLY BY MAILGRAM, SEE REVERSE SIDE FOR WESTERN UNION'S TOLL - FREE PHONE NUMBERS

V h,i Wf II 1

il I

ii I

, TO REPLY BY MAILGRAM,,PfjIOt"E,LJgSTER('3 PIJIOiJi fgjkYTIl"IE, DAY< gR lUIGHT.,

FOR YOUR LOCAL NUMBER, SEE TIIE I'~II(TtF PAGES,,

OF YOUR TELEPHOI'JE DIRFCTORY OR DIAL(TOLL FREE[ 800-257-2241 (EXCEPT IM MEW JERSEY 800-632-2271)

OR DIAI. WESTER@ Unior> S lmFOMASTER SYSTEM DIRECTLY:

FROM TELEX

. 6161 FROM TWX..

910 420 1212