MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARLR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0043, Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec2021-06-0909 June 2021 Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments LR-N21-0026, Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System2021-03-17017 March 2021 Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N20-0027, Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2020-05-11011 May 2020 Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology LR-N19-0055, License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2019-10-23023 October 2019 License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer2019-07-29029 July 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements2019-07-0808 July 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-04-0808 April 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-10-27027 October 2018 Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2018-06-29029 June 2018 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules LR-N18-0038, License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time2018-06-29029 June 2018 License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time LR-N17-0144, License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-06-29029 June 2018 License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0067, Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension2018-06-14014 June 2018 Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension ML18136A8662018-05-16016 May 2018 License Amendment Request: Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators2018-02-0808 February 2018 License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators LR-N17-0135, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times2017-12-18018 December 2017 License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times LR-N17-0121, License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual2017-09-27027 September 2017 License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual LR-N17-0058, License Amendment Request to Revise the Implementation Period for License Amendment No. 2942017-03-13013 March 2017 License Amendment Request to Revise the Implementation Period for License Amendment No. 294 LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-03-0606 March 2017 License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0175, License Amendment Request - Administrative Controls2016-10-17017 October 2016 License Amendment Request - Administrative Controls LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0093, License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 2922016-05-10010 May 2016 License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 292 LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-03-0404 March 2016 Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N16-0015, Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2016-02-0303 February 2016 Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation LR-N15-0084, License Amendment Request Modifying Chilled Water System Requirements2015-09-11011 September 2015 License Amendment Request Modifying Chilled Water System Requirements LR-N15-0189, Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications2015-09-0202 September 2015 Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems 2023-09-08
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC MAR 13 2017 10 CFR 50.90 LR-N17-0058 LAR S17-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Salem Nuclear Generating Station Unit 2 Renewed Facility Operating License No. DPR- 75 NRC Docket No. 50-311
Subject:
License Amendment Request to Revise the Implementation Period for Salem Unit 2 License Amendment No. 294 In accordance with 1 0 CFR 50.90, PSEG Nuclear LLC (PSEG) hereby requests an amendment to Renewed Facility Operating License No. DPR-75 for Salem Nuclear Generating Station Unit
- 2. In accordance with 10 CFR 50.91 (b )(1 ), a copy of this request for amendment has been sent to the State of New Jersey.
The proposed change is requesting approval of a license amendment to revise the implementation period for Salem Unit 2 License Amendment 294. By letter dated April 28, 201 6, the NRC issued License Amendment No. 294 for Salem Unit 2, with implementation required during the spring 2017 refueling outage (2R22). This request is o revise the implementation period from the Spring 2017 refueling outage (2R22) to prior to restart from the Fall 2018 refueling outage (2R23).
Amendment 294 revises the Salem Unit 2 Technical Specification (TS) for replacement of the Westinghouse source range (SR) and intermediate range (IR) instrumentation with new instrumentation supplied by Thermo Scientific. Replacement of the SR and IR instrumentation may be moved to Fall 2018 refueling outage. Moving the implementation of Salem Unit 2 Amendment 294 to prior to restart from the Fall 2018 refueling outage will ensure that the Technical Specifications align with the instrumentation currently installed in the plant. to this letter provides an evaluation supporting the proposed change.
PSEG requests NRC approval of the proposed License Amendment by June 4, 2017, to allow Salem Unit 2 restart upon completion of the 2R22 refueling outage in the event the replacement of SR and IR instrumentation cannot be completed as currently planned.
There are no regulatory commitments contained in this letter.
LR-N17-0058 10 CFR 50.90 Page 2 This proposed change has been reviewed by the Plant Operations Review Committee.
If you have any questions or require additional information, please contact Brian Thomas at (856) 339-2022.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on ] /I 3 /17 (Date)
Respectfully, c
t:Vf1 Charles V. McFeaters Site Vice President Salem Generating Station Attachments:
- 1. License Amendment Request to Extend the Implementation Period for Salem Unit 2 License Amendment No. 294 cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, Project Manager, NRC NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator
LR-N17-0058
___/
LAR S17-02 SALEM GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 License Amendment Request to Extend the Implementation Period for Salem Unit 2 License Amendment No. 294 Table of Contents
- 1.
SUMMARY
DESCRIPTION ....................................................................................... 2
- 2. DETAILED DESCRIPTION ........................................................................................ 2
- 3. TECHNICAL EVALUATION ....................................................................................... 3
- 4. REGULATORY EVALUATION .................................................................................. 3 4.1 No Significant Hazards Consideration ............................................................ 3 4.2 Applicable Regulatory Requirements/Criteria ................................................. 4 4.3 Precedents .... ................................................................................................ 5
- 5. ENVIRONMENTAL CONSIDERATION ..................................................................... 5
- 6. REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 0
1 of 5
LR-N17-0058 LAR S17-02 1.0 S UMMARY DESCRIPTION This license amendment request is to revise the implementation period for Salem Unit 2 License Amendment No. 294. PSEG Nuclear LLC (PSEG) proposes to revise the implementation period associated with Unit 2 Amendment No. 294 from the Spring 2017 refueling outage (2R22) to prior to restart from the Fall 2018 refueling outage (2R23).
By letter dated April 28, 2016, the NRC issued License Amendment No. 294 for Salem Unit 2.
This amendment revises the Salem Unit 2 Technical Specification (TS) for replacement of the Westinghouse source range (SR) and intermediate range (IR) instrumentation with new instrumentation supplied by Thermo Scientific.
The amendment was effective as of the date of issuance and is required to be implemented during the Spring 2017 refueling outage (2R22).
2.0 DETAILED DESCRIPTION The Amendment 294 implementation period requires the amendment to be implemented prior to the end of the Spring 2017 refueling outage. Amendment 294 revises the Salem Unit 2 TS for replacement of the Westinghouse source range (SR) and intermediate range (IR) instrumentation with new instrumentation supplied by Thermo Scientific.
To support the replacement of the Westinghouse SR and IR channels during the 2R22 outage, PSEG plans to take this instrumentation out of service upon entry into Mode 6 after plant shutdown and to rely on alternate instrumentation during Mode 6 as allowed by TS 3.9.2.2.
This plan was developed to minimize the impact to critical path of the outage. The SR and IR detectors will have to be replaced prior to filling the refueling cavity for the core offload. The instrumentation channel hardware could then be replaced during the Mode 6 and defueled outage windows without impacting the critical path of the outage. Prior to the 2R22 refueling outage, a concern was identified with one of the alternate instrumentation channel's ability to meet the requirements of TS 3.9.2.2. In the event the alternate instrumentation cannot be made operable to meet the requirements of TS 3.9.2.2, the existing SR channels will be required to remain in service to support the core offload.
During 2R22, the cavity will remain flooded during the defueled period to support scheduled work inside the reactor vessel. Maintaining the cavity flooded during the defueled period prevents access for the replacement of the source range and intermediate range detectors that are located under the refueling cavity. As a result, the replacement of the source range and intermediate range detectors would not be able to start until after the core is reloaded and the reactor cavity is drained. Starting the replacement following the core reload would require Salem Unit 2 to be in the TS action statement for having no source range channels operable during the replacement evolution. In addition, starting the replacement work at this point in the outage is estimated to add approximately 10 days to the overall length of the refueling outage.
Therefore, the replacement of the Westinghouse SR and IR instrumentation would be moved to the Fall 2018 refueling outage to avoid significant impact to the 2R22 outage.
Moving the implementation of Salem Unit 2 Amendment 294 to prior to restart from the Fall 2018 refueling outage will ensure that the technical specifications remain aligned with the instrumentatio11 installed in the plant. Repair of the alternate indication will continue during the 2 of 5
LR-N17-0058 LAR S17-02 Spring 2017 outage to ensure its ability to meet TS 3.9.2.2 requirements for use during the SR and IR replacement iri the Fall 2018 outage.
3.0 TECHN ICAL EVALUATION The request for extending the implementation period is not a technical or safety issue. The proposed change is purely an administrative change. In issuing an amendment to an operating license, the NRC staff states when the amendment is effective. and when the amendment must be implemented. These dates are given in the Enclosure of the amendment and are part of the operating license for the plant. Although, there are no regulatory requirements on the implementation date specified in an amendment, the licensee is required by the operating license to fully implement the amendment by the date specified (i.e., by a date no later than that specified).
Revising the implementation period of Salem Unit 2 Amendment No. 294 does not pose any nuclear safety impact. Moving the implementation of Salem Unit 2 Amendment 294 to prior to restart from the Fall 2018 refueling outage will ensure that the technical specifications align with the instrumentation currently installed in the plant.
4.0 REGULATORY EVALUATION
4.1 No Significant Hazards Consideration In accordance with 10 CFR 50.90, PSEG Nuclear LLC (PSEG) hereby requests an amendment to Renewed Facility Operating License No. DPR-75 for Salem Nuclear Generating Station Unit
- 2. The proposed license amendment revises the implementation period specified in Salem Unit 2 License Amendment No. 294 from the Spring 2017 refueling outage (2R22) to prior to restart from the Fall 2018 refueling outage (2R23). This change will support moving the replacement of the Westinghouse source range and intermediate range nuclear instrumentation to the 2R23 refueling outage if necessary.
PSEG has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Do the proposed canges involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed amendment implementation schedule revision is administrative in nature and does not require any modifications to or change in operation of plant systems or components. The change to the amendment implementation period does not increase the probability or consequences of an accident previously evaluated in the Updated Final Safety Analysis (UFSAR). Current Technical Specification (TS) requirements will continue to ensure the plant is operated consistent with the UFSAR accident analysis with the currently installed source range and intermediate range nuclear instrumentation.
3 of 5
LR-N17-0058 LAR 817-02 Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed amendment implementation schedule revision is administrative in nature.
The revision of the amendment implementation does not require any physical plant modifications, does not alter any plant systems or components, and does not change the operation of the plant.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Do the proposed changes involve a significant reduction in a margin of safety?
Response: No.
Margin of safety is related to the confidence in the ability of the fission product barriers to perform their intended functions. These barriers include the fuel cladding, the reactor coolant system pressure boundary, and the containment. The proposed TS change is administrative in nature and does not affect any of these barriers. Current TS requirements will continue to ensure the plant is operated consistent with the UFSAR accident analysis with the currently installed source range and intermediate range nuclear instrumentation.
Therefore, the proposed change does not involve a significant reduction in the margin of safety.
Based upon the above, PSEG Nuclear LLC concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92, and, accordingly, a finding of no significant hazards consideration is justified.
4.2 Applicable Regulatory Requirements and Criteria The proposed change has been evaluated to determine whether applicable regulations and requirements continue to be met. PSEG has determined that the proposed change does not require any exemptions or relief from regulatory requirements other than the operating license.
The following applicable regulations and regulatory requirements were reviewed in making this determination: 10 CFR 50.90, 10 CFR 50.91, and 10 CFR 50.92.
4 of 5
LR-N17-0058 LAR S17-02 4.3 Precedents Two similarly related license amendments involving extensions to license amendment implementation periods were approved in 2015 and are summarized below:
- 1. Limerick Generating Station Unit 2 ...:. Issuance of Exigent Amendment Re: Extend Implementation Period for Amendment No. 174- Leak Detection System Setpoint and Allowable Value Changes (TAG No. MF5695), dated February 25, 2015 (ADAMS Accession No. ML15049A084). The license amendment extended the implementation period for Amendment No. 174 from 60 days to prior to startup from the spring 2015 refueling outage. There were no actual changes to the Technical Specifications.
- 2. Columbia Generating Station- Issuance of Amendment Re: Extension of Implementation Period for Amendment No. 232 Changing Technical Specification Table 3.3.1.1-1 Function 7, "SCRAM DISCHARGE VOLUME WATER LEVEL- HIGH" (Exigent Circumstances) (TAG No. MF6234), dated June 11, 2015 (ADAMS Accession No. ML15154A800). The license amendment extended the implementation period for Amendment No. 232 from refueling outage R-22 (ongoing at the time of the request) to prior to restarting from refueling outage R-23 scheduled for spring 2017. There were no actual changes to the Technical Specifications.
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for .
categorical exclusion set forth in 10 CFR 51.22(c )(9). Therefore, pursuant to 10 CFR 51.22(b ),
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. PSEG letter to NRC, "License Amendment Request Regarding Replacement of Source and Intermediate Range Neutron Monitoring Systems," dated April 3, 2015 (ADAMS Accession No. ML15093A291)
- 2. NRC letter to PSEG, "Salem Nuclear Generating Station, Unit Nos.1 and 2 - Issuance of Amendments RE" Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066)," dated April 28, 2016 (ADAMS Accession No. ML16096A419) 5 of 5