Forwards Insp Repts 50-220/99-07 & 50-410/99-07 on 990718- 0911.Violation Noted Involving Failure to Properly Calibrate Unit 1 Feedwater Flow Control Valve Following Mod Performed During Last Refueling Outage
ML17059C795
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/08/1999
From: Marilyn Evans
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mueller J
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059C796 List:
References
50-220-99-07, 50-410-99-07, NUDOCS 9910190046
Download: ML17059C795 (6)


See also: IR 05000220/1999007

Text

Octobei

8, 1999

Mr. John H.

Mueller'hief

Nuclear Officer

Niagara Mohawk Power Corporation

Nine Mile Point Nuclear Station

Operations Building, 2nd Floor

P.O. Box 63

Lycoming, NY 13093

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NOS. 50-220/99-07

AND 5041 0/99-07

Dear Mr. Mueller:

This report transmits the findings of safety inspections conducted by NRC inspectors at the

Nine Mile Point Nuclear Station, Units 1 and 2, from July 18 through September

11, 1999. At

the conclusion of the inspection, the findings were discussed with members of your staff.

Overall plant staff performance was adequate and both units were operated in a safe and

generally conservative manner.

However, we were concerned that on July 23, the control room

operators continued testing of Unit 1 turbine controls in spite of initial anomalous pressure

response.

As a result of the continued testing, the unit automatically shutdown.

In addition,

other maintenance and operations staff errors either contributed to or were precipitated by

events at both units during the inspection period. The maintenance staff errors involved poor or

incomplete work planning and execution and some of the operator performance errors involved

poor procedural adherence.

You acknowledged these issues at the exit meeting and

I

encourage you to continue your efforts to address thes'e performance shortcomings.

Based on the results of this inspection, the NRC has determined that a Severity Level IV

violation of NRC requirements occurred.

This violation is being treated as a Non-Cited Violation

(NCV), consistent with Appendix C of the Enforcement Policy. The NCV is described in the

subject inspection report and involved the failure to properly calibrate a Unit 1 feedwater flow

control valve following a modiTication performed during the last refueling outage.

Ifyou contest

the violation or severity level of the NCV, you should provide a response within 30 days of the

date of this inspection report, with the basis for your denial, to the Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the

Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear

Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the

Nine Mile Point facility.

99iOi90046 99i008

PDR

ADQCK 05000220

8

PDR

OFFICIAL RECORD

COPY

IE: 01

John H. Mueller

In accordance with 10CFR2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures willbe placed in the NRC Public Document Room.

Sincerely,

Original Signed

by:

Michele G. Evans, Chief

Projects Branch

1

Division of Reactor Projects

Docket Nos.

50-220, 50-410

License Nos.

DPR-63, NPF-69

Enclosure:

NRC Inspection Report Nos. 50-220/99-07 and 50-410/99-07

Docket Nos.

50-220

50%10

cc w/encl:

G. Wilson, Esquire

M. Wetterhahn, Winston and Strawn

J. Rettberg, New York State Electric and Gas Corporation

P. Eddy, Electric Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

J. Vinquist, MATS, Inc.

F. Valentino, President, New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

T. Judson, Syracuse Peace Council

Jolin H. Mueller

Distribution w/encl:

H. Miller, RA/J. Wiggins, DRA (1)

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident Inspector

M. Evans, DRP

W. Cook, DRP

R. Junod, DRP

Distribution w/encl: (VIAE-IIAIL)

M. Tschiltz RI EDO Coordinator

G. Hunegs - Nine Mile Point

E. Adensam, NRR

D. Hood, NRR

Inspection Program Branch (IPAS)

R. Correia, NRR

DOCDESK

DOCUMENT NAME: G:)BRANCH19NMPSTUFRNMP9907.WPD

To receive a copy, indicate in the box: "c = copy w/attachment/enctosure

"E"= copy w/attachment/enctosure

"N"= No cop

FFICE

AME

ATE

Rl/DRP

I, E

GHunegs,g~

P

10/08/99

RI/DRP

E

MEvans/

10/3/99

OFFICIAL RECORD COPY