Forwards Insp Repts 50-220/99-03 & 50-410/99-03 on 990214-0327.Violations Being Treated as non-cited Violations
ML17059C645
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/23/1999
From: Barber G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mueller J
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059C646 List:
References
50-220-99-03, 50-220-99-3, 50-410-99-03, 50-410-99-3, NUDOCS 9904300119
Download: ML17059C645 (8)


See also: IR 05000220/1999003

Text

CATEGORY

2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9904300119

DOC.DATE: 99/04/23

NOTARIZED: NO

FACXL:50-220 Nine Mile Point Nuclear Station,

Unit 1, Niagara

Powe

50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara

Moha

AUTH.NAME

AUTHOR AFFILIATION

BARBER, G. S.

Region

1 (Post

820201)

RECXP.NAME

RECIPIENT AFFILIATION

MUELLER,J.H.

Niagara

Mohawk Po~er Corp.

SUBJECT:

Forwards insp repts

50-220/99-03

R 50-410/99-03

on

990214-0327.Violations

being treated

as non-cited.

violations.

DISTRIBUTION CODE:

IEOIP

COPIES

RECEIVED: LTR I

ENCI

I

SIZE: 3

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET I

05000220

05000410

A

Z5

RECIPIENT

ZD CODE/NAME

LPDl-1 PD

INTERNAL: ACRS

DEDRO

NRR/DZPM/IOLB

NUDOCS-ABSTRACT

OGC/HDS3

XTERNAL: LMZTCO MARSHALL

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HOOD,D

CE

NRR/DRIP/REXB

OE

RGN1

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO RE'DUCE HAS

O'.

"

'E y

~

R

DUCE WAS i

.

O 6 i'OUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE TH- NUMB:-R OF COP-ES RECEIV:-D B. .OJ O? YOJR ORG ': ZA ION

CONTACT TH

DO

DESK

(DCD)

ON EXTENSION 435-2083

D

CUMENT CONTROL

TOTAL NUMBER OF

COPXES

REQUIRED:

LTTR

17

ENCL

17

April 23,

1999

Mr. John H. Mueller

Chief Nuclear Officer

Niagara Mohawk Power Corporation

Nine Mile Point Nuclear Station

Operations Building, 2nd Floor

P.O. Box 63

Lycoming, NY 13093

SUBJECT:

NRC INSPECTION REPORT NOS. 50-220/993

AND 50%10/9943

Dear Mr. Mueller:

This report transmits the findings of safety inspections conducted by NRC inspectors at the

Nine Mile Point Nuclear Station, Units 1 and 2, from February 14, through March 27, 1999. At

the conclusion of the inspection, the findings were discussed with members of your staff.

During the six-week inspection period covered by this report, operation of the Nine Mile Point

Nuclear Station refiected an appropriate safety focus.

This inspection period was marked by your identification of several deficiencies associated with

previous in-service inspection results and other engineering design issues.

Your continued

efforts to identify and resolve engineering issues, were apparent..

Work control continued to'be a challenge.

In particular, two instances were noted that indicated

continued weaknesses

in the planning, scheduling, and conduct ofwork. In the first instance

two Unit 1 Emergency Diesel Generators were made simultaneously inoperable due to a

j

planning error and in the second instance a minor unexpected power transient resulted from the

calibration of a feedwater temperature element.

The NRC recognizes that you have placed a

high priority on improving work planning and that you are implementing several initiatives to

improve the processes.

However, continued management

attention on the control and conduct

of work activities is warranted.

Based on the results of this inspection, the NRC has determined that seven violations of NRC

requirements occurred.

These violations are being treated as Non-Cited Violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. Ifyou contest the violation or severity level of these NCVs, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

denial, to the Nuclear Regulatory Commission, ATlN: Document Control Desk, Washington, DC

20555-0001, with a copy to the Regional Administrator, Region I, and the Director, Office of

Enforcement, Nuclear Regulatory Commission, Washington, DC 20555-0001.

9904300ii9 990423

PDR

ADOCK 05000220

8

PDR

OFFICIAL RECORD

COPY

IE:01

0

John H. Mueller

In accordance with,10CFR2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures willbe placed in the NRC Public Document Room.

Sincerely,

Original Signed

by:

G. Scott Barber, Acting Chief

Projects Branch

1

Division of Reactor Projects

Docket Nos.

50-220, 50-410

License Nos.

DPR-63, NPF-69

Enclosure:

NRC Inspection Report Nos. 50-220/99-03 and 50-410/99-03

cc w/encl:

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

J. Rettberg, New York State Electric and Gas Corporation

P. Eddy, Electric Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

J. Vinquist, MATS, Inc.

F. Valentino, President, New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

John H. Mueller

Distribution w/encl:

H. Miller, RA/J. Wiggins, DRA (1)

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident Inspector

S. Barber, DRP

W. Cook, DRP

R. Junod, DRP

Distribution w/encl: (VIAE-INAIL)

M. Tschiltz, Rl EDO Coordinator

G. Hunegs - Nine Mile Point

S. Bajwa, NRR

D. Hood, NRR

M. Campion, Rl

Inspection Program Branch (IPAS)

R. Correia, NRR

DOCDESK

DOCUMENT NAME: G:>BRANCH1'tNMP9903.WPD

TO reCeiVe a COpy, indiCate in the bOX: "C" = Copy w/attachment/enclosure

"E" = Copy w/attachment/enclosure

"N"= No cop

FFICE

RI/DRP

E- RI/DRP

AME

GHuneg

~

<

GBarbe

ATE

04/"B'99

04n999

OFFICIAL RECORD COPY