Text

+M Cy b

IVl0 Rf00

~o 0O

(

4'O

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 fby 20, 1998 Mr. Richard B. Abbott Vice President - Nuclear Engineering Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093

SUBJECT:

REQUEST FOR WITHHOLDINGINFORMATIONFROM PUBLIC DISCLOSURE NINE MILEPOINT NUCLEAR STATION, UNIT NO. 1

Dear Mr. Abbott:

By your application dated April 16, 1998, and affidavit dated March 23, 1998, executed by George B. Stramback of General Electric (GE), you submitted GE-NE 523-B13-01869-113KKM, "Summary of KemKraftwerk Muehleberg Shroud Sample Metallurgical Evaluation" dated March 1998 and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.

You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1.

Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; 2.

Information which, ifused by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; 3.

The information identified, is classified as proprietary because it contains detailed plant unique results of analytical models, methods and processes, including computer codes, which GE has developed and applied to perform evaluations of indications in the core shroud for the BWR.

The development and approval of the BWR Shroud Repair Program was achieved at a significant cost, on the order of one million dollars, to GE.

The development of the evaluation process contained in the document along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.

9805260i84 980520 PDR ADOCK 05000220 PDR Li'Fh Z2 L'MllPlCSi~"7

May 20, 1998 R. B. Abbott Therefore, the GE-NE 523-B13-01869-113KKM, "Summary of KemKraftwerk Muehleberg Shroud Sample Metallurgical Evaluation" dated March 1998 marked as proprietary, willbe withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, ifany, of persons properly and directly concerned to inspect the documents.

Ifthe need arises, we may send copies of this information to our consultants working in this area.

We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

Ifthe basis for withholding this information from public inspection should change in the future such that the information, could then be made available for public inspection, you should promptly notify the NRC. You also should, understand that the NRC may have cause to review this determination in the future, for example, ifthe scope of a Freedom of Information Act request includes your information. In all review situations, ifthe NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure

'incerely, Original Signed by:

Darl S. Hood, Senior Project Manager Project Directorate !-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page DISTRIBUTION:

Q3o.cger<<'.F,ile 4 PUBLIC PDI-1 R/F J. Zwolinski ACRS S., Bajwa, S. Little D.'ood

~ OGC

'- S. Little C. Hehl, RGI I

DOCUMENT NAME: G:>NMP15WITHHOLD.ING,,

To receive a copy of this document, indicate in the box: '"C" = Copy without attachment/enclosure "E"

Cop with attachment/enclosure "N"

o co OFFICE PM:PDI-1 E

LA:PDI-1 D:PDI-1 OGC 05/ 6/98 DATE 05/ S/98 KAME DKood: Icc SLittI SBajwa 05/~

/98 Official Record Copy MPSicmien 05/

/98 05/

/98

1 l'

1 11 1l

Nay 20, 1998 R. B. Abbott Therefore, the GE-NE 523-B13-01869-113KKM, "Summary of KemKraftwerk Muehleberg Shroud Sample Metallurgical Evaluation" dated March 1998 marked as proprietary, willbe withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, ifany, of persons properly and directly concerned to inspect the documents.

Ifthe need arises, we may send copies of this information to our consultants working in this area.

We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

Ifthe basis forwithholding this information from public inspection should change in the future such that the information could then be made available for public inspe'ction, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, ifthe scope of a Freedom of Information Act request includes your information.

In all review situations, ifthe NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure

'Sincerely, Original Signed by:

Darl S. Hood, Senior Project Manager Project Directorate l-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page DISTRIBUTION:

Docket File PUBLIC PDI-1 R/F J. Zwolinski ACRS S. Bajwa S. Little D. Hood OGC S. Little C. Hehl, RGI=

DOCUMENT NAME: G:>NMP1(WITHHOLD.ING To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"

Co with attachment/enclosure "N"

o co OFFICE PM:PDI-1 E

LA:PDI-1g D:PDI-1 HAME DHood: lcc SLItel SBB lie HPSIemien DATE 05/ S /98 05/.+i/98 05/~

/98 Official Record Copy 05/

/98 05/

/98

R.

B. Abbott Therefore, the GE-NE 523-B13-01869-113KKM, "Summary of KemKraftwerk Muehleberg Shroud Sample Metallurgical Evaluation" dated March 1998 marked as proprietary, willbe withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, ifany, of persons properly and directly concerned to inspect the documents.

Ifthe need arises, we may send copies of this information to our consultants working in this area.

We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

Ifthe basis forwithholding this information from public inspection should change in the future'uch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, ifthe scope of a Freedom of Information Act request includes your information.

In all review situations, ifthe NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, Docket No. 50-220 cc: See next page Darl S. Hood, Senior Project Manager Project Directorate l-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Richard B. Abbott Niagara Mohawk Corporation CC:

Regional Administrator, Region I

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Mr. John H. Mueller Chief Nuclear Officer Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Operations Building, Second Floo'r P.O. Box 63 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza Albany, NY 12223 Mr. F. WilliamValentino, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Mark J. Wetterhahn, Esquire Winston B Strawn 1400 L Street, NW Washington, DC 20005-3502 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, NY 13202 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126

~,