April 17, 1998 Mr. John H. Mueller Senior Vice President Niagara Mohawk Power Corporation Operations Building 2nd Floor P.O. Box 63 Lycoming, NY 13093

SUBJECT:

MAINTENANCERULE BASELINE INSPECTION FOR NINE MILE 2

Dear Mr. Mueller:

In a telephone conversation on April 16, 1998, between Denise Molniak and Thomas Kenny, arrangements were made for the NRC to conduct a baseline inspection of your maintenance rule program at Nine Mile 2. The inspection is planned for the week of June 15-19, 1998.

The inspection objective is to evaluate your performance to support compliance with the requirements of 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants."

The inspection will be conducted using Inspection Procedure 62706, "Maintenance Rule" and willinvolve a team of at least 4 inspectors.

The team will require information about your program for our in-office preparation for the inspection.

This information is identified in the enclosure to this letter.

Please provide this information to Mr. T. Kenny by May 18, 1998.

Denise Wolniak has been advised of this request.

Thank you for your cooperation in this matter.

If you have any questions regarding this inspection, please contact me at (610) 337-5183 or E-mail address RJC@NRC.GOV.

Sincerely, Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-410

Enclosure:

Reference Material

(

~g) I 9804240059 980417 PDR ADOCK 05000410 8

PDR

Mr. John H. Mueller cc w/enclosure:

G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn J. Rettberg, New York State Electric and Gas Corporation P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Vinquist, MATS, Inc.

F. Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority

r

Mr. John H. Mueller Distribution w/encl:

H. Miller, RA/W. Axelson, DRA D. Screnci, PAO Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC NRC Resident Inspector

J. Wiggins, DRS L. Nicholson, DRS R. Conte, DRS T. Kenny, DRS L. Doerflein, DRP R. Junod, DRP DRS File DOCUMENT NAME: g:>olhp>kenny)mri.nm2 To receive a copy of this document, indicate in the box: "C" ~ Copy without attachment/enctoaure "E" = Copy with attachment/enctosure "N"~ No copy OFFICE NAME DATE RI'DRS TKenny 04/1 6/98 RI:DRS RConte 04/J / 8 OFFICIAL RECORD COPY 04/

/98

.~

REFERENCE MATERIALFOR MAINTENANCERULE INSPECTION Copy of Maintenance Rule Program and all related procedures (covering all modes of operations) including those relating to expert panels, PRA, risk assessments and ranking, and scoping.

Also, procedures used for assessing risk when taking equipment out of service.

If not included in the procedures, please provide the definition of availability and reliability used at the site.

"2.

List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.

%3 List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.

%4 List of maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.

%5 List of high risk and low risk significant SSCs.

In this list also include: (1) low risk significant standby SSCs; (2) the top 20 low risk significant SSCs which missed the cut off; (3) the SSCs with risk significance different from that determined by PRA.

"6.

Assessments of risk significant and risk rankings.

Risk reduction worth, risk achievement worth, and core damage frequency results, if applicable.

%7 Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.

8.

Background explanations

( i.e. copies of "conditions adverse to quality reports" etc.)

for SSCs currently assigned to the (a)(1) category.

9.

Copy of any internal or external maintenance rule assessments.

10.. Current maintenance rule trending data.

Current performance criteria and goals for SSCs.

Include a list of SSCs classified as

".inherently reliable" and/or "run to failure". If PRA used, provide PRA information such as reliability and availability basic events in the PRA used for risk ranking compared to performance criteria established for these SSCs.

12.,

Qualifications and backgrounds for Expert Panel Members.

Criteria used by the expert panel to determine risk significance for all modes of operation.

Minutes from the last five expert panel meetings.

"13.

Summary of significant changes made to the PRA model since the IPE.

14, Copies of equipment status documents (LCO logs, Equipment tagging logs, RO and SRO logs) for the last month of power operation.

Items identified with asterisk (") are needed for in-office review prior to the inspection onsite.