ML17059B519
| ML17059B519 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/28/1997 |
| From: | Hood D NRC (Affiliation Not Assigned) |
| To: | Downing L, Gagne C AFFILIATION NOT ASSIGNED |
| References | |
| NUDOCS 9704300200 | |
| Download: ML17059B519 (4) | |
Text
Apr'8, 1997 Ms. Cindy Gagne 510 West First Street South
- Fulton, NY 13069 Ms. Linda Downing 107 Albright Road
- Mexico, NY 13114 Dear Ms.
Gagne and Ms. Downing:
Your letter of April 22,
- 1997, requested a writte'n transcript of the NRC's meeting with the public on April 14, 1997, regarding the Unit 1 core shroud at Nine Mile Point Nuclear Station.
You asked that this transcript be published before the unit is allowed to restart.
I am enclosing a copy of the NRC's summary of the April 14, 1997, meeting.
There is no written transcript of the meeting.
- Rather, as noted in the enclosed
- summary, video tapes of the meeting are available for a fee from the NRC Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555 (phone 800-397-4209, fax 202-634-3343, e-mail pdrenrc.gov).
I appreciate your interest in this matter and your participation during the meeting.
Sincerely,
/s/
Darl S.
Hood, Senior Project Manager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosure:
Meeting summary DISTRIBUTION:
Docket File PUBLIC PDI-1 Reading SVarga SBajwa SLittle DHood OGC ACRS CCowgill, RI DOCUMENT NAME:G:iNMPliGAGNE To receive a copy of this document, indicate in the box:
"C" = Copy without attachment/enclosure "E" = Co y with attachment/enclosure "N"
.= No co y OFFICE NAME DATE PM:PDI-1 D:PDI-1 E
LA:PDI-1 DHood:m SLittle SBajwa r 04/
/97 04/~/97 04/
/97' 1 ci a Recor Copy 04/
/97 04/
/97 QQOQ33 9704300200 970428 PDR ADQCK 05000220 P
(
I 1
q I i
i
~S AK00
~o ly A,
I ClO IVl Op
/p gO
++**+
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 April 28, 1997 Hs. Cindy Gagne 510 West First Street South
- Fulton, NY 13069 Hs. Linda Downing 107 Albright Road
- Hexico, NY 13114 Dear Hs.
Gagne and Hs. Downing:
Your letter of April 22,
- 1997, requested a written transcript of the NRC's meeting with the public on April 14, 1997, regarding the Unit 1 core shroud at Nine Hile Point Nuclear Station.
You asked that this transcript be published before the unit is allowed to restart.
I am enclosing a copy of the NRC's summary of the April 14, 1997, meeting.
There is no written transcript of the meeting.
- Rather, as noted in the enclosed
- summary, video tapes of the meeting are available for a fee from the NRC Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555 (phone 800-397-4209, fax 202-634-3343, e-mail pdr8nrc.gov).
I appreciate your interest in this matter and your participation during the meeting.
Sincerely, 8~4 I~
Darl S.
Hood, Senior Project Hanager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-220
Enclosure:
Meeting summary
o
~