t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON( D C 2D55 i4001 March 5, 1997 t
Mr. B. Ralph Sylvia Executive Vice President, Generation Business Group and Chief Nuclear Officer Niagara Mohawk Power Corporation Nuclear Learning Center 450 Lake Road
- Oswego, NY 13126
SUBJECT:
FOUR RELIEF REQUESTS FOR VALVE INSERVICE TESTING PROGRAH-NINE MILE POINT UNIT 1
(TAC NO. H96337)
Dear Hr. Sylvia:
By letter dated August 9,
- 1996, as supplemented February 28,
- 1997, Niagara Mohawk Power Corporation proposed revisions to four relief requests for Nine Mile Point Nuclear Station, Unit 1
(NMP-1), with respect to the second ten-year interval program for inservice testing of valves.
The four requests are identified as:
VG-2, Revision 1;
CS-RR-6, Revision 1;
LP-RR-2, Revision 1;
and CRD-RR-3, Revision 1.
The existing version of these relief requests were previously by the NRC staff in safety evaluations dated March 7, 1991 (Relief Requests VG-2, LP-RR-2, and CRD-RR-3),
and July 26, 1995 (Relief Request CS-RR-6).
As described in the enclosed safety evaluation (SE), the NRC staff has completed its review of the your submittals and concludes that:
1.
The Code requirement for Relief Request CS-RR-6, Revision 1, is impractical to perform and the relief is granted as requested pursuant to 10 CFR 50.55a(f)(6)(i).
2.
For Relief Requests LP-RR-2, Revision 1,
and CRD-RR-3, Revision 1,
your proposed alternative to defer verification of reverse flow closure to refueling outages is approved pursuant to 10 CFR 50.55a(f)(4)(iv) based upon your letter dated February 28,
- 1997, which proposes to meet the requirements of Paragraphs 4.3.2, and 6.2 of OH-10 and reference Section
- 3. 1. 1.3 of NUREG-1482 in the IST program.
3.
For Relief Request VG-2, Revision 1, your proposed alternative to use Option B to 10 CFR 50, Appendix J for leakage-rate testing of LJ containment isolation valves is approved pursuant to the provisions in 10 CFR 50.55a(f)(4)(iv) based upon your letter dated February 28,
- 1997, which proposes to meet OH-10 paragraphs 4.2.2.2, "Containment Isolation Valves;" 4.2.2.3(e),
"Analysis of Leakage-Rates;"
and 4.2.2.3(f), "Corrective Action."
The proposed alt'ernative in relief request VG-2, Revision 1, to not perform the trending required by IWV-3427(b) for LA containment isolation tmC HLE Col'H CSH'703070152 970305 PDR ADGCK 05000220 P
I l
I
B. Ralph Sylvia valves is approved because you will meet the NRC staff position as stated in GL 89-04, Position 10.
The proposal to leak test the pressure isolation valves in accordance with the technical specifications and the guidelines in NUREG-1482, Section 4.4.7, "Pressure Isolation Valves," rather than IWV-3420 is approved pursuant to 10 CFR 50.55a(a)(3)(i),
since it provides an acceptable level of quality and safety.
You should complete the actions to comply with the provisions in the approval of the alternative testing proposed for relief requests LP-RR-2, Revision 1, CRD-RR-3, Revision 1, and VG-2, Revision 1, within 180 days from the date of this letter.
If you have any questions regarding the enclosure, contact Hr. Darl Hood by phone at (301) 415-3049, or by electronic mail at dsh8nrc.corn.
1 Sincerely, Docket No. 50-220
Enclosure:
Safety Evaluation cc w/encl:
See next page S.
ngh Bajwa, Acting Director Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
f '
Mar ch 5, 1997 B. Ralph Sylvia valves is approved because you will meet the NRC staff position as stated in GL 89-04, Position 10.
The proposal to leak test the pressure isolation valves in accordance with the technical specifications and the guidelines in NUREG-1482, Section 4.4.7, "Pressure Isolation Valves," rather than IWV-3420 is approved pursuant to 10 CFR 50.55a(a)(3)(i),
since it provides an acceptable level of quality and safety.
You should complete the actions to comply with the provisions in the approval of the alternative testing proposed for relief requests LP-RR-2, Revision 1,
CRD-RR-3, Revision 1,
and VG-2, Revision 1, within 180 days from the date of this letter.
If you have any questions regarding the enclosure, contact Mr. Darl Hood by phone at (301) 415-3049, or by electronic mail at dsh9nrc.corn.
Sincerely, ORIGINAL SIGNED BY A.
OROMERICK FOR:
Docket No. 50-220
Enclosure:
Safety Evaluation cc w/encl:
See next page S. Singh Bajwa, Acting Director Project Directorate I-l Division of Reactor. Projects I/II Office of Nuclear Reactor Regulation DISTRIBUTION:
Docket File PUBLIC PDI-1 R/F SVarga JZwolinski SBajwa SLittle DHood OGC ACRS CCowgill, RGN-I KDempsey GHill p+~
DOCUMENT NAME:
G:~NMPI)M96337.RR2
- See previous,'concurrence To receive a copy of this document, Indicate in the box: "C" ~ Copy without enclosures "E" ~ Copy with enclosures "N" ~ No copy OFFICE PM: PDI-1 NAME AWan rsl DATE 03~ /97 LA:PDI-1 SLittle 03/
/97 OGC*
EHoller 02/18/97 OFFICIAL RECORD COPY D'3/8+797 Ov(00 Qi
I I
l 1)
B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.
1 CC:
Hr. Richard B. Abbott Vice President and General Hanager-Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. Hartin J.
HcCormick, Jr.
Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hs. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. Kim A. Dahlberg General Manager - Projects Niagara Mohawk Power Corporation Nine Nile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. Norman L. Rademacher Plant Manager, Unit 1
Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. 'Box 126
'ycoming, NY 13093.
.Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, NY 12223 Mr. F. William Valentino, President New York State
- Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension
- Albany, NY 12203-6399 Hark J. Wetterhahn, Esquire Winston 8 Strawn 1400 L Street, NW Washington, DC 20005-3502 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126