ML17059B401

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1996 for Nine Mile Point Nuclear Station Unit 1
ML17059B401
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/31/1996
From: Coleman D, Rademacher N
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NMP91442, NUDOCS 9701220460
Download: ML17059B401 (12)


Text

CATEGORY 1 REGULATCO INFORMATION DISTRIBUTIONeSTEM (RIDE)

ACCESSION NBR:9701220460 DOC.DATE: 96/12/31 NOTARIZED: NO DOCKET FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 AUTH.NAME AUTHOR AFFILIATION COLEMAN,D.E.

Niagara Mohawk Power Corp.

RADEMECHER,N.

Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1996 for Nine Mile Point Nuclear Station Unit 1.W/970110 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR

- ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

C E

INTERNAL:

RECIPIENT ID CODE/NAME PD1-1 PD FILE GENER 1

. COPIES

. LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HOOD,D AEOD/SPD/RRAB NRR/DRPM/PECB RGNl COPIES LTTR ENCL 1

1 1

1 1

1 1

1 G

0 EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1

1 NOAC 1

1 D

0 U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL

. '.ll

NIAGARAMOHAWK G E N E RAT I 0 N BUSINESS GROUP NINE MILEPOINT NUCLEARSTATION/lAKEROAD, P O. BOX63, LYCOMING.NEW YORK 13093 January 10, 1997 NMP91442 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555 Nine Mile Point Nuclear Station Unit ¹1 Docket No. 50-220 DPR-63

Subject:

Operating Statistics and Shutdowns - December 1996 Gentlemen:

Submitted herewith is the Report of Operating Statistics, Unit Shutdowns and Power Reductions, and a Narrative of Operating Experience for December 1996 for the Nine Mile Point Nuclear Station Unit ¹1.

/Ih Norman L. Rademacher Plant Manager - Unit One Enclosures pc:

H.J. Miller, Regional Administrator, Region 1

B.S. Norris, Senior Resident Inspector 970i2204b0 9bi23i

~>'.PDRII<ADQCK 05000220

~ 'R'/'DR

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: 1/07/97 PREPARED BY: D. E<. Coleman TELEPHONE:

(315) 349-2558

1. Unit Name:

Nine Mile Point Unit 4I

2. Reporting Period:

December 1996

3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

642

5. Design Electrical Rating (Net MWe):

613

6. Maximum Dependable Capacity (Gross MWe):

584

7. Maximum Dependable Capacity (Net MWe):

565

8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative 8,784.0 8,200.3 0

8,135.3 0

14,289,134.0 4,807,837.0 4,676,173.0 92.6 92,6 94,2 86.8 6.1

11. Hours in Reporting Period 744.0
12. Number of Hours Reactor Was Critical 744.0
13. Reactor Reserve Shutdown Hours 0
14. Hours Generator On-Line 744.0
15. Unit Reserve Shutdown Hours 0
16. Gross Thermal Energy Generated (MWH) 1)354,632,0
17. Gross Electrical Energy Generated (MWH) 461,486.0
18. Net Electrical Energy Generated (MWH) 449,592.0
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (Using MDC Net) 107.0
22. Unit Capacity Factor (Using DER Net) 98.6
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

(35 Day Refuel Outage scheduled for March 3, 1997) 239,257.2 162) 277.0 1)204.2 158,356.2 20.4 269,206,780.0 89,578,456.0 86,861,554.0 66,2 66.2 60.1 58.6 22,4

25. Ifshutdown At End of Report Period, Estimated Date of Startup:

DOCKET NO.:

50-220 DATE: 1/07/97 PREPARED BY: D. E. Coleman TELEPHONE:

(315) 349-2558 MONTH December 1996 DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net)

DAY AVERAGE DAILYPOWER LEVEL (Mwe-Net)

I 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 616 616 615 615 616 616 610 616 612 616 615 615 616 605 580 615 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 616 616 616 616 617 616 616 600 461 490 616 615 617 617 616 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

v

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - December 1996 DOCKET NO: 50-220 UNIT NAME: NMPP1 DATE:

1/07/9+

'REPARED BY: D. E. Ctriemhn TELEPHONE:

(315) 349-2558 No.

Date Duration (Hours)

Reason'ethod of Shutting Down Reactor'icensee Event Report /l System Code'omponent Code'ause

& Corrective Action to Prevent Recurrence 961225 N/A N/A Pump B

/tl1 Circulating Water Pump Lead Failure t

F: Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG4161)

Exhibit 14ame Source

, ~

~

~

~

~

~

0 NIAGARAMOHAWKPOWER CORPORATION NINE MILEPOINT NUCLEAR STATION UNIT ¹1 NARRATIVEOF OPERATING EXPERIENCE The station operated during the month of December 1996 with a Unit Availability Factor of 100.0% and a Net Design Electrical Capacity Factor of 98.6%.

There were no challenges to the Electromatic Relief Valves. Reduction in Capacity Factor were due to various reasons.

¹13 Reactor Recirculation Pump was removed from service for maintenance.

On December 9, 1996,

¹13 RRP was returned to service.

On December 24, 1996, at about 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />, ¹11 circulating water pump tripped due to a faulty motor lead.

The unit was derated to 78% power for 47.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

Also, during the month power was reduced for a control rod pattern adjustment.

~

~