Forwards Insp Repts 50-220/96-11 & 50-410/96-11 on 960908-1019.No Violations Noted
ML17059B372
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 12/12/1996
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059B373 List:
References
NUDOCS 9612190029
Download: ML17059B372 (6)


See also: IR 05000220/1996011

Text

December

12,

1996

Mr. B. Ralph Sylvia

Executive Vice President Generation

Business

Group and Chief Nuclear Officer

Niagara Mohawk Power Corporation

Nuclear Learning Center

450 Lake Road

Oswego, New York 13126

SUBJECT

NRC tNSPECTtON REPORT NOS. 50-220/96-11 AND 50-410/96-11

Dear Mr. Sylvia:

This report transmits the findings of safety inspections conducted

by NRC inspectors at the

Nine Mile Point Nuclear Station, Units

1 and 2, from September

8 through October 19,

1996. At the conclusion of the inspection, the findings were discussed

with Mr. R.

Abbott, Vice President

5. General Manager, Nuclear Generation,

and other members of your

staff. We are providing one integrated report for the inspections conducted during this

period in order to better consolidate our inspection findings into a consistent regulatory

message

and to more clearly communicate how these findings may reflect a change

in your

performance.

During this period, your staff operated both units safely.

We noted that the increased

staffing of the outage shift managers for the Unit 2 refueling outage contributed to a better

focus by the shift managers

and provided for excellent coordination of activities.

Overall,

performance

in the radiation protection area was overall considered

good; the organization

was well staffed and radiation worker practices appeared

to have improved.

The Unit 2

refueling activities were generally well performed; but a.fuel bundle was mispositioned due

to multiple personnel

errors, poor oversight by the on-site supervisor,

and over-reliance

on

others to identify problems.

However, your corrective actions were adequate

and no

further problems occurred during the remainder of the core reload.

We are also concerned

about the amount of debris found in the Unit 2 suppression

pool

and downcomers

during the outage.

We consider this a significant issue because

of the

potential for the debris to clog the emergency core cooling pump suction strainers.

It

appears that the suppression

pool cleaning during the previous refueling outage was

inadequate.

Since this issue was identified at the end of this inspection period, we have

determined this issue is unresolved

pending further NRC review.

2

Qcv os000220

190029 9b1212

PDR

AD

PDR

6

OFFICIAL RECORD

COPY

\\

IE:01

Mr. B. Ralph Sylvia

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a cop; of this letter

and its enclosures,

and your response

will be placed in the NRC Public Document Room.

Your cooperation with us is appreciated.

Sincerely,

Original Signed by:

Lawrence T. Doerflein, Chief

Projects Branch

1

Division of Reactor Projects

Docket Nos.

License Nos.

50-220, 50-410

DPR-63, NPF-69

Enclosures:

NRC Inspection Report Nos. 50-220/96-11

and 50-410/96-11

cc w/enclosure:

R. Abbott, Vice President 5 General Manager - Nuclear

C. Terry, Vice President- Safety Assessment

and Support

M. McCormick, Vice President

- Nuclear Engineering

N. Rademacher,

Unit 1 Plant Manager

J. Conway, Unit 2 Plant Manager

D. Wolniak, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

J. Rettberg, New York State Electric and Gas Corporation

Director, Electric Division, Department of Public Seivice, State of New York

C. Donaldson,

Esquire, Assistant Attorney General, New York Department of Law

J. Vinquist, MATS, Inc.

P. Eddy, Power Division, Department of Public Service, State of New York

F. Valentino, President,

New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

Mr. B. Ralph Sylvia

Distribution w/encl:

D. Screnci, PAO (1)

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident Inspector

R. Correia, NRR

R. Frahm, Jr., NRR

L. Cunningham,

NRR

D. Barss, NRR

L. Doerflein, DRP

T. Moslak, DRP

R. Junod,

DRP

Distribution w/encl:

(VIA E-MAIL)

W. Dean OEDO

B. Norris - Nine Mile Point

S. Bajwa, NRR

D. Hood, NRR

K. Cotton, NRR

M. Campion,

Rl

Inspection Program Branch (IPAS)

DOCUMENT NAME: G:iBRANCH1iNMIR9611.BSN

To receive a copy of thta document, Indcate in the boxt

C

~ Copy without attachment/endoawe

E

~ Copy with attachmenVandoaure

rr i No copy

OFFICE

RI/DRP

RI/DRP

RI/DRP

NAME

8Norris

TMosla

LDoerflein

DATE

12/( /96

12

6

1 2/g/96

OFFICIAL RECORD COPY

0