ML17059B290
| ML17059B290 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/25/1996 |
| From: | Hood D NRC (Affiliation Not Assigned) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| TAC-M95100, NUDOCS 9609300269 | |
| Download: ML17059B290 (8) | |
Text
~qO.R A<0u,
~Ci+ >
Mp0 0O C
ul Cy Yg+
~O
++**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 25, 1996 Hr. B. Ralph Sylvia Executive Vice President and Chief Nuclear Officer Niagara Mohawk Power Corporation Generation Business Group D-2 300 Erie Boulevard West
- Syracuse, NY 13202
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE NINE MILE POINT NUCLEAR STATION UNIT NO.
1 (TAC NO. H95100)
Dear Hr. Sylvia:
By your application dated August 14,
- 1996, and affidavit dated August 13,
- 1996, executed by George B. Stramback of General Electric Company, you submitted GENE B13-01739-03, "Supplement 1, Nine Mile Point 1, Seismic Analysis Core Shroud Repair Modification" and requested that it be withheld from. public disclosure pursuant to 10 CFR 2.790.
A non-proprietary version was also submitted.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
Information that discloses a process,
- method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; 2.3.'nformation which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture,
- shipment, installation, assurance of quality, or licensing of a similar product; The information identified above, is classified as proprietary because it contains detailed results of analytical
- models, methods and processes, including computer codes, which GE has developed and applied to perform evaluations of the core shroud repair for the BWR [boiling-water reactor].
The development and approval of the BWR Shroud Repair Program was achieved at a significant cost, on the order of one million dollars, to GE.
The development of the evaluation process contained in the document along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.
39Pil ~
9609300269 960925 PDR ADOCK 05000220 P
'(t,",
Cl '
~
0
B. Ralph Sylvia Septemher 25, 1996 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely,
/s/
Darl S.
Hood, Senior Project Manager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc:
See next page DISTRIBUTION; Docket File JHitchell PUBLIC SLittle PDI-1 Reading DHood SVarga M.P. Siemien, OGC JZwolinski LDoerflein, RGN-I I
DOCUMENT NAME: NHPliH95100. LTR To receive a copy of this document, indicate in the box:
"C" = Copy without attachment enclosure "E" = Co y with attachment enclosure "N" = No co y OFFICE NAME LA:PDI-1 SLittle PH:PDI-1 DHood:mw
- D:PDI-1 JMitchell OGC HPSiemien l L=n6'8 DATE 09/ I0/96 09/
/96 09/
/96 09/
'/96 0
icosa Recor Copy 09/ (4 /96
J L
Jl L
il F
~
I J\\
B. Ralph Sylvia We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, 8 J>/~g Darl S.
Hood, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc:
See next page
C S
%LIVE
~ 4&
f
~
~ )
~,' t~,l,AI JV+
~
I B..Ralph,.Syl vi a Niagara Mohawk Power Corporation I
- ----.Nine-Mi-4-Poi.nt-Nuclear-.Shti-on--
Unit No.
1 CC:
Hr. Richard B. Abbott Vice President and General Manager Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. Martin J.
HcCormick; Jr.
Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Ms. Denise J. Wolniak.
Manager Licensing Niagara Mohawk Power Corporation Nine Nile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Mr. Kim A. Dahlberg General Manager Projects Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. Norman L. Rademacher Plant. Manager, Unit 1
Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 J
Charles Donaldson,- Esquire Assistant-Attorney General New York Department of,Law 120 Broadway
, New Yor k, NY 10271 Mr. Paul D.
Eddy State of New York.
Department of Public Service Power Division,'ystem Operations 3 Empire State Plaza
- Albany, NY 12223 Hr. F. William Valentino, President New York State
- Energy, Research, and Development Authority 2 Rockefeller Plaza
- Albany, NY 12223-1253 Hark J. Wetterhahn, Esquire Winston 5 Strawn 1400 L Street, NW Washington, DC 20005-3502 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard'est "
- Syracuse, NY 13202 Supervisor "
Town of Scriba Route 8, Box 382
- Oswego, NY 13126
J