ML17059B115

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-220/96-01 & 50-410/96-01 on 960107-0217 & NOV
ML17059B115
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/22/1996
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059B116 List:
References
NUDOCS 9604290265
Download: ML17059B115 (8)


See also: IR 05000220/1996001

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9604290265

DOC.DATE: 96/04/22

NOTARIZED: NO

DOCKET

~

~

~

.ACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara

Powe

05000220

50-410 Nine Mile Point Nuclear Station,

Unit 2, Niagara

Moha

05000410

AUTH.NAME

AUTHOR AFFILIATION

CONTE,R.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

SYLVIA,B.R.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards insp repts

50-220/96-01

& 50-410/96-01

on

960107-0217

& NOV.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTRl ENCL i

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD1-1

PD

INTERNAL: ACRS

AEOD/gTC

(F'KE=CEN'PER

<NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

TERNAL: LITCO BRYCE,J

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HOOD,D

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US

TO REDUCE WASTE)

CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEEDI

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

April 22,

1996

Hr.

B. Ralph Sylvia

Executive Vice President - Generation

Business

Group

Niagara

Mohawk Power Corporation

(NMPC)

Nine Mile Point Nuclear Station

P. 0.

Box 63

Lycoming,

NY 13093

SUBJECT:

NOTICE OF VIOLATION AND NRC COMBINED INSPECTION

REPORT

NOS. 50-220/96-01

AND 50-410/96-01

Dear Mr. Sylvia:

This letter transmits

the results of the resident

safety inspection led by Hr.

B. Norris, from January

7 through February

17,

1996, at the Nine Mile Point

Nuclear Station,

Units

1

and 2, Scriba,

New York.

The inspectors

based their

findings on observations

of activities in progress,

interviews with personnel,

and examinations of selected

procedures

and representative

records.

The

resident

inspectors

discussed

their findings with Hr. Richard

B. Abbott, Vice

President

and General

Manager,

Nuclear,

and other members of your staff, at

the exit meeting

conducted

on April 4,

1996.

The overall conclusions

are

reflected in the Executive

Summary.

Your staff operated

both units safely during the inspection period.

The

inspectors

observed that senior

management

was frequently seen

in the control

rooms

and that proper communications

amongst the operators

continues

to be the

norm.

We recognized

that the quick actions of the Unit

1 operators

prevented

a plant scram

when

a feedwater

pump tripped.

We considered

the trial

maintenance

program at Unit 2, the Fix-It-Now (FIN) team, to be

an effective,

multi-disciplined work group that

has

responded

well to emergent

issues

and

has also helped

in reducing the backlog of maintenance

items.

Also, your

actions related to

a potential

problem with the Unit 2 emergency diesel

generators

were timely and appropriate.

However, the inspectors

did identify that you installed

an emergency

temporary

modification prior to the completion of the required safety evaluation.

As

described

in the enclosed

Notice of Violation (Notice), this constituted

a

violation of 10 CFR 50.59,

which requires

a written safety evaluation

when

changes

are

made to the facility, as described

in the Updated

Final Safety

Analysis Report.

A contributing factor was that

a

common site procedure

GAP-

DES-03,

"Control of Temporary Modifications," allowed the modification to be

installed prior to the completion of the safety evaluation.

You are required

to respond to this letter

and should follow the instructions

in the Notice.

The inspectors

also identified that in the Unit 2 licensee

event report

(LER)

95-12,

"Automatic Actuation of the Standby

Gas Treatment

System

Because of

Inadequate

Corrective Action for Snow Plugging of the Filters," the corrective

actions described within the

LER did not address

the root cause of "inadequate

9604290265

9b0422

PDR

ADQCK 05000220

8

PDR

IE01

0

B. Ral ph Syl vi a

corrective actions."

Although the inspectors

ascertained

from your staff that

corrective actions

were taken to address

the root cause of inadequate

corrective actions

through the development of your deviation/event

report

(DER) process,

the failure to document

these corrective actions

in the

LER

makes

the report incomplete.

Therefore,

the

LER remains

open

and

we request

that you submit

a supplement

to the

LER that describes

completely the

corrective actions

to address

all root, causes.

In accordance

with 10 CfR 2.790 of the NRC's "Rules of Practice,"

a copy. of

this letter

and its enclosures,

and your response will be placed in the

NRC

Public Document

Room.

The responses

directed

by this letter and the enclos"d

Notice are not subject to the clearance

procedures

of the Office of Management

and Budget,

as required

by the Paperwork

Reduction Act of 1980,

Public

Law

Number 96.511.

We regret the untimely issuance

of this report but it was due to unanticipated

staff work and illness of a staff member.

Please

be advised that our

timeliness

should not diminish the importance of the violation and performance

issues

documented

herein,

Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

Docket Nos.

License

Nos.

50-220,

50-410

DPR-63,

NPF-69

Richard J.

Conte,

Chief

Projects

Branch

5

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Combined Inspection

Report

Nos.

50-220/96-01

and 50-410/96-01

cc w/encls:

R. Abbott, Vice President

& General

Manager-Nuclear

C. Terry, Vice President-Nuclear

Engineering

M. McCormick, Vice President-Safety

Assessment

and Support

K. Dahlberg,

General

Manager-Projects

N. Rademacher,

Unit

1 Plant Manager

J.

Conway, Unit 2 Plant Manager

D. Wolniak, Manager,

Licensing

J.

Warden,

New York Consumer Protection

Branch

G. Wilson, Senior Attorney

M, Wetterhahn,

Winston

and Strawn

Director,

Energy

& Water Division, Department of Public Service,

State of New York

C. Donaldson,

Esquire, Assistant Attorney General,

New York

Department of Law

J. Vinquist,

MATS, Inc.

J.

Spath,

President,

New York State

Energy Research

and Development Authority

B, Ralph Sylvia

Distribution w/encls:

D. Screnci,

PAO (2)

Region

I Docket

Room (with concurrences)

Nuclear Safety Information Center

(NSIC)

PUBLIC

NRC Resident

Inspector

R. Conte,

DRP

H. Eichenholz,

DRP

C. O'Daniell,

DRP

Distribution w/encls:

,'VIA E-MAIL)

W. Dean

OEDO

(WMD)

B. Norris - Nine Mile Point

S.

Shankman,

NRR

D. Hall,

NRR

M. Campion,

RI

M. Davis,

NRR

Inspection

Program

Branch,

NRR (IPAS)

DOCUMENT NAME:

G: iBRANCHSiNM960101. BSN

To ccociva ~ ccpy op ahia dceecs,

icaiicaaa la cd baca

C'

Copy atitixaa

a< acisaa/cockgaaa

'F ~ Copy <<4th aculeus/cocicaoco

ii'

No ocpy

OFFICE

NAME

DATE

RI

DRP

BNorris

BS

04/08/96

RI

DRP

RConte

RI

DRP

OFFICIAL RECORD

COPY

0