ML17059B103

From kanterella
Jump to navigation Jump to search
Notification of 960411 Meeting W/Nmp in Lycoming,Ny to Discuss Results of Integrated Performance Assessment Program Insp Conducted on 960303-22
ML17059B103
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/02/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9604090055
Download: ML17059B103 (6)


Text

April 2, 1996 U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING No. 96-30 Licensee:

Facility:

Docket No.:

Time 5 Date:

Location:

Purpose:

NRC Attendees:

Licensee Attendees:

Niagara Mohawk Power Corporation (NHPC)

Nine Mile Point Nuclear Power.Station Units 1 and 2

50-220 and 50-410 2:00 p.m. Thursday, April ll, 1996 Nine Mile Point Nuclear Learning Center Room Al/A2

.East Lake Road

Lycoming, New York (to the west of the plants)

Exit meeting (open to the public) to discuss the results of the Integrated Performance Assessment Program (IPAP) Inspection conducted March 3 through March 22, 1996.

T. Hartin, Regional Administrator, Region I (RI)

R. Gallo, Acting Deputy Director, Division of Reactor

Projects, RI D. Norkin, IPAP Team Hanager, Office of Nuclear Reactor Regulation (NRR)

S. Malur, IPAP Team Leader, NRR B. Sylvia, Executive Vice President Nuclear R. Abbott, Vice President - Nuclear Generation C. Terry, Vice President Nuclear Engineering M. HcCormick Jr., Vice President-Nuclear Safety Assessment 8 Support N. Rademacher, Plant Manager NHPl J.

Conway, Plant Manager - NHP2 K. Dahlberg, General Manager Nuclear Projects Note:

This meeting is open to the public for observation.

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., April 9,

1996, via telephone call to Richard Conte, Region I, at (610 337-5183.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to Richard J.

Conte, Chief, Reactor Project Branch No. 5, U.S. Nuclear Regulatory Commission, Region I, 475 Allendale Road, King of Prussia, PA,

19406, (610) 337-5183, no later than two business days prior to the meeting.

9604090055 960402 PDR ADQCK 05000220 PDR Prepared By:

Richard Conte, Chief Projects Branch No.

5 Division of Reactor Projects

Distribution:

B. Sylvia, Executive Vice President, Nuclear PUBLIC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI-DRP Division Secretary, RI DRS Division Secretary, RI DNHS Division Secretary, RI DRHA Division Secretary, RI Region I Receptionist

D stribution Via E-Nail J.

J.

H.

B.

R.

J.

S.

W.

A.

R.

S.

C.

S.

W.

N.

S.

D.

R.

H.

B.

R.

R.

D.

Taylor, Executive Director for Operations Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

Grimes, Director, Division of Operating Reactor Support, NRR

Spessard, Director', Division of Technical
Support, NRR Lieberman, Director, Office of Enforcement Lewis, Office of General Counsel (OGC)

Russell, Director, Office of Nuclear Reactor Regulation

Thadani, Associate Director for Inspection and Technical Assessment, NRR Zimme'rman, Associate Director for Projects, NRR Varga, Director, Division of Reactor Projects - I/II, NRR Miller, Acting Assistant Director for Region I Reactors, NRR
Bajwa, RPEB, NRR
Dean, Regional Coordinator, OEDO Green, Jr., Policy Development 5 Technical Support Branch
Shankman, Acting Director, Project Directorate I-4, NRR
Hood, NRR
Conte, RI, DRP Eichenholz, RI, DRP Norris, RI, Nine Mile Point Skokowski, RI, Nine Mile Point Gallo, RI, DRP
Screnci, PAO, RI M. Campion, ORA D. Chawaga, ORA C. Gordon, ORA DOCUMENT NAME:

A:$041196.nmp To receive a oopy of this document, indian In the bcnu C'

Copy without attachmen%nclosure

'E ~ Copy with attachment/enciosure 'N'o copy OFFICE NAME DATE RI/DRP RConte 04/02/96 04/

/96 04/

/96 OFFICIAL RECORD COPY 04/

/96 04/

/96

T