ML17059B102

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 96-29 W/Util on 960412 to Discuss Inoperability of Reactor & Turbine Bldg Pressure Relief Panels & Issues Associated W/Licensee Processes Involving Design Control
ML17059B102
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/02/1996
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9604080373
Download: ML17059B102 (6)


Text

April 2, 1996

'U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING No. 96-29 Licensee:

Niagara Mohawk Power Corporation (NHPAC)

Facility:

Nine Mile Point Nuclear Power Station Units 1 and 2

Docket No.:

50-220/50-410 Time and Date:

10:00 a.m.,

Friday, April 12, 1996 Location:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA Enforcement Conference Room

Purpose:

Enforcement Conference with Niagara Mohawk Power Corporation to discuss the inoperability of the reactor and turbine building pressure relief panels and issues associated with licensee processes involving design control, reportability, safety assessment and procedural adherence.

NRC Attendees:

eering y(Q T. Hartin, Regional Administrator, Region I R. Gallo, Acting Deputy Director, Division of Reactor Projects (DRP)

R; Conte, Chief, Projects Branch 5, (DRP)

S.

Shankman, Acting Deputy Director, Project Directorate I-l, Office of Nuclear Reactors Regulation (NRR)

H. Modes, Chief, Civil Mechanical and Haterials Engineering Branch, Division of Reactor Safety D. Hood, Projects

Manager, (NRR)

H. Eichenholz, Project Engineer, (DRP)

B. Norris, Senior REsident Inspector, DRP R. Skokowski, Resident Inspector, DRP H. Hartzman, Technical

Reviewer, Mechanical Engineering
Branch, (NRR)

D. geng, Technical Reviewer, Structural Engin Branch (NRR)

Licensee Attendees:

B. Sylvia, Executive Vice President, Nuclear R. Abbott, Vice President, Nuclear Generation C. Terry, Vice President, Nuclear Engineering N. Rademacher, Unit 1 Plant Manager W. Yaeger,'nit 1 Engineering Manager M. Alvi, Unit 1 Supervisor of Structural Engineering D. Wolniak, Manger, Licensing A. Zallnick, Licensing Engineer G. Wilson, In-house Council M. Wetterhahn, Legal Consultant Note:

This meeting is open to the public for observation.

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., April 10,

1996, via telephone call to Richard Conte, Region I at (610) 37-5183.

Handicapped persons requiring assistance to attend the meeting shall make their request known to Richard J.

Conte, Chief, Reactor Projects Branch No. 5, U.S. Nuclear Regulatory Commission, Region I, 475 Allendale Road, King of Prussia, PA,
19406, (610) 337-5183, no later than two business days prior to the meeting.

Prepared by:

Richard J.

Cont Chief Projects Branch No.

5 Division of Reactor Projects Distribution:

B. Sylvia, Executive Vice President, Nuclear

'UBLIC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRMA Division Secretary, RI Region I Receptionist

Distribution:

B. Sylvia, Executive Vice President, Nuclear PUBLIC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNHS Division Secretary, RI DRHA Division Secretary, RI Region I Receptionist

April 2, 1996 U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING No. 96-30 Licensee:

Facility:

Docket No.:

Time 5 Date:

Location:

Purpose:

NRC Attendees:

Niagara Mohawk Power Corporation (NMPC)

Nine Mile Point Nuclear Power Station Units 1 and 2

50-220 and 50-410 2:00 p.m. Thursday, April ll, 1996 Nine Mile Point Nuclear Learning Center Room Al/A2 East Lake Road

Lycoming, New York (to the west of the plants)

Exit meeting (open to the public) to discuss the results of the Integrated Performance Assessment Program (IPAP) Inspection conducted March 3 through March 22, 1996.

T. Hartin, Regional Administrator, Region I (RI)

R. Gallo, Acting Deputy Director, Division of Reactor

Projects, RI D. Norkin, IPAP Team Manager, Office of Nuclear Reactor Regulation (NRR)

S. Halur, IPAP Team Leader, NRR Licensee Attendees:

B. Sylvia, Executive Vice President.

Nuclear R. Abbott, Vice President Nuclear Generation C. Terry, Vice President Nuclear Engineering H. McCormick Jr., Vice President-Nuclear Safety Assessment 5 Support N. Rademacher, Plant Manager - NHPl J.

Conway, Plant Manager NHP2 K. Dahlberg, General Manager Nuclear Projects Note:

This meeting is open to the public for observation.

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., April 9,

1996, via telephone call to Richard Conte, Region I, at (610 337-5183.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to Richard J.

Conte, Chief, Reactor Project Branch No. 5, U.S. Nuclear Regulatory Commission, Region I, 475 Allendale Road, King of Prussia, PA,

19406, (610) 337-5183, no later than two business days prior to the meeting.

Prepared By:

GW Richard Conte,, Chief Projects Branch No.

5 Division of Reactor Projects

3 Distribution Via E-Nail J.

J.

H.

B.

R.

J.

S.

W.

A.

R.

S.

C.

S.

W.

N.

S.

D.

S.

R.

H.

B.

R.

M.

M.

D.

R.

D.

M.

D.

C.

Taylor, Executive Director for Operations Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

Grimes, Director, Division of Operating Reactor Support, NRR

Spessard, Director, Division of Technical
Support, NRR Lieberman, Director, Office of Enforcement Lewis, Office of General Counsel (OGC)

Russell, Director, Office of Nuclear Reactor Regulation Thadani, Associate Director for Inspection and Technical Assessment, NRR Zimmerman, Associate Director for Projects, NRR Varga, Director, Division of Reactor Projects I/II, NRR Miller, Acting Assistant Director for Region I Reactors, NRR

Bajwa, RPEB, NRR
Dean, Regional Coordinator, OEDO Green, Jr., Policy Development

& Technical Support Branch

Shankman, Acting Director, Project Directorate I-4, NRR
Hood, NRR Lewis, Office of the General Counsel (OGC)
Conte, RI, DRP Eichenholz, RI, DRP Norris, RI, Nine Mile Point Skokowski, RI, Nine Mile Point
Modes, DRS
Hartzman, NRR
Jeng, NRR Gallo, RI, DRP
Screnci, PAO, RI
Campion, ORA
Chawaga, ORA
Gordon, ORA DOCUMENT NAME:

A:~t04-12-96.NHP To recive a copy of thh document, indicate in the boc 'C' Copy without attachmen%nclosure

'E' Copy with attachmen%nciosure

'N' No copy OFFICE DATE RI/DRP HEichenhol 04/02/96 RI/DRP RConte 04/m/

6 04/

/96 OFFICIAL RECORD COPY 04/

/96 04/

/96