Text
April 19, 19 o
U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANTMEETING No. 95-39 Licensee:
Facility:
Docket No:
Niagara Mohawk Power Corporation Nine Mile Point Nuclear Power Station 50-410 Time and Date:
Location:
10:00 a.m., May 15, 1995 DRP Conference Room, Region I Office
Purpose:
Enforcement Conference to Discuss the Unit 2 Standby Diesel Generator Operability Issues Described in Combined Inspection Report Nos. 50-220/95-01 and 50-410/95-01 NRC Attendees:
R. Cooper, II, Director, Division of Reactor Projects, DRP C. Cowgill, Chief, Projects Branch No. 1, DRP L. Doerflein, Chief, Reactor Proejcts Section 1A G. Edison, Project Manager, Office of Nuclear Reactor Regulation W. Ruland, Chief, Electrical Section, Division of Reactor Safety D. Holody, Enforcement Coordinator K. Smith, Regional Counsel Licensee Attendees:
B. Sylvia, Executive Vice President, Nuclear L. Storz, Vice President, Nuclear Generation K. Dahlberg, Plant Manager, Unit 2 R. Dean, Manager, Technical Support, Unit 2 T. Fiorenza, System Engineer NOTE:
This meeting is closed to the public.
Attendance by additional NRC personnel should be made known by May 10, 1995, via telephone call to Mr. Lawrence T. Doerflein, Region I, at 610-337-5378.
Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to Mr. Lawrence T. Doerflein, USNRC, Region I, 475 Allendale Rd.,
King of Prussia, PA 19406, (610) 337-5378, no later than two business days prior to the meeting.
Prepared by:
Original Signed by:
Lawrence T. Doerflein, Chief Reactor Projects Section 1A Division of Reactor Projects 9504260076 9504i9 PDR ADOCK 050004i0 P
PDR OFFICIAL RECORO COPY IE:45
~Dis ril~in (Via E-Mail):
J. Taylor, Executive Director for Operations (EDO)
J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR R. Spessard, Director, Division of Technical Support, NRR J. Lieberman, Director, Office of Enforcement S. Lewis, Office of the General Counsel (OGC)
W. Russell, Director, Office of Nuclear Reactor Regulation A. Thadani, Associate Director for Inspection and Technical Assessment, NRR R. Zimmerman, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - I/II,NRR T. Marsh, Director, Project Directorate I-l, NRR G. Edison, Project Manager, NRR S. Bajwa, RPEB/NRR N. Green, Jr., Policy Development and Technical Support Branch W. Dean, Regional Coordinator, OEDO NRC Resident Inspector D. Screnci, Field Public Affairs Officer, RI V. Dricks, Field Public Affairs Officer, RI D. Chawaga, SLO C. Gordon, SAO M. Campion, ORA
'b PUBLIC B. Ralph Sylvia, Executive Vice President - Nuclear Power State of New York Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Region I Receptionist
L
DOCUMENT NAME:
A:NMPMTG95.
To tcccbe s espy at tttts oaactcat, ttcfccso h ttct bac 'C' Capy tcttbotc stts ncatkadosata
'P ~ Copy wMtsttsctcast&ttotocata
'N ~ Ho copy OFFICE RI/DRP N
RI/DRP NAME RFuhrmeister LDoerflein DATE 04/gg/95 04/]Q /95 OFFICIAL RECORD COPY