Text
1P,R RE00, C+
~
Mp,0 A.00 D$
~0
++*++
I UNITED STATES t NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 April 18, 1995 C~~ <Q Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE NINE MILE POINT NUCLEAR STATION UNIT NO.
1
Dear Mr. Sylvia:
By your application dated March 31, 1995 and affidavit dated March 29,
- 1995, by George B. Stramback of General Electric Company, you submitted GE-NE-B13-01739-04, "Nine Mile Point Unit 1 Shroud Repair Hardware Stress Analysis,"
Revision 0, January
- 1995, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
2.
3.
Information that discloses a process,
- method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; The information identified in the affidavit is classified as proprietary because it contains the supporting Design Record File (DRF) detailed calculations, results and bases for conclusions contained in GE-NE-B13-01739-04, "Nine Mile Point Unit 1 Shroud Repair Hardware Stress Analysis," Revision 0, (GE Proprietary),
January 1995.
This report, previously provided to the
- NRC, and the supporting information identified in the affidavit evaluate a
hardware design modification (stabilizer for the shroud horizontal welds) intended to be installed in a reactor to resolve the reactor pressure vessel core shroud weld cracking concern.
This detailed level of information usually resides in GENE files, only for audit by customers and the NRC.
This information shows in specific detail the processes, codes and methods employed to perform the evaluations summarized in the above identified
~ -". 0 0 Q ()
9504240390 9504i8 j
PDR ADOCK 05000220 PDR~
D
( J/'l/ jI0g J
I f.
fl
Mr. B. Sylvia April 18, 1995 document.
The development and approval of this design modification utilized systems, components, and models and computer codes that were developed at a significant cost to GE, on the order of a million dollars.
The development of the supporting processes, as shown in part in this DRF detailed information, was at a significant additional cost to GE, in excess of a million dollars, over and above the large cost of developing the underlying individual proprietary report information.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from the public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Niagara Mohawk will provide the nonproprietary version by April 30, 1995.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act, request includes your information.
In all review situations, if the NRC makes a
"determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Docket No. 50-220 cc:
See next page Gordon E. Edison, Sr. Project Manager Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
B. Ralph Sylvia Niagara Mohawk Power~poration CC:
Nine Mi e Point Nuclear Station t No.
1 Hark J. Wetterhahn, Esquire Winston
& Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126 Mr. Louis F. Storz Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Ms.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, NY 12223 Hr. Richard B. Abbott Unit 1 Plant Manager Nine Hile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D.
Eddy State of New York Department of Public Service Power -Division, System Operations 3 Empire State Plaza
- Albany, NY 12223 Mr. Martin J. HcCormick, Jr.
Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
Mr. B. Sylvia April 18, 1995 document.
The development and approval of this design modification utilized systems, components, and models and computer codes that were developed at a significant cost to GE, on the order of a million dollars.
s The development of the supporting processes, as shown in part in this DRF detailed information, was at a significant additional
.cost to GE,'n excess of a million dollars, over and above the large cost of developing the underlying individual proprietary
,.report information.,
t We have, reviewed your application and the, material in accordance with the requirements of 10 CFR 2.790
- and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
I u
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from the public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b)'f the Atomic'Energy Act of 1954, as amended.
Niagara Mohawk will'provide the nonproprietary version by April 30, 1995.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified'in advance of any public disclosure.
Sincerely, Original signed by:
Gordon E. Edison, Sr. Project Manager Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc:
See next page Distribution Docket File PUBLIC PDI-1 RF CCowgill, RI SLittle SVarga JZwolinski TMarsh GEdisop
- HPSiemen, OGC DOCUMENT NAME: G:iNMPliNMPI.WTH To receive e copy of this document, indicete in the box: "C" ~ Copy without enclosures "E" ~ Copy with enc osure "N"
a No copy OFFICE NAME DATE LA:
PD1-Litt4 04/J /95 OGC
('.
PH: PD1-1 HPSiemien~ h GEdison 04/,<I/95
'4/
/95 OF ICIA R
CORD COP '
~
LHa 04/
/95
4 P
~ J J
1 J
l
)l P