Nrrrs.
Ralph Sylvia ~
Executive Vice Pres ident, Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P. 0.
Box 63
- Lycoming, NY 13093 March 10, 1995 Distribution:
I Docket File PUBLIC PD I-l Rdg.
SVarga JZwolinski erlinger LMarsh CVogan DBrinkman CMcCracken EConnell HGamberoni OGC ACRS (4)
CCowgill, RI RJenkins
SUBJECT:
- RESPONSE, TO RE(VEST FOR ADDITIONAL'NFORMATION REGARDING USE OF THERMO-LAG 330-1 AT, NINE. MILE POINT NUCLEAR STATION UNIT NO.
1 (NHP-1)
(TAC NO. H85574) i
Dear Hr. Sylvia:
By letter dated December 14,
- 1994, Niagara Mohawk Power Corporation (NHPC) responded to "our September 15, 1994, request for additional information regarding use of Thermo-Lag 330-1 at NHP-1.
NMPC's response stated that NHPC has decided to replace all existing Thermo-Lag 330-l,fire barriers at NHP-1 with an acceptable fire barrier material and that this modification is scheduled for field completion by December 31, -1995.
The NRC staff has reviewed NHPC's December 14,
- 1994, response.
Based on our
- review, we have determined that except for an assessment of the ampacity impact of the Thermo-Lag material on cable life for previous operation of safety-related circuits, the information requested in Generic Letter 92-08, nThermo-Lag 330-1 Fire Barriers,"
has been provided and our 'actions tracked by TAC No. M85574 are complete.
Please advise us, in writing, when the modification described in NHPC's December 14, 1994, letter has been implemented.
NHPC should retain all documentation related to the resolution of the concerns with Thermo-Lag fire barrier systems for future NRC audits or inspections.
This documentation should include an evaluation of the ampacity impact of Thermo-Lag material on cable life for previous operation of safety-related circuits.
If you have any questions regarding this matter, please contact me at 301-415-1409.
Sincerely, Original signed by:
Docket No. 50-220 cc:
See next page Donald S. Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation 9503i70i23 9503i0 PDR ADQCK 05000220 P
PDR DOCUMENT NAME:
H: 'I,NMPI'jj,NH185574. RAI To receive a copy of this document, Indicate in the box: "C" Copy without enciosures "E
~ Copy with enciosures "N" ~ No copy OFFICE LA:PDI-1 PH: PDI-1 E
BC: EEL P
BC:SPLM D:PDI-1 NAME CVo an~
DBrinkman:c
. CBerli CMcCra l
LHarsh DATE 02@.
95 02 2.+95
/a 95 0, /
/95
~~
/95 OFFICIAL RECORD COPY 150 j.I3 Imtjp FiI(jb Ql(ij(jtpp Lamps
) ) (~>(,'j
pe AEG0
'o Cy cc <
0
"+*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 205554001 March 10, 1995 Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 SUNECT:
RESPONSE
TO REQUEST FOR ADDITIONAL INFORMATION REGARDING USE OF THERHO-LAG 330-1 AT NINE MILE POINT NUCLEAR STATION UNIT NO.
1 (NHP-1)
(TAC NO. H85574)
Dear Hr. Sylvia:
By letter dated December 14,
- 1994, Niagara Mohawk Power Corporation (NHPC) responded to our September 15, 1994, request for additional information regarding use of Thermo-Lag 330-1 at NHP-1.
NHPC's response stated that NHPC has decided to replace all existing Thermo-Lag 330-1 fire barriers at NHP-1 with an acceptable fire barrier material and that this modification is scheduled for field completion by December 31, 1995.
The NRC staff has reviewed NHPC's December 14,
- 1994, response.
Based on our review, we have determined that except for an assessment of the ampacity impact of the Thermo-Lag material on cable life for previous operation of safety-related circuits, the information requested in Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers," has been provided and our actions tracked by TAC No. H85574 are complete.
Please advise us, in writing, when the modification described in NHPC's December 14, 1994, letter has been implemented.
NHPC should retain all documentation related to the resolution of the concerns with Thermo-Lag fire barrier systems for future NRC audits or inspections.
This documentation should include an evaluation of the ampacity impact of Thermo-Lag material on cable life for previous operation of safety-related circuits.
If you have any questions regarding this matter, please contact me at 301-415-1409.
Sincerely, Docket No. 50-220 cc:
See next page Donald S. Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
r t
~) w~/
B. Ralph Sylvia Niagara Hohawk Power Corporation Nine Hile Point Nuclear Station Unit No.
1 CC:
Mark J. Wetterhahn, Esquire Winston h Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126 Hr. Louis F. Storz Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 Gary D. Wilson, Esquire Niagara Hohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 4?5 Allendale Road King of Prussia, PA 19406 Ms.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, NY 12223 Hr. Richard B. Abbott Unit 1 Plant Hanager Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, NY 12223 Mr. Martin J.
McCormick, Jr.
Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093