Amend 151 to License DPR-63,allowing one-time Extension of Second 10-yr Service Period for Primary Containment Integrated Leakage Rate (Type a) Test
ML17059A591
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/29/1994
From: Michael Case
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17059A592 List:
References
NUDOCS 9501090326
Download: ML17059A591 (8)


Text

'd

~P,R 8500 Wp0 Cy A,

O IVl9 4~

~O

+w*w+

UNITED STATES NUCLEAR REGULATORY CPMMISSION WASHINGTON, D.C. 20555-0001 AGARA MOHAWK POWER CORPORATION DOCKET NO. 50-220 NI LE OI T NUCLEAR ST T ON UNI NO.

1 AMENDMENT TO FACILITY OP RATING LICENSE Amendment No.

15i License No.

DPR-63 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated August 26,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 1

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such. activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-63 is hereby amended to read as follows:

9501090326 941229 PDR ADOCK 05000220 P

PDR

(~)

c tio s The Technical Specifications contained in Appendices A and B,

as revised through Amendment No.

151, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

oecember

~9, 1994 gear~

chael

ase, Acting D re or Project ectorate I-I Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ACHM T TO LICENSE AMENDMENT M

D ENT N

151 0 FACILITY OPERATING LICENS NO.

DPR-63 DOCKET NO. 50-220 Revise Appendix A as follows:

emove Pa e

134 Insert Pa e

134

LIMITINGCONDITION FOR OPERATION SURVEILLANCEREQUIREMENT (3)

When adding the leakage rate measured during a Type C test to the results of a Type A test, the leakage rate shall be determined using minimum pathway analysis.

c.

~Fre

~~n (1)

Three Type A tests shall be conducted during each ten year service interval at approximately equal intervals.

The third test will be conducted when the plant is shutdown for the 10 year inservice inspections."

(2)

Retesting (a)

If a Type A test fails to meet the acceptance criteria of 4.3.3.b.(1), a Corrective Action Plan that focuses attention on the cause of the problem shall be developed and implemented.

A Type A test that meets the require-ments of 4.3.3.a.(3) and 4.3.3.b.(2) is required prior to plant start-up.

A report of the Corrective Action following the failed Type A shall be submitted to the NRC for review and approval with the Containment Leak Test Report.

. The duration of the second ten year service interval will be extended to correspond with the end of the ISI interval.