D.
This license is subject to the following additional conditions for the protection of the environment:
(1)
The licensee will complete construction of a new radwaste facility in conformance with the design defined and evaluated in the FES, to be operational no later than June 1976.
(2)
Deleted by License Amendment No.
51 (3)
Deleted by License Amendment No. 51.
(4)
Securit Plan Guard Trainin and Safe uards Contin enc Plans The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans, including amendments made pursuant to the provisions of the Miscellaneous Amendments, and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, entitled "Nine Mile Point Nuclear Station Physical Security Plan" with revisions submitted through June 9,
1994; "Nine Mile Point Nuclear Station Guard Training and gualification Plan," with revisions submitted through September 30, 1993; and "Nine Mile Point Nuclear Station Safeguards Contingency Plan," with revisions submitted through October 1,
1992.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
Paragraph 2.D(5) of the license has been combined with paragraph 2.D(4) as amended above into a single paragraph.,
9411090065 941104 PDR-ADOCK 05000220 P
PDR Amendment No.
150
vi)
A schedular exemption to 10 CFR 50.55a(h) for the Neutron Monitoring System until completion of the first refueling outage to allow Niagara Mohawk Power Corporation to provide qualified isolation devices for Class lE/non-IE interfaces described in Niagara Mohawk Power Corporation's letters of June 23, 1987 (NMP2L 1057) and June 25, 1987 (NMP2L 1058).
(Section 7.2.2.10, SSER 6).
For the schedular exemptions in iv), v),
and vi), above, Niagara Mohawk Power Corporation, in accordance with its letter of October 31,
- 1986, shall certify that all systems, components, and modifications have been completed to meet the requirements of the regulations for which the exemptions have been granted and shall provide a summary description of actions taken to ensure that the regulations have been met.
This certification and summary shall be provided 10 days prior to the expiration of each exemption period as described above.
The exemptions set forth in this Section 2.0 are authorized by law, will not present an undue risk to public health and safety, and are consistent with the common defense and security.
These exemptions are hereby granted.
The special circumstances regarding each exemption are identified in the referenced section of the Safety Evaluation Report and the supplements thereto.
The exemptions in ii) through vi) are granted pursuant to 10 CFR 50. 12.
With these exemptions, the facility will operate to the extent authorized herein, in conformity with the application, as
- amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans, including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, entitled "Nine Mile Point Nuclear Station Physical Security Plan" with revisions submitted through June 9, 1994; "Nine Mile Point Nuclear Station Guard Training and gualification Plan," with revisions submitted through September 30, 1993; and "Nine Mile Point Nuclear Station Safeguards Contingency Plan," with revisions submitted through October 1,
1992.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
F.
Except as otherwise provided in the Technical Specifications or Environmental Protection
- Plan, Niagara Mohawk Power Corporation shall report any violations of the requirements contained in Section 2.C of this license in the following manner:
initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System, with written followup within 30 days in accordance with the procedures described in 10 CFR 50.73(b),
(c),
and (e).
Amendment No.
58
4