Amend 57 to License NPF-69,amending TS to Delete Requirement That Surveillance for Demonstrating Svc Water Sys Pump Performance Be Performed During Shutdown
ML17059A451
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/13/1994
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17059A452 List:
References
NUDOCS 9409190026
Download: ML17059A451 (10)


Text

~p,g AKCy Wp0 Op

++*<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555.0001 GA OH OW ORPORATIO

~0050

0. 50-5

~

IN H

OIN NUCLEA S

ON UNIT CI P

A G

IC S

Amendment No. 57 License No. NPF-69 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated September 2,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter 1;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-69 is hereby amended to read as follows:

9409190026 9409f8 I

PDR ADQCK 05000410 P

PQRJ

(2) echnica S ec cations and vironmental Prote tion Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix 8, both of which are attached

hereto, as revised through Amendment No. 57 are hereby incorporated into this license.

Niagara Hohawk Power Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMHISSION cled PA~

Charles Hiller, Acting Assistant Director for Region I Reactors Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 13, 1994

TACHMENT TO ICENS AMENDMEN AMENDME T NO. 57 0

F CIL OPERATING ICENS NO. NPF-69 DOCKET NO. 50-410 Revise Appendix A as follows:

emove e

3/4 7-3 3/4 7-6 Insert s

3/4 7-3 3/4 7-6

I,

PLANT SYSTEMS PLANT ERVI E WATER Y TEM PLANT SERVI E WATE Y TEM -

PE ATIN RVEILLAN E RE IREMENT 4.7.1.1

~ 1 (Continued) e.

At least once per 18 months:

1.

Perform a LOGIC SYSTEM FUNCTIONALTEST of the service water pump starting logic.

2.

Verify each pump runs and maintains service water pump discharge pressure equal to or greater than 80 psig with a pump flow equal to or greater than 6500 gpm.

4.7.1.1.2 The Intake Deicing Heater System shall be demonstrated OPERABLE:

a 0 At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the intake tunnel water temperature is greater than or equal to 394F, or b.

At least once per 7 days by verifying that the current of the heater feeder cables at the motor control centers is 10 amps* or more (total for three. phases) at a 518 volts. per divisional heater in each intake structure.

C.

At least once per 18 months by verifying the resistance is a 28 ohms for each feeder cable and associated heater elements in the intake deicing heater systems.

For 7 heater elements in operation.

NINE MILE POINT - UNIT 2 3/4 7-3 Amendment No.

57

PLANT ERVI WATER Y TEM PLANT ERVI E WATER Y TEM -

TD WN S

RVEILLAN E RE IREMEN

, 4.7.1.2.1 (Continued) e.

At least once per 18 months:

1.

Perform a LOGIC SYSTEM FUNCTIONALTEST of the service water pump starting logic.

2.

Verify each pump runs and maintains service water pump discharge pressure equal to or greater than 80 psig with each pump flow equal to or greater than 6500 gpm.

4.7.1.2.2 The Intake Deicing Heater System shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the intake tunnel water temperature is greater than or equal to 39'F, er b.

At least once per 7 days by verifying that the current of the heater feeder cables at the motor control centers is 10 amps* or more (total for three phases) at a 518 volts per divisional heater in each intake structure.

c.

At least once per 18 months by verifying the resistance is a 28 ohms for each feeder cable and associated heater elements in the intake deicing heater systems.

For 7 heater elements in operation.

NINE MILE POINT - UNIT 2 3/4 7-6 Amendment No.