ML17059A415
| ML17059A415 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/29/1994 |
| From: | Brinkman D Office of Nuclear Reactor Regulation |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9408310179 | |
| Download: ML17059A415 (6) | |
Text
~g8 REgy Wp
+
0 C
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 29, 1994 Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Hohawk Power Corporation Nine Nile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
SUBJECT:
SITE VISIT BY NRC OFFICE FOR ANALYSIS AND EVALUATION OF OPERATIONAL DATA PERSONNEL
Dear Hr. Sylvia:
As a part of a study being conducted by the NRC Office for Analysis and Evaluation of Operational Data and as previously arranged with Hr. Louis F. Storz of your staff, Mr. William Raughley and a contractor, Hr. Whitney Hansen, will visit Hr. Storz in his office on September 7,
- 1994, from 7:00 a.m. to 10:00 a.m.
The purpose of the visit is to discuss changes in plant performance that occurred from 1985 to 1987 at Davis-Besse Nuclear Power Station.
If you have any questions, please contact me at (301) 504-1409.
Thank you for your cooperation in this matter.
Sincerely, Docket Nos.
50-220 and 50-410 cc:
See next page Donald S. Brinkman, Senior Project Manager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation 94OS3zo>79 9<0829 PDR ADQCK 05000220 P
Mr. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit Nos.
1 and 2
CC:
Mark J. Wetterhahn, Esquire Winston
& Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126 Hr. Louis F. Storz Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse',
NY 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Ms.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, NY 12223 Mr. Hartin J.
HcCormick, Jr.
Vice President Nuclear Safety Assessment'nd Support Niagara Hohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Mr. Richard B. Abbott Unit 1 Plant Manager Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hr. Kim A. Dahlberg Plant Manager, Unit 2 Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Hr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, NY 12223 Mr. David K. Greene Manager Licensing Niagara Hohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, NY 12223 Hr. Richard H. Kessel Chair and Executive Director State Consumer Protection Board 99 Washington Avenue
- Albany, NY 12210 Hr. William T. O'Conner, Jr.
Manager Regulatory Affairs Toledo Edison Company Davis-Besse Nuclear Power Station 5501 North State Route 2
Oak Harbor, OH 43449
r II p
Ci iV I
C Hr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation Nine Mile,Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 August 29, 1994
SUBJECT:
SITE VISIT BY NRC OFFICE FOR ANALYSIS AND EVALUATION OF OPERATIONAL DATA PERSONNEL
Dear Hr. Sylvia:
As a part of a study being conducted by the NRC Office for Analysis and Evaluation of Operational Data and as previously arranged with Hr. Louis F. Storz of your staff, Hr.. William Raughley and a contractor, Hr. Whitney Hansen, will visit Mr. Storz in his office on September 7,
- 1994, from 7:00 a.m. to 10:00 a.m.
The purpose of the visit is to discuss changes in plant performance that occurred from 1985 to 1987 at Davis-Besse Nuclear Power Station.
If you have any questions, please contact me at (301) 504-1409.
Thank you for your cooperation in this matter.
Sincerely, Original signed by:
Donald S. Brinkman, Senior Project Manager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket Nos.
50-220 and 50-410 cc:
See next page Distribution:
Docket File'UBLIC PDI-1 Reading SVarga CMiller HCase CVogan DBrinkman OGC ACRS (10)
CCowgill, RGN-I LGundrum, 013/F/15 DOCUMENT NAME:
G:iNMPliNM50220.LTR To receive e copy of this document. indicate in the box: "C" ~ Copy without enciosures "E" ~ Copy with enclosures "N" ~ No copy OFFICE LA:PDI-1 NAME CVo an DATE 08/2 /94 D'PDI-1 HCase
/'8//94 PH: PDI-1 DBrinkman:s m
08/~/94 OFFICIAL RECORD COPY 08/
/94 08/
/94
I