ML17059A380
| ML17059A380 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/03/1994 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9408100041 | |
| Download: ML17059A380 (6) | |
Text
AUG 3 1994 Docket No. 50-410 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, New York 13093
Dear Mr. Sylvia:
SUBJECT:
REQUALIFICATIONPROGRAM INSPECTION - NINE MILEUNIT 2 In a telephone conversation on August 3, 1994, Mr. R. Slade and Mr. J. Williams made arrangements for the NRC to inspect the licensed operator requalification program at the Nine Mile Unit 2 facility.'he inspection is planned for the week of November 28, 1994, which coincides with your regularly-scheduled requalification examination cycle.
The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests'as necessary to support the NRC's inspection program needs.
In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by November 1, 1994.
Mr. Slade has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
The request for requalification examination material is covered by the Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires on October 31, 1995.
The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering, copying, and mailing the required material, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F-30, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork ReductIon Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
I E.
9408i 0004 i 940B03 PDR ADOCK 050004i0 V
AUG 8 1994 Mr. B. Ralph Sylvia, Thank you for your cooperation in this matter. Ifyou have any questions regarding this inspection, please contact me at (610) 337-5211.
Sincerely, Glenn W. Meyer, Chief BWR & PWR Sections Division of Reactor Safety CC:
L. Storz, Vice President - Nuclear'Generation C. Terry, Vice President - Nuclear Engineering M. McCormick, Vice President, Safety Assessment & Support R. Abbott, Unit 1 Plant Manager K. Dahlberg, Unit 2 Plant Manager D. Greene, Manager, Licensing R. Slade, Unit 2 Operations Training General Supervisor R. Tessier, Training Superintendent J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Energy & Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee
AUG 8 89$
Mr. B. Ralph Sylvia bcc w/encl:
Region I Docket Room (with concurrences)
C. Cowgill, DRP L. Nicholson, DRP R. Fuhrmeister, DRP H. Williams, Chief Examiner, DRS OL Facility File (V. Curley, DRS)
DRS File RI:DRS Williams/dmg aW~
08/03/94>
RI:DRS Meyer 08/5/94 OFFICIALRECORD COPY A:NM112894.60