ML17059A364
| ML17059A364 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/20/1994 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| NUDOCS 9407260035 | |
| Download: ML17059A364 (6) | |
Text
Docket No. 50-410 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation Nine MilePoint Nuclear Station P.O. Box 63 Lycoming, New York 13093
Dear Mr. Sylvia:
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR RETAKE EXAIVHNATIONS-NINE MILE, UNIT2 In a telephone conversation on July 8, 1994, between Mr. J. Williams and Mr. C. Grossman, arrangements were made for the administration of licensing examinations at the Nine Mile Point Station, Unit 2.
The written examinations and operating tests are scheduled for the week of October 24, 1994.
Your staff willbe given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards," ES-201.
To prepare the examinations and meet the above schedule, it willbe necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by August 1, 1994.
Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.
The NRC willprepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.
In order to conduct the requested examinations, it willbe necessary for your staff to provide adequate space and accommodations on the date noted above.
The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that willbe in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary reactor and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC willbe able to review the applications and the medical certifications and evaluate any requested
. pp 9407260035 940720 PDR ADOCK 050004l0 V
PDR y$y o
JUl 2 0 K84 Mr. B. Ralph Sylvia waivers. Ifthe applications are not received at least 30 days before the examination date, a postponement may be necessary.
Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995.
The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per
- response, includes gathering, xeroxing, and mailing the required material.
Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
Thank you for your consideration in this matter.
Mr. Grossman has been advised of the NRC guidelines and policies addressed in this letter. Ifyou have any questions on the evaluation process, please contact me at (610) 337-5211.
Sincerely, Glenn W. Meyer, Chief BWR &PWR Sections Division of Reactor Safety
0
JUL 2 0 $94 Mr. B. Ralph Sylvia CC:
L. Storz, Vice President - Nuclear Generation C. Terry, Vice President - Nuclear Engineering M. McCormick, Vice President, Safety Assessment & Support R. Abbott, Unit 1 Plant Manager J. Mueller, Unit 2 Plant Manager D. Greene, Manager, Licensing R. G. Smith, Superintendent of Training R. Sanaker, General Supervisor - Operations Training (NMP1)
R. Slade, General Supervisor - Operations Training (NMP2)
R. Tessier, Manager, Nuclear Training J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Energy &Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee bcc:
Region I Docket Room (with concurrences)
C. Cowgill, DRP L. Nicholson, DRP R. Fuhrmeister, DRP J. Williams, Examiner, DRS OL Facility File DRS File RI:DRS Williams/dm 07/13/94 7 )
RI:DRS Meyer 07$ /94 OFFICIALRECORD COPY A:NM1024.94
0
'!