ML17059A260
| ML17059A260 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/07/1994 |
| From: | Capra R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17059A261 | List: |
| References | |
| NUDOCS 9404180291 | |
| Download: ML17059A260 (8) | |
Text
~ )
gp,8 RE0y Cg 0
<<+*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NIAGARA MOHAWK POWER CORPORATION
~OD KET..
-22 NINE MILE POINT NUC AR S ATION UN NO.
1 AME DMENT TO'FAC ITY OPERATING LICENS Amendment No. 148 License No.
DPR-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
. A.
The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated November 18,
- 1993, complies with the standards and requirements of the Atomic Energy Act. of 1954, as amended (the.
Act) and the Commission's rules and regulations set forth in 10 CFR,-,
Chapter I; B.
The facility will operate in conformity with-the application, the provisions of the Act, and the rul.es and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without= endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be. inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C;(2) of Facility Operating License No.
DPR-63 is hereby amended to read as follows:
9404i80292 940407 PDR ADOCK 05000220 P
'DR
(2) c fic t'ons
'I
~
g
~
III 4+it The Technical Specifications. contained in Appendices A and B;:-as revised through Amendment No.148
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the.Technical Specifications.
3.
This license amendment is effective as of the date of its issuance to be implemented prior, to startup from the next refueling outage.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 7, 1994 Qw~
+ Robert A. Capra, Director Project Directorate. I-lii Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
gl
\\
TTACHMENT TO ICENS AM NDMENT 0
148 TO FACILITY OP RA ING LICENS 0.
DP -6 DOCKET NO. 50-2 0
,h P
Revise Appendix A as follows:
Remove a
238 I sert P
e 238
I~
TABLE 3.6.2i (cont'd)
DIESEL GENERATOR INITIATION Limi in Condition for 0 eration
~Parame er Se Point Inverse Time Undervolta e Rela s Loss of Power Rela Dro ou 0 era 'n Time a.
4.16kV PB 102/103 Emergency Bus Undervoltage (Loss of Voltage) 4.16kV PB 102/103 Emergency Bus Undervoltage (Degraded Voltage) a 3200 volts a3705 volts 0 volts ~3.2 seconds
> 3.4 seconds (60 seconds (a)
The operating time indicated in the table is the time required for the relay to operate its contacts when the voltage is suddenly decreased from operating voltage level values to the voltage level listed in the table above.
(b)
The operating time indicated in the table is the minimum time required to clear voltage transients due to load sequencing to avoid spurious separation from offsite power.
(c)
The operating time indicated in the table is the maximum time allowable to preclude load damage or trip device actuation at voltages below the degraded voltage setpoint of 3705 volts.
AMENDMENTNO. Qk 148 238