~y,8 RKQ0 (4
0 0'!
gO
+w*e+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 NIAGARA MOHAWK OW R CORPORATION DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
47 License No. NPF-69 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated April 30,
- 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter 1;
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Speci.fications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-69 is her eby amended to read as follows:
93091500hb 930907 PDR ADQCK 05000412' PDR
'I
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No.
47 are hereby incorporated into this license.
Niagara Mohawk Power Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 7, i993 Robert A. Capra, Director Project Directorate I-I Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
ACHMENT 0 LICENSE AMENDMENT MENDMENT NO. 47 TO FACILITY OPERATING LICENSE NO. NPF-69 DOCKET NO. 50-410 Revise Appendix A as follows:
Remove Pa e
3/4 6-43 Insert Pa e
3/4 6-43
Al M Y TE 3.6.5.3 Two independent standby gas treatment (SGTS) subsystems shall be OPERABLE.
O>>OS
..3.
hCXIQ5:
a.
With one standby gas treatment subsystem inoperable:
In OPERATIONALCONDITION 1, 2 or 3, suspend all VENTING or PURGING of the drywell and/or suppression chamber** within 30 minutes, and restore the inoperable subsystem to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
In OPERATIONALCONDITION *, restore the inoperable subsystem to OPERABLE status within 7 days, or place the operable SGTS subsystem in operation or suspend
)
handling of irradiated fuel in the reactor building, CORE ALTERATIONS,and.
operations with a potential for draining the reactor vessel.
The provisions of Specification 3.0.3 are not applicable.
The provisions of Specification 3.0.4 are not applicable provided an operable SGTS subsystem is in operation.
b.
With both standby gas treatment subsystems inoperable:
2.
In OPERATIONALCONDITION 1, 2, or 3, suspend all operations involving VENTING, PURGING, or pressure contrd of the drywell or suppression chamber and initiate action within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and in COLD SHUTDOWN within the fdlowing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
In OPERATIONALCONDITION *, suspend handling of irradiated fuel in the reactor building, CORE ALTERATIONSor operations with a potential for draining the reactor vessel.
The provisions of Specification 3.0.3. are not applicable.
When irradiated fuel is being handled in the reactor building and during CORE ALTERATIONSand operations with a potential for draining the reactor vessel.
The requirement to suspend VENTING or PURGING with one inoperable SGTS subsystem shall not apply to the use of valves 2CPS'AOV1 08 (1&nch) and 2CPS'AOV1 10 (14-inch), a 2CPS'AOV109 (12~nch) and 2CPS'AOV111 (12~nch), for primary containment pressure contrd, provided 2GTS'AOV101 is dosed, and its inch bypass line is the only flow path to the standby gas.treatment system.
NINE MILE POINT - UNIT2 3/4 &43 Amendment No. 47 L