Amend 45 to License NPF-69,revising TSs 6.8.2 & 6.8.3c to Require Approval of Plant Procedures by Branch Manager for Functional Area of Procedure Rather than Requiring Approval of Procedures by Plant Manager
ML17058B884
Person / Time
Site: Nine Mile Point 
Issue date: 08/09/1993
From: Capra R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17058B883 List:
References
NUDOCS 9308260088
Download: ML17058B884 (8)


Text

gag RK00 0

I 0

I CI Vg+n gO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 G

RA MOH WK POWER COR ORAT 0 DOCKET NO 50-410 NE MILE POIN NUCLEAR STATION UNIT 2 ENDMENT TO FACILITY OPERATING LICENSE Amendment No. 45 License No. NPF-69 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated May 26,

1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter 1;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) 'of Facility Operating License No. NPF-69 is hereby amended to read as follows:

9308260088 930809 )~

PDR ADDCK 05000410',

PDR

(2) c ical S ecif c t ons and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached

hereto, as revised through Amendment No. 45 are hereby incorporated into this license.

Niagara Mohawk Power Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 9, 1993 Robert A. Capra; Director Project Directorate I-I Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

ACHMENT TO LICENSE AMENDMENT MENDMENT N0.45 TO FACILITY OPERATING LICENSE NO.

NP -69 DOCKET NO. 50-410 Revise Appendix A as follows:

emove Pa e

6-16 Insert Pa e

6-16

DMINI TRATIVE N

L 6.8 f D

A D

A 6.8.1 (Continued) d.

Surveillance and test activities of safety-related equipment e.

Security Plan implementation f.

Emergency Plan implementation g.

Fire Protection Program implementation h.

PROCESS CONTROL PROGRAM implementation i.

OFFSITE DOSE CALCULATIONMANUALimplementation and j.

Quality Assurance for effluent and environmental monitoring.

P R V 6.8.2 Each procedure of Specification 6.8.1, and changes thereto, shall be reviewed in accordance with Specification 6.5.2 and approved prior to implementation by the branch manager for the functional area of the procedure or higher levels of management as governed by administrative procedures.

Each procedure of Specification 6.8.1 shall be reviewed periodically as set forth in administrative procedures.

TEMP RA N

E 6.8.3 Temporary changes to procedures of Specification 6.8.1 may be made provided:

a.

The intent of the original procedure is not altered; b.

The change is approved by two members of the unit management staff, at least one of whom holds a Senior Operator license on the unit affected; and c.

The change is documented, reviewed in accordance with Specification 6.5.2 and approved within 14 days of implementation by the branch manager for the functional area of the procedure or higher levels of management as governed by administrative procedures.

NINE MILE POINT - UNIT. 2 6-16 Amendment No.~45